• No results found

Design of Prediction System for Key Performance Indicators in Balanced Scorecard

N/A
N/A
Protected

Academic year: 2020

Share "Design of Prediction System for Key Performance Indicators in Balanced Scorecard"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

table 1.     Table 1, Fuzzy Set Operations
Fig.4, Corporate Balanced Scorecard
Fig 6: Comparing Average errors in all steps

References

Related documents

“Special hazard” means a hazard that requires special consideration given the occupant awareness, knowledge of building, fire services systems installed physical

of twelve Chinese graduate students at the University of Windsor in Canada and notes: “The characteristics of recent Chinese students are not only different from students from other

Chweidan v Mishcon de Reya Solicitors [2014] n v Mishcon de Reya Solicitors [2014] n v Mishcon de Reya Solicitors [2014] n v Mishcon de Reya Solicitors [2014] EWHC 2685 31 July

Such policies and practices affect the entire educational community, including faculty members, university and faculty administrators, school partners, and pre-service

Rapid Response services are part of the comprehensive workforce services provided through the collaboration of the Workforce Investment Board, the Ventura County Human

Requirements for application Magnetic
 field
(VLF)
 Antenna Laser Scanner (LIDAR) Radar (77Ghz Doppler and mono pulse) Traffic Monitoring Systems - GPS tracking Traffic

[36] L. Social Security with Endogenous Debt Limits. Ability Bias, Discount Rate Bias, and the Return to Education. Human Capital Investment and Default Incentives with

The viewpoints of supply chain managers determine the selection of forecasting information.. Before a forecast is created one must determine how those managers view the