• No results found

Prediction of Construction Project Performance using Regression Analysis and Artificial Neural Network

N/A
N/A
Protected

Academic year: 2020

Share "Prediction of Construction Project Performance using Regression Analysis and Artificial Neural Network"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 2 Input factors for schedule performance model
Table 5. Performance Variables
Table 6.Comparison of cost performance models
Table 9 Comparison of satisfaction level models
+2

References

Related documents

In such a highly competitive environment nowadays, it is necessary for every construction company to maintain an efficient and effective material procurement to cut

o For better performance and HEM removal efficiency, this reactor should be operated with the fluid flowing at a velocity higher than 0.032 m s -1 and following a horizontal

During the course of this research, a number of milestones have been achieved. First of all, for both unidirectional regular or irregular waves, a solid, flexible, transparent

In some instances, this flexibility has enabled plans to partner with community-based organizations to deliver group education, engage non- traditional providers such as life

Using data from the CBI Industrial Trends Survey over an eleven year period, Bank of England researchers showed that those firms reporting financial constraints had

According to these principles an optimal system for mobilising the psychological resources of our client should include: (1) an immediate response by having the first meeting within

Part II of the study is identical to Part I, except for exactly one difference: in Part II subjects do not trade an object of induced value (a card worth 8.50

Net cash reserves - defined as the excess of cash and short-term marketable securities over interest-bearing debt – increased by NT$25.78 billion to NT$213.79 billion at the end