Alexandre Heringer Lisboa
November/2015
Generation capacity: 7.038MW
7% do mercado
Predominantly hydropower Growth in renewable energy Natural gas as an alternative
Unregulated market
25%
Retail
Greater
distributor
Distribution
510.744 Km
12% of the market Heavily regulated segment
Transmission*
10.060 Km
3% of the market
Mesh with national reach
*includes indirect interest in the assets the newly acquired Abengoa
Cemig – Significant presence in the energy scenario of Brazil.
More than 200 companies and consortium;
Leading Companies :
Cemig Geração e Transmissão;
Cemig Distribuição;
Efficientia;
Gasmig;
Light;
Renova Energia;
Taesa;
Axxiom;
Cemig Telecom;
Ativas.
Estates and Chile Presence in PB AM AC RO PA MA RR AP PI CE RN PE AL SE BA TO MT GO MS SP PR SC RS ES RJ MG DF ChileFree Clients of Cemig Power purchase Wind generation Gas Distribuition Generation
Generation (in construction) Transmission
Transmission (in construction) Distribuition
Minas Gerais in the brazilian energy context
Oferta BR 2013 Oferta MG 2013 116499 13151 16479 4150 37792 1367 83365 13779 5026 0 37054 5338 296215 37785 TOE Thousands Coke Natural gas Biomass Nuclear Hidroelectricity Source:1) Balanço Energético Nacional - 2014 (ano base 2013)
2) Balanço Energético do Estado de Minas Gerais - 2014 (ano base 2013) 3) http://www.iea.org (Key World Energy Statistics 2014)
2024 Brazil Decennial Electric Energy Plan:
.
Exists the forecast that PV, installed only in residences and commerce, will reach 1.6 TWh in 2024.This represents 1.6% of the total distributed generation or 0.2% of the total electricity to be supplied in 2024.
.
The amount of the distributed generation of 100 TWh, forecasted to 2024, is equivalent to the record the generation of Itaipú Power Plant (the second largest plant of the world): 98,6 TWh.
source: Brazilian Ministry of Mines and Energy (MME)
1,6 TWh DG = 1,15 GWp (1 KWp = 1,4 MWh/year
Distributed Generation I
Potencial Market
DG is one of more efficient alternatives and focus of the brazilian government initiatives to expansion of energetic supply.
Forecasts that the expansion of electric energy generation by the DG on several sources will be on average 7% by year until 2024
OUR BUSINESS
• Provider of solutions and engineering services in energy efficiency
• Founded in 2002
• 100% Cemig owned
• Certificated in Quality Management System (ISO 9001)
Cogeneration
Distributed Generation
Finals as lighting uses
Air conditioning, refrigeration, etc.
Connection
Industrial
Trade and Services
Public Sector
Partnerships with other
utilities
Consulting and Training
Utilities centers
PERFORMANCE CONTRACT
Previous Costs
With
Energy Costs after project Implementation Costs after Implementation of the project Efficientia
$
$
After project During project Before projectCustomer’s Benefit
A Cemig Company• First uses in the 80’s;
• Intensified in the 90’s:
•
Assistance program for rural development in Brazil;
•
Rational Use of Energy in Agriculture (CEMIG/GTZ);
•
Energy Development Program of States and Municipalities
-“PRODEEM”;
•
“LUZ SOLAR” Program - Rural Pre-electrification using
Photovoltaic Systems (Phase 1: 550 rural households and 200
schools in partnership with MME;
• Continuity in the 2000’s:
•
“LUZ PARA TODOS” Program - P
V systems were installed in 1700
homes and 300 rural schools located in the northern and eastern
regions of the state of Minas Gerais;
• Termosolar Plant
•
Thermosolar plant deployment (~ 10kW) within
project R&D 190 ANEEL- 2008;
• Productive chain:
•
Research project (R&D 127 ANEEL) to silicon
purification laboratory scale;
• Systems connected to the Grid
•
Implementation of 4 small systems (~ 3 kWp
each) within project R&D 12 ANEEL- 2005;
•
Implementation of 1 small system (~ 10 kWp);
•
Implementation of 2 small systems (~ 5 kWp
each) within project cities of future - 2012
Historical CEMIG
Systems connected to the Grid
•
USF Mineirão (1,42 MWp) – CEMIG/KfW – 2013
(one of the biggest PV
on Soccer Stadium in the World)
•
New headquarters of Cemig (30 kWp) – 2014;
•
Biggest Data Center in Latin America (300 kWp) – CEMIG/Algar
-2015;
MG: PV potential (DG-distributed generation)
DG (RN Aneel 482/12)
Brazilian market until
October/2015
Number of connections per source
MG: Wind potential
Studies show that the wind potential in the state reaches 40
gigawatts (GW) at a height of 100 meters above the ground,
capacity 2.7 times higher than that of Itaipu.
PV prospecting projects
Partner
PV
Local
Power
BHTec USF BHTec Belo Horizonte - MG 120 kWp
Prominas USF Expominas Belo Horizonte - MG 300 kWp
Algar Telecom Several sites Several municipalities in MG 450 kWp
Alsol Vilage I Uberlândia - MG 321,44 kWp
Armazens Gerais do Leste de Minas USF AGLM Varginha - MG 300 kWp
Inhotim USF Inhotim Ibirité - MG 3000 kWp
Grupo Pão de Acúcar Several sites Several municipalities in Brazil To be estimated
Os independentes USF Barretos Barretos - SP 400 kWp
Nextel Several sites Several municipalities in MG To be estimated
FUNDEP/UFMG Risoleta Neves Hospital Belo Horizonte - MG 100 kWp
PV projects implemented
Partner
PV
Local
Power
Algar Telecom
USF AlgarTech
Uberlândia - MG
300 kWp
Tecidos Miramontes
USF Miramontes
Uberlândia - MG
60 kWp
Cemig GT
USF Mineirão
Belo Horizonte - MG
1420 kWp
Cemig (P&D Aneel)
USF Univercemig
Sete Lagoas - MG
15 kWp
CEFET-MG (P&D Aneel)
USF CEFET-MG
Belo Horizonte - MG
3 kWp
Puc-MG (P&D Aneel)
USF Green/PUC-MG
Belo Horizonte - MG
3 kWp
Cemig (P&D Aneel)