FIVE-YEAR CAPITAL IMPROVEMENT PLAN
FY 2022-2026
(DRAFT)
Amended 6/16/2021
TULSA AIRPORTS IMPROVEMENT TRUST CAPITAL IMPROVEMENT PLAN
PROJECT SUMMARY FISCAL YEAR(S) 2022 - 2026
•All figures indicated in thousands - funding sources defined on last page of this section.
Funding
Project Source FY2022 FY2023 FY2024 FY2025 FY2026 Total
1 Replace Snow Removal Equipment TAIT 89 89
1-Rotary Plow (Blower) PFC 0
FAA(E) 801 801
FAA (D) 0
OKANG 0
Other 0
Total 890 0 0 0 0 890
2 Terminal Escalator Replacement TAIT 0
PFC 800 800
FAA(E) 0
FAA (D) 0
OKANG 0
Other Bond 0
Total 800 0 0 0 0 800
3 Rehabilitate Entrance Roads TAIT 240 2,160 2,400
PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other 0
Total 240 2,160 0 0 0 2,400
4 Remodel Restrooms Lower Level for TAIT 200 200
Concourse A & Concourse B PFC 0
SARA & Family Facilities FAA(E) 0
FAA (D) 0
OKANG 0
Other CFC 0
Total 200 0 0 0 0 200
5 ATCT TAIT 4,000 4,000
PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other 38,000 38,000
Total 4,000 38,000 0 0 0 42,000
6 ATCT Elevator Upgrade TAIT 350 350
PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other 0
Total 350 0 0 0 0 350
Amended 6-16-2021
•All figures indicated in thousands - funding sources defined on last page of this section.
Funding
Project Source FY2022 FY2023 FY2024 FY2025 FY2026 Total
7 Access\ Perimeter Road TAIT 198 198
(Construction Only) PFC 0
FAA(E) 1,782 1,782
FAA (D) 0
OKANG 0
Other 0
Total 1,980 0 0 0 0 1,980
8 Terminal Building Roof TAIT 600 600
(Admin / Mezzanine) PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other 0
Total 600 0 0 0 0 600
9 ARC Flash TAIT 85 85
PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other 0
Total 85 0 0 0 0 85
10 Improve RSA RW 18R-36L TAIT 1,100 1,100
EMAS RW 36 PFC 0
(Design & Construction) FAA(E) 9,900 9,900
FAA (D) 0
OKANG 0
Other 0
Total 0 11,000 0 0 0 11,000
11 Purchase Public Area Furniture TAIT 500 500
PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other 0
Total 0 500 0 0 0 500
12 Safety Management System TAIT 100 100
PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other 0
Total 0 100 0 0 0 100
TULSA AIRPORTS IMPROVEMENT TRUST CAPITAL IMPROVEMENT PLAN
PROJECT SUMMARY FISCAL YEAR(S) 2022 - 2026
Amended 6-16-2021
•All figures indicated in thousands - funding sources defined on last page of this section.
Funding
Project Source FY2022 FY2023 FY2024 FY2025 FY2026 Total
13 Computer Aided Dispatch (CAD) TAIT 100 100
PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other 0
Total 0 100 0 0 0 100
14 Replace ARFF Vehichle TAIT 88 88
PFC 0
FAA(E) 792 792
FAA (D) 0
OKANG 0
Other 0
Total 0 0 880 0 0 880
15 Taxiway K" Pavement TAIT 37 413 450
Reconstruction PFC 0
FAA(E) 333 3,670 4,003
FAA (D) 47 47
OKANG 0
Other 0
Total 0 0 370 4,130 0 4,500
16 Airfield Guidance Sign TAIT 40 410 450
Upgrade PFC 0
FAA(E) 360 3,690 4,050
FAA (D) 0
OKANG 0
Other 0
Total 0 0 400 4,100 0 4,500
17 AC Pavement Reseal TAIT 150 150
Employee Lots PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other 0
Total 0 0 150 0 0 150
18 Replace PC Air, TAIT 220 220
2 - Units B1, B10 PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other 0
Total 0 0 220 0 0 220
TULSA AIRPORTS IMPROVEMENT TRUST CAPITAL IMPROVEMENT PLAN
PROJECT SUMMARY FISCAL YEAR(S) 2022 - 2026
Amended 6-16-2021
•All figures indicated in thousands - funding sources defined on last page of this section.
Funding
Project Source FY2022 FY2023 FY2024 FY2025 FY2026 Total
19 Update Airfield Pavement TAIT 100 100 200
Management System (PCI) PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other 0
Total 0 0 100 0 100 200
20 TW "M" Pavement TAIT 80 890 970
Rehabilitation PFC 0
FAA(E) 720 4,422 5,142
FAA (D) 3,588 3,588
OKANG 0
Other 0
Total 0 0 0 800 8,900 9,700
21 Repair QTA Parking Lot TAIT 850
PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other - CFC 850 0
Total 0 0 0 850 0 850
22 Replace Revolving Doors in TAIT 1,600 1,600
Ticketing Area with Vestibules PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other 0
Total 0 0 0 1,600 0 1,600
23 General Aviation Inspection TAIT 5,000 5,000
Facility PFC 0
(Construction) FAA(E) 0
FAA (D) 0
OKANG 0
Other 0
Total 0 0 0 0 5,000 5,000
24 Replace Window Shades in TAIT 250 250
Ticketing Area PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other 0
Total 0 0 0 0 250 250
TULSA AIRPORTS IMPROVEMENT TRUST CAPITAL IMPROVEMENT PLAN
PROJECT SUMMARY FISCAL YEAR(S) 2022 - 2026
Amended 6-16-2021
•All figures indicated in thousands - funding sources defined on last page of this section.
Funding
Project Source FY2022 FY2023 FY2024 FY2025 FY2026 Total
25 Replace PC Air TAIT 120 120
1 - Unit B4 PFC 0
FAA(E) 0
FAA (D) 0
OKANG 0
Other 0
Total 0 0 0 0 120 120
TOTAL CIP 9,145 51,860 2,120 11,480 14,370 88,975
FUNDING SOURCE TAIT 5,762 3,960 635 2,503 6,360 19,220
PFC 800 0 0 0 0 800
FAA(E) 2,583 9,900 1,485 8,080 4,422 26,470
FAA (D) 0 0 0 47 3,588 3,635
OKANG 0 0 0 0 0 0
Other 0 38,000 0 850 0 38,850
Total 9,145 51,860 2,120 11,480 14,370 88,975
TULSA AIRPORTS IMPROVEMENT TRUST CAPITAL IMPROVEMENT PLAN
PROJECT SUMMARY FISCAL YEAR(S) 2022 - 2026
Amended 6-16-2021
FUNDING SOURCES DEFINED:
TAIT - TULSA AIRPORTS IMPROVEMENT TRUST PFC – PASSENGER FACILITY CHARGE FAA (E) - GRANT-IN-AID - Entitlement Funds.
FAA (D) - GRANT-IN-AID - Discretionary Funds OKANG - Air National Guard Funding Participation OTHER - Revenue or Special Facility Bonds
1. Replace Snow Removal Equipment
Total Project Cost LOCATION MAP:
*Total Project Cost = $890
FAA (E) DESCRIPTION:
Replace an older and much slower snow blower with newer and more efficient model.
JUSTIFICATION:
The existing equipment is extremely slow and needs to be replace to decrease the amount of time needed to clear the main runway which intern will increase safety for airport staff, aircraft and traveling public, while reducing inconvenience to the passengers.
TAIT
Amended 6-16-2021 * FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS
DETAIL
TAIT 89 89
PFC -
FAA (E) 801 801
FAA (D) -
OKANG -
OTHER -
TOTAL 890 - - - - 890
2. Terminal Escalator Replacement
LOCATION MAP:
*Total Project Cost = $800
Total Project Cost
•All figures indicated in thousands.
TAIT -
PFC 800 800
FAA (E) -
FAA (D) -
OKANG -
OTHER 2018 Bond -
TOTAL 800 - - - - 800 DESCRIPTION:
Replace existing escalators in the terminal building.
JUSTIFICATION:
The existing escalators have outlived their installation lifecycle and serviceability.
Equipment repairs have increased and reliability has decreased to a point where the units need to be replaced.
PFC
Amended 6-16-2021
3. Rehabilitate Entrance Road
LOCATION MAP:
*Total Project Cost = 2,400
* All figures indicated in thousands
Total Project Cost DESCRIPTION:
Rehabilitate entrance road surfaces as required.
JUSTIFICATION:
This work is necessary to provide safe, reliable access for airport customers, staff and tenants to access the Terminal building. Age and environmental related deterioration are creating maintenance issues in a variety of locations, that exceed the ability of in-house maintenance staff.
TAIT
Amended 6-16-2021 * FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS
DETAIL
TAIT 240 2,160 2,400
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER -
TOTAL 240 2,160 - - - 2,400
4. Remodel Restrooms
LOCATION MAP:
*Total Project Cost = $200
Total Project Cost
•All figures indicated in thousands.
* FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS DETAIL
TAIT 200 200
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER 2018 Bond -
TOTAL 200 - - - - 200 DESCRIPTION:
Remodel restrooms in the lower level concourse areas to accommodate Service Animal Relief Areas (SARA) and
expanded Family facilities.
JUSTIFICATION:
To help accommodate the traveling public, TAIT will modify the existing restrooms on the lower level of both concourses by converting into a SARA and Family restroom with an adult changing table in order to provide wheelchair accessible service animal relief areas and assisted- use toilet facilities for passengers departing, connecting, or arriving at the airport.
TAIT
Amended 6-16-2021
5. Air Traffic Control Tower (ATCT)
LOCATION MAP:
*Total Project Cost = $42,000
* All figures indicated in thousands
Total Project Cost DESCRIPTION:
Construct a new Air Traffic Control Tower as coordinated with the FAA.
JUSTIFICATION:
The existing Air Traffic Control Tower was constructed in 1961 and has out lived its maintenance management lifecycle.
Changes to the airports property
development and aircraft operations area requires construction of a new facility to ensure safe operations, proper line of sight for Tower personnel and efficiency of the airport.
TAIT * FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS
DETAIL
TAIT 4,000 4,000
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER 38,000 38,000
TOTAL 4,000 38,000 - - - 42,000
Amended 6-16-2021 OTHER
6. ATCT Elevator Upgrade
LOCATION MAP:
*Total Project Cost = $350
* All figures indicated in thousands
Total Project Cost
TAIT * FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS
DETAIL
TAIT 350 350
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER -
TOTAL 350 - - - - 350
Amended 6-16-2021 DESCRIPTION:
Bring the Air Traffic Control Tower elevator up to existing code.
JUSTIFICATION:
The existing elevator does not meet current building codes, or ADA compliance regulations. This project will bring the elevator in compliance with all existing codes and regulations. This measure is required in order for the tower to maintain operations while the new Air Traffic Control Tower is being constructed.
7. Access \ Perimeter Road Rehabilitation
LOCATION MAP:
*Total Project Cost = 1,980
* All figures indicated in thousands
Total Project Cost DESCRIPTION:
Rehabilitate perimeter roadway surfaces as required.
JUSTIFICATION:
This work is necessary to provide safe, reliable access for airport staff and tenants around the active airfield. Age and stress related deterioration are creating
maintenance issues in a variety of
locations that are growing beyond in-house maintenance staff’s ability.
PCI Rating Roadways = 25-42– Serious\ Poor
* FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS DETAIL
TAIT 198 198
PFC -
FAA (E) 1,782 1,782
FAA (D) -
OKANG -
OTHER -
TOTAL 1,980 - - - - 1,980
TAIT FAA (E)
Approved 12-05-19
8. Terminal Building Roof Replacement
LOCATION MAP:
*Total Project Cost = $600
Total Project Cost
•All figures indicated in thousands.
* FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS DETAIL
TAIT 600 600
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER 2018 Bond -
TOTAL 600 - - - - 600 DESCRIPTION:
Replace the roofing material on the terminal building, above the administrative office areas and mezzanine.
JUSTIFICATION:
The section of roof above the administrative office areas and mezzanines was last replaced in 2005. The roofing material has developed leaks and water has saturated the insolation.
TAIT
Amended 6-16-2021
9. ARC Flash
LOCATION MAP:
*Total Project Cost = $85
Total Project Cost
•All figures indicated in thousands.
* FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS DETAIL
TAIT 85 85
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER 2018 Bond -
TOTAL 85 - - - - 85 DESCRIPTION:
An electrical study to identify the potential for electrical arcing.
JUSTIFICATION:
Current code requires all electrical panels to be labeled for potential arc flash and identify the proper Personal Protection Equipment needing to be worn for safety.
TAIT
Amended 6-16-2021
10. Improve RSA Runway 18R/36L EMAS RW 36L
PCI Rating Runway = 46 – Poor
*Total Project Cost = $11,000
LOCATION MAP:
•All figures indicated in thousands.
DESCRIPTION:
This project will modify Runway 18R/36L to provide runway safety areas that comply with FAA
standards to the maximum extent practical.
A combination of runway relocation and Engineered Material Arresting System (EMAS) at the south end of Runway 18R/36L will be combined to meet the objective and maintain the existing runway length.
JUSTIFICATION:
The FAA has required all runways to comply with the minimum standards for runway safety areas.
To preserve as much runway length as possible, the last phase of meeting the standard will require the installation of an Engineered Material Arresting Systems (EMAS) at the south end of Runway 18R\36L.
Total Project Cost
* FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS DETAIL
TAIT 1,100 1,100
PFC -
FAA (E) 9,900 9,900
FAA (D) -
OKANG -
OTHER -
TOTAL - 11,000 - - - 11,000
Amended 6-16-2021 FAA (E) TAIT
11. Terminal Building Public Area Furniture Replacement
LOCATION MAP:
*Total Project Cost = $500
Total Project Cost
•All figures indicated in thousands.
* FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS DETAIL
TAIT 500 500
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER 2018 Bond -
TOTAL - 500 - - - 500 DESCRIPTION:
Replace public furniture in the terminal building.
JUSTIFICATION:
The existing furniture has outlived its installation lifecycle and serviceability.
Furniture repairs have increased to a point where the units need to be replaced.
TAIT
Amended 6-16-2021
12. Safety Management System
LOCATION MAP:
*Total Project Cost = $100
Total Project Cost
* FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS DETAIL
TAIT 100 100
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER -
TOTAL - 100 - - - 100
* All figures indicated in thousands Amended 6-16-2021
DESCRIPTION:
Purchase and implement a Safety Management System software and program.
JUSTIFICATION:
The FAA requires a Safety Management System to assure the safe operation of aircraft through effective management of safety risks designed to continuously improve safety by identifying hazards, collecting and analyzing data and continuously assessing safety risks.
TAIT
13. Computer Aided Dispatch
LOCATION MAP:
*Total Project Cost = $100
Total Project Cost
* FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS DETAIL
TAIT 100 100
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER -
TOTAL - 100 - - - 100
* All figures indicated in thousands Amended 6-16-2021
DESCRIPTION:
Upgrade the computer system in Airport Dispatch
.
JUSTIFICATION:
In 2010 we completely revamped the Airports police Dispatch center. At the time the upgrade replaced computer and increased the quantity of monitors and upgraded the software. The age of the system is warranting this upgrade.
TAIT
14. Replace ARFF Vehicle
Total Project Cost LOCATION MAP:
*Total Project Cost = $880
FAA (E) DESCRIPTION:
Replace 1500 gallon Aircraft Rescue and Fire Fighting (ARFF) vehicle.
JUSTIFICATION:
This item will replace a 2006 ARFF unit that reached its projected useful life as a front-line response vehicle in 2021
TAIT * FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS
DETAIL
TAIT 88 88
PFC -
FAA (E) 792 792
FAA (D) -
OKANG -
OTHER -
TOTAL - - 880 - - 880
* All figures indicated in thousands Amended 6-16-2021
15. Reconstruct Taxiway “K”
LOCATION MAP:
*Total Project Cost = $4,500
Total Project Cost FAA (E) TAIT
* FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS DETAIL
TAIT 37 413 450
PFC -
FAA (E) 333 3,670 4,003
FAA (D) 47 47
OKANG -
OTHER -
TOTAL - - 370 4,130 - 4,500
* All figures indicated in thousands Amended 6-16-2021
FAA (D) DESCRIPTION:
This project will reconstruct and realign a portion of taxiway K.
Design would include vertical and horizontal geometry, pavement design, electrical upgrade, pavement marking and misc. drainage.
JUSTIFICATION:
The area of K, east and west of R\W 18R currently has a PCI between 28 and 48.
This taxiway currently has non-standard issues as it does not intersect the R\W at a 90 degree angle.
In addition to the non-standard crossing of the R\W, west of the R\W, K contributes to a very confusing intersection of T\W M, K, YY and WW.
16. Upgrade Airfield Guidance Signs
LOCATION MAP:
*Total Project Cost = $4,500
* All figures indicated in thousands
Total Project Cost DESCRIPTION:
Upgrade outdated airfield guidance signs, PAPI’s, REIL’s and Wind Cones that are and no-longer in compliance with FAA Advisory Circulars and upgrade electrical conductors.
JUSTIFICATION:
FAA requires new installation of electrical conductors be tested for insolation and must meet the minimum standard. When those tests reveal a reading of 1 mega ohm on older cable, the FAA recommends the conductors be replaced. Currently, conductors on the west side of the airport reveal readings between .87 mega ohms to .239 mega ohms.
The airport has replaced many of the airfield signage with newer style signs.
Some are still old style. This project will replace the remaining old signs as well as PAPI’s and REIL’s on R\W 8-26.
TAIT (GEN)
Amended 6-16-2021 FAA (E) FAA (E) * FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS
DETAIL
TAIT 40 410 450
PFC -
FAA (E) 360 3,690 4,050
FAA (D) -
OKANG -
OTHER -
TOTAL - - 400 4,100 - 4,500
17. Pavement Reseal Employee Parking Areas
LOCATION MAP:
*Total Project Cost = $150
Total Project Cost DESCRIPTION:
This project will seal cracks, spalls and holes in the existing employee parking lots “A” and “B” .
JUSTIFICATION:
The pavement in the various parking areas are experiencing distress such as cracking, spalling and pot holes. Aging and weathered asphalt begins to crack and ravel.
Resealing is needed for routine maintenance to repair and protect the pavement before rehabilitation is required. If the pavement is not maintained, its useful lifespan is severely reduced.
•All figures indicated in thousands.
TAIT * FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS
DETAIL
TAIT 150 150
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER -
TOTAL - - 150 - - 150
Amended 6-16-2021
18. Replace PC Air Units B1 & B10
LOCATION MAP:
*Total Project Cost = $220
Total Project Cost
•All figures indicated in thousands.
* FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS DETAIL
TAIT 220 220
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER 2018 Bond -
TOTAL - - 220 - - 220 DESCRIPTION:
Replace existing outdated PC Air units B1 and B10 in the terminal building.
JUSTIFICATION:
The existing PC Air Units, installed in 2011, have outlived their installation lifecycle and serviceability.
Equipment repairs have increased and reliability has decreased to a point where the units need to be replaced.
TAIT
Amended 6-16-2021
19. Update Airfield Pavement Management System
DESCRIPTION:
This project will provide an update to the Airports Pavement Condition evaluation.
JUSTIFICATION:
The latest comprehensive pavement evaluation update was performed in 2018 and in accordance with FAA guidance shall be updated every three years to ensure accurate data for predicting pavement conditions and to comply with FAA regulations.
*Total Project Cost = $200
LOCATION MAP:
Total Project Cost
•All figures indicated in thousands.
TAIT
Amended 6-16-2021 * FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS
DETAIL
TAIT 100 100 200
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER -
TOTAL - - 100 - 100 200
20. Rehabilitate Taxiway “M”
LOCATION MAP:
*Total Project Cost = $9,700
* All figures indicated in thousands
Total Project Cost DESCRIPTION:
This project will rehabilitate taxiway “M”.
Pavement expected to see rehabilitation:
T\W M and connecting T\W’ connecting to R\W 18R and T\L within the safety area of T\W M. Design would include vertical and horizontal geometry, pavement design, electrical upgrade, pavement marking and misc. drainage.
JUSTIFICATION:
The last major work performed on T\W M was an AC overlay in 1991. Since then the airport staff has been maintaining the pavement in the form of crack sealing and the application of seal coat.
The current PCI of this pavement is below 40. The objective is to add life to the pavement so it will continue to perform as needed.
TAIT FAA (E)
* FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS DETAIL
TAIT 80 890 970
PFC -
FAA (E) 720 4,422 5,142
FAA (D) 3,588 3,588
OKANG -
OTHER -
TOTAL - - - 800 8,900 9,700
Amended 6-16-2021 FAA (D)
21. Repair QTA Parking Lot
LOCATION MAP:
*Total Project Cost = 850
* All figures indicated in thousands
Total Project Cost CFC
Amended 6-16-2021 * FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS
DETAIL
TAIT -
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER CFC 850 850
TOTAL - - - - - - DESCRIPTION:
This project will seal cracks, spalls and holes in the existing rental car Quick-Turn-Around parking lot.
JUSTIFICATION:
The pavement in QTA is experiencing distress such as cracking, spalling and pot holes. Aging and weathered asphalt begins to crack and ravel.
Resealing is needed for routine maintenance to repair and protect the pavement before rehabilitation is required. If the pavement is not maintained, its useful lifespan is severely reduced.
22. Replace Revolving Doors in Ticketing Area With Vestibules
LOCATION MAP:
*Total Project Cost = $1,600
Total Project Cost
•All figures indicated in thousands.
* FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS DETAIL
TAIT 1,600 1,600
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER -
TOTAL - - - 1,600 - 1,600 DESCRIPTION:
Replace existing revolving doors in the ticketing area with vestibules.
JUSTIFICATION:
The existing revolving doors have outlived their installation lifecycle and serviceability.
Equipment repairs have increased and reliability has decreased to a point where the units need to be replaced.
The new vestibules will provide a more efficient method to enter and exit the building.
TAIT
Amended 6-16-2021
23. General Aviation Inspection Facility
LOCATION MAP:
*Total Project Cost = 5,000
* All figures indicated in thousands
Total Project Cost DESCRIPTION:
Construct a General Aviation Inspection Facility
JUSTIFICATION:
In the effort to meet new Federal guidelines for US Customs inspections, the airport will demolish old structures and replace with a new US Customs and Border Protection facility.
TAIT
Amended 6-16-2021 * FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS
DETAIL
TAIT 5,000 5,000
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER -
TOTAL - - - - 5,000 5,000
24. Replace Window Shades in Ticketing Area
LOCATION MAP:
*Total Project Cost = $250
Total Project Cost
•All figures indicated in thousands.
* FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS DETAIL
TAIT 250 250
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER 2018 Bond -
TOTAL - - - - 250 250 DESCRIPTION:
Replace existing ineffective window shades in the ticketing area with new shades.
JUSTIFICATION:
The existing window shades have outlived their installation lifecycle and serviceability.
Equipment repairs have increased and reliability has decreased to a point where the shades need to be replaced.
TAIT
Amended 6-16-2021
25. Replace PC Air Unit B4
LOCATION MAP:
*Total Project Cost = $120
Total Project Cost
•All figures indicated in thousands.
* FUNDING / EXPENSE FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 TOTALS DETAIL
TAIT 120 120
PFC -
FAA (E) -
FAA (D) -
OKANG -
OTHER 2018 Bond -
TOTAL - - - - 120 120 DESCRIPTION:
Replace an existing outdated PC Air B4 unit in the terminal building.
JUSTIFICATION:
The existing Air Unit, installed in 2011, has outlived its installation lifecycle and serviceability.
Equipment repairs have increased and reliability has decreased to a point where the unit needs to be replaced.
TAIT
Amended 6-16-2021