Filed: March 29, 2007 EB-2007-0050

Exhibit B Tab 2 Schedule 1 Page 1 of 3

DESCRIPTION OF PROPOSED FACILITIES

1

2

1.0 PROPOSED FACILITIES

3

4

Hydro One proposes to increase the transmission capacity from the Bruce area in order to

5

reliably transmit all of the committed and forecast generation located in the area. A map

6

indicating the geographic location and schematic diagrams of the proposed facilities are

7

provided in Exhibit B, Tab 2, Schedule 2 and Exhibit B, Tab 2, Schedules 4/5/6/7,

8

respectively. Illustrations of the proposed new transmission towers are provided in

9

Exhibit B, Tab 2, Schedule 3.

10

11

The proposed facilities will meet the requirements set out by the OPA in its letter dated

12

March 23, 2007 (see Exhibit B, Tab 6, Schedule 5, Appendix 4). The proposed facilities

13

will be owned and operated by Hydro One, and include the following:

14

15

ƒ A 3 km 500 kV single-circuit line from the Bruce A TS to Bruce Junction along the

16

existing multi-line corridor within the Bruce Power Complex.

17

ƒ A 3 km 500 kV single-circuit line from the Bruce B SS to Bruce Junction along the

18

existing multi-line corridor within the Bruce Power Complex.

19

ƒ A 173 km 500 kV double-circuit line from the Bruce Junction to Milton SS within a

20

widened existing transmission corridor.

21

ƒ Modifications at Milton SS, Bruce A TS and Bruce B SS to accommodate the new

22

transmission line.

23 24

(2)

2.0 DETAILS OF THE PROPOSED FACILITIES

1

2

The proposed transmission project will require the construction of a new 500 kV double-

3

circuit line, as well as appropriate line termination and switching facilities.

4

5

2.1 Overhead Transmission Line Structures

6

7

The total route length of the proposed transmission line within the Bruce Power Complex

8

is 6 km: 3 km of 500 kV single-circuit line from Bruce A TS and 3 km of 500 kV single-

9

circuit line from Bruce B SS, both converging at Bruce Junction.

10

11

The total route length of the proposed double circuit transmission line from Bruce

12

Junction to Milton SS is 173 km. The route passes through four counties and one

13

regional municipality (Bruce, Grey, Wellington, Dufferin, and Halton, respectively) and

14

eleven townships (Kincardine, Brockton, Hanover, West Grey, Southgate, Wellington

15

North, Erin, East Luther Grand Valley, East Garafraxa, Halton Hills and Milton). A map

16

of the project location and the existing transmission facilities is provided in Exhibit B,

17

Tab 1, Schedule 2.

18

19

The proposed line will run adjacent to the existing 500 kV transmission corridor from the

20

Bruce Power Complex to Milton SS. This line will use steel lattice towers and will

21

require the acquisition of land rights to widen the existing transmission corridor (refer to

22

Exhibit B, Tab 6, Schedule 9). To the extent possible, the location of the new towers will

23

be aligned with those of existing towers in order to mitigate visual impact.

24 25

(3)

Filed: March 29, 2007 EB-2007-0050

Exhibit B Tab 2 Schedule 1 Page 3 of 3 2.2 Milton SS Line Termination and Switching Facilities

1

2

Milton SS will require new and modified structures within the station property to

3

accommodate the termination of the two new 500 kV circuits. This proposal will also

4

require modifications to telecommunications facilities at Milton SS to provide status

5

information and control capability to Hydro One’s Ontario Grid Control Centre (OGCC)

6

and status information to the IESO. Modifications and additions to protection and

7

control, SCADA, metering, and AC/DC station service at Milton SS, are required to

8

provide protection, control and status of the new and re-terminated facilities. Since

9

Milton SS is designated as an “NPCC-impactive” station, modifications will have to

10

satisfy the pertinent NPCC requirements for such designation. A schematic diagram

11

showing the proposed configuration at Milton SS is provided at Exhibit B, Tab 2,

12

Schedule 7.

13 14

2.3 Bruce A TS and Bruce B SS Line Terminations and Switching Facilities

15

16

Bruce A TS and Bruce B SS will require new and modified structures to accommodate

17

the termination of the new 500 kV circuits. This proposal will also require modifications

18

to telecommunications facilities at Bruce A TS and Bruce B SS to provide status

19

information and control capability to Hydro One’s OGCC and status information to the

20

IESO. Modifications and additions to protection and control, SCADA, metering, and

21

AC/DC station service at Bruce A TS and Bruce B SS, are required to provide protection,

22

control and status of the new facilities. Since Bruce A TS and Bruce B SS are designated

23

as “NPCC-impactive” stations, modifications will have to satisfy the pertinent NPCC

24

requirements for such designation. A schematic diagram showing the proposed

25

configuration is provided at Exhibit B, Tab 2, Schedule 5 (Bruce A TS) and Exhibit B,

26

Tab 2, Schedule 6 (Bruce B SS).

27 28

(4)

MAP SHOWING LOCATION OF PROPOSED FACILITIES

1

(5)

"

)

"

)

"

)

"

)

"

)

"

)

"

)

"

)

"

)

"

)"

)

"

)

"

)

"

)

"

)

"

)

"

)

"

)

"

)

"

)

"

)

"

)

" )

"

)

"

)

"

)

"

") )

"

)

"

)

"

)

"

)")

Exhibit B-2-2

Canadian Foces BordenBase

LakeHuro n

Proposed Facilities Bruce to Milton Area

Letters A - G - Refer to Attached Cross Sections

West Grey

Caledon

Erin Kincardine

Southgate Brockton

Huron East

Mapleton

Milton Central Huron

Essa

Minto

Mono Grey Highlands

North Perth South Bruce

Howick

Mulmur

Huron-Kinloss

Woolwich Chatsworth

Wellington North

Ashfield- Colborne- Wawanosh

Clearview

Amaranth Melancthon

Brampton

Puslinch

Halton Hills Centre Wellington

Morris-Turnberry

King Arran-Elderslie

Innisfil

Guelph/Eramosa

New Tecumseth

Wilmot North Huron

Guelph

Oakville GarafraxaEast

Hamilton Burlington Kitchener

Saugeen Shores

Waterloo

Mississauga

Cambridge

Adjala-Tosorontio

LutherEast Grand Valley

Bradford GwillimburyWest

Vaughan Orangeville

Hanover

Goderich

Blue Mountains

Shelburne

CEDAR TS FERGUS TS

BRONTE TS HANLON TS

HALTON TS ELMIRA TS

MILTON SS BRUCE B SS

PRESTON TS BRUCE A TS

CARDIFF TS GOREWAY TS WINGHAM TS

PALERMO TS HANOVER TS

CAMPBELL TS

BRAMALEA TS PLEASANT TS

ALLISTON TS

GODERICH TS

DETWEILER TS

TRAFALGAR TS MEADOWVALE TS PALMERSTON TS

ORANGEVILLE TS DOUGLAS POINT TS BRUCE HW PLANT B TS

ESSA TS

SEAFORTH TS

KLEINBURG TS BRUCE HW PLANT D TS

TRAFALGAR TS BP STATION

ââ â â â ââ

â âââ â âââ

â â âââ â ââââââ â ââ â â â â ââââ

â â âââââ âââ

â ââââ ââââ â

â â âââ â âââ ââ âââ

â â ââââ

â âââââ â ââ ââ â ââ ââ â ââ ââ

â â ââââ ââ ââ

ââ ââ ââ ââ

âââ âââ â ââ â â

âââ ââ

â ââ â ââ â ââ â â â ââ

ââ ââ â â â ââ

âââ ââ ââ ââ ââ â â

HURON BRUCE

PERTH

PEEL SIMCOE

HALTON R.M.

WATERLOO R.M.

GREY

WELLINGTON

DUFFERIN

HAMILTON - WENTWORTH R.M.

MacGregor Point Provincial Park

Inverhuron Provincial Park

Point Farms Provincial Park

Devils Glen Provincial Park

HIGHWAY 401 1 BLYTH RD 4

HIGHWAY 9 2 COUN

TY RD 3 4

BELGRAVE RD 4 THE GO

RE RD 4

BLU EWAT ER HW Y 2

MISSIS SAUGA R

D 4 COUNTY RD 4 0 4

REGIONAL RD 9 4 HIGHW

AY 10 2

HIGHWAY 21 2

TREMAINE R D 4 REGIONAL RD 4 4

1COUNTY RD 43 4 COUNTY RD 23 4

COUN TY RD

12 4

8 LINE 4

AMBERLEY RD 4

PERTH LINE 4

KOSSUTH RD 4 NAFZIG

ER RD 4

VICTORIA ST N 2

KING RD 4

COUN TY R

D 32 4 2

WEIMAR LINE 4

WEBER ST E 4 COUNTY RD 31 4

4

1

1

1

1 1

1 1

1 1

1

1

1

1 1 1

1 1

1

1

2

1

1 1

1

1 1

4

B562L

B56 3L

D7V

E511V

E510V

D10H B27S

V586M M585M

S2E

B7

© Copyright Hydro one Inc. All rights reserved. No part of thisdrawing may be redistributed or reproduced in any form by any photographic, electronic, mechanical or any other means, or used in any information storage or retrieval system.

Neither Hydro One Inc. nor any of its subsidiaries assumes liability for any errors or omissions.

Produced by Hydro One Inc. under Licence with the Ontario Ministry of Natural Resources

© Queen’s Printer for Ontario, 2006.

NOT TO BE REPRODUCED OR REDISTRIBUTED CONFIDENTIAL TO HYDRO ONE NETWORKS

0 10 20 40

Kilometers

´

Produced by: Inergi LP

GIS Services Date: November 2006 Map06-183_Ex_B_2_2_v3

Transmission Stations

"

) 115 kV

Transmission Lines 500 kV 230 kV 115 kV

Major Roads

Canadian Forces Base Borden Conservation Area

Provincial Parks Water Body Municipal Boundary Counties

Proposed Route Bruce x Milton â â â â â â

230 kV

"

)

500 kV

"

)

A B C D

E

F

G

G

(6)

CROSS SECTIONS OF THE TOWER TYPES – EXISTING AND PROPOSED

Refer to Exhibit B, Tab 2, Schedule 2 for location of the cross sections of the tower types.

(7)

Filed: March 29, 2007 EB-2007-0050

Exhibit B Tab 2 Schedule 3 Page 2 of 4

(8)
(9)

Filed: March 29, 2007 EB-2007-0050

Exhibit B Tab 2 Schedule 3 Page 4 of 4

(10)

PROPOSED FACILITIES:

1

BRUCE X MILTON SCHEMATIC DIAGRAM

2 3

Hanover TS

Bruce GS

Milton SS

Orangeville TS

B560 V B561M B22

D B 23 D

B4V B5V

B562L B563L

B27S B28S

S1H

D10H

New L ine E8V E9V

D6V D7V

To Longwood TS

To Detweiler TS To Detweiler TS

To Essa TS

To Detweiler TS To Owen Sound TS

To Owen Sound TS

Legend Transmission Lines

Proposed 500 kV Line Existing 500 kV Existing 230 kV Existing 115 kV 4

5

(11)

Filed: March 29, 2007 EB-2007-0050

Exhibit B Tab 2 Schedule 5 Page 1 of 1

PROPOSED FACILITIES:

1

500 kV BRUCE A TS SCHEMATIC DIAGRAM

2

(dotted lines represent the proposed facilities)

3

A Bus

E Bus

G4

BruceB B569B

LX9 G3

Longwood B562L

LX3

Claireville B560V

LX7

T28

T27 T25

G

Legend:

Generator

500 kV Circuit Breaker 500 kV Circuit Termination 500 kV Transformer Termination

Milton LX11

4 5

(12)

PROPOSED FACILITIES:

1

500 kV BRUCE B SS SCHEMATIC DIAGRAM

2

(dotted lines represent the proposed facilities)

3

J Bus P Bus

G8 Bruce A

B569B L05

G7

Longwood B563L

L02

Milton B561M L04

G6 G5

Milton L07

G

Legend:

Generator

500 kV Circuit Breaker 500 kV Circuit Termination

4 5

(13)

Filed: March 29, 2007 EB-2007-0050

Exhibit B Tab 2 Schedule 7 Page 1 of 1

PROPOSED FACILITIES:

1

500 kV MILTON SS SCHEMATIC DIAGRAM

2

(dotted lines represent the proposed facilities)

3

Bruce B SS B561M

Claireville TS M571V

Claireville TS M570V

Trafalgar TS M573T

Middleport TS M585M Bruce

(new)

Trafalgar TS M572T

H Bus K Bus

Bruce (new)

G

Legend:

Generator

500 kV Circuit Breaker 500 kV Circuit Termination

4 5

References

Related documents

We can imagine three possible explanations for this: (1) contamination of the RRab sample close to the plane by some other type of variable star; (2) small number statistics; or (3)

In 2009, the first breeding pair reared successfully three chicks in the Odiel Marshes for the first time in mainland Spain since 1981, when the species become extinct.. The

At each point, we explain how and who is recognized as having passion, essentially who is able to deploy passion as emotional capital, and in which contexts are shaped by and

Presented paper Avid versus struggling readers : co-construed pupil identities in school booktalk at Departaments de lenguas de la facultad de ciencias de la education y el centro

We quantified upper limb motor deficits with a robot-based assessment including behavioral and muscle synergy analysis in 11 multiple sclerosis subjects with mild to moderate

• Aprima Medical Software • Athenahealth • BIizmatics • CareCloud • ChartLogic • CPSI • CSC • CureMD • Dr First • Emdeon • e-MDS

For many years, he was the chairman of the Council of vice-rectors for research of the Ministry of Education and Science of Ukraine, chairman of the Scientific and Expert Council