The Unparalleled Opportunity of Colluli

the Colluli Potash Project presented by Danakali

ASX:DNK

James Durrant Colluli Project Manager September 2015 Formerly South Boulder Mines

(2)

The growing world needs our Potassium Sulphate

3.69 7.32 9.55 0 1 2 3 4 5 6 7 8 9 10 1970 2015 2050

Source: United Nations, Basic Materials Observer, 2014 Global Population (1970, 2015, 2050)

Billions

(3)

Potassium Sulphate - A premium potash product

Potassium Sulphate: K

2

SO

4

Chlorine free (unlike MOP)

Macro and micro nutrients

Water retention

Assists in uptake of additional

nutrients

(4)

0 200 400 600 800 1000 1200 20 06 Q 4 20 07 Q 4 20 08 Q 4 20 09 Q 4 20 10 Q 4 20 11 Q 4 20 12 Q 4 20 13 Q 4 20 14 Q 4 $US /t on n e

MOP FOB Vancouver SOP FOB Utah

SOP has fundamentally sound price dynamics

Source: CRU, Infomine, Greenmarkets MOP and SOP Price vs time

US$ per tonne

(5)

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 In d icated Pr ob ab le Pr ove d M e asu re d

Colluli Mineral Resource and Ore Reserve estimate

Billion tonnes

Mineral Resource Ore Reserve

Resource (Measured and Indicated)

1.3 Billion Tonnes

Reserve (Proved and Probable)

1.1 Billion Tonnes

SOP contained1

205 Million Tonnes

Colluli’s resource is enormous and perfect for SOP

1. Equivalent K2SO4 (SOP) calculated by multiplying %K2O by 1.85

(6)

Colluli is in the best position; locally and globally

0.37 1.17 2.39 0 0.5 1 1.5 2 2.5 3 0.56 1.28 1.62 0 0.5 1 1.5 2 2.5 3 0.76 1.70 2.16 0 0.5 1 1.5 2 2.5 3 Africa India South East Asia Colluli, Eritrea 16 – 150m Danakil, Ethiopia 150-950m Saskat-chewan, Canada 1-3km1 Urals, Russia 0.6-2km

1. Saskatchewan Mining Association

Global Population (1970, 2015, 2050) Billions R e so u rce De p th

Source: United Nations, Basic Materials Observer, 2014 -0 -1000 -2000 -500 -1500 -3000 -2500

(7)

Danakali are leading the development of this project

Paul Donaldson

CEO and Managing Director

25 years senior leadership within BHP Billiton covering: Mining Operations Port Operations Technical Marketing Business Improvement Technical Development Steel Making James Durrant

Colluli Project Manager

7 Years senior technical and operational leadership in BHP Billiton covering: Operational management of large scale open cut mines

Project management, Organisational design Operation development

Mechanical and mining engineering

Stuart Tarrant Head Of Finance

15 years in the accounting profession most recently in leadership positions within BHP Billiton.

Experience in managing finance in companies experiencing accelerated growth or change

Gordon Tainton

Head Of Market Development

24 years in senior executive and leadership positions:

Project development, operational re-structuring, board level company management, acquisitions, marketing, supply chain operations, forecasting future supply/demand and price trends. B2B product sales.

(8)

Assisted by our Joint Venture

50%

50%

(9)

In a stable country with a growing mining industry

0 1 2 3 4 5 6 7 8 9 10 2009 2010 2011 2012 2013 2014

Gross domestic Product

% year on year change

Sub-Sahara Africa Eritrea

Bisha

commissioned in 2010; undergoing 3rd expansion

Zara

commissioning

Asmara

awaiting mining approval

Source: Economic Intelligence Unit; Economist

6% CAGR

(10)

Colluli has the clear advantage

0 500 1000 1500 2000 2500 C ollu li An file C ollu li M assaw a Sala r d e At ac ama Lak e D isap p o in tmen t Et h iopian Pr o je ct s Se rvie r Lak e C arlsb ad Ut ah Lop N u r

Established or developing SOP projects

Colluli

Distance to coast for selected SOP projects

km

Source: Company announcements; Allana Potash, Circum, Danakali analysis

(11)

Colluli is “Positively Unique”

Unmatched

proximity to the coast

Highest purity product; already

produced and available

Large resource; shallow; in solid

form; long life; expandable and

diversifiable

Close proximity to key growth

markets

Strong government support; stable and

growing mining industry

Commodity of the future: excellent fundamentals

Lowest expected capital intensity and

operating costs

(12)

Mining is simple, proven and low risk

Salt Lake Surface Mining, Turkey Wirtgen Surface Miner Cutting Salt

Salt Mining, Western Australia Open Pit Salt Mining, Salar Grande

Salt extraction using surface miners Salt mining, Botash, Botswana

(13)

Processing is simple and well understood

This is the lowest energy input, highest potassium yield route to

Potassium Sulphate

(14)

SOP has been produced and is the highest of purity

49.5 50.0 50.5 51.0 51.5 52.0 52.5 53.0 53.5

The SOP Quality Spectrum

%K2O versus SOP product

Colluli Pilot Plant 52.9% K2O (98% pure) Industry Average

51% K2O (94% pure)

Source: Company websites, Danakali Colluli salt pilot plant tests

(15)

Colluli’s highly attractive position is demonstrated

and comparable

0 200 400 600 800 1000 1200 1400 1600 1800 C ollu li Phase II C ollu li Phase I Ya ra EP M M in in g IC Po tash Po tash Ridge

Capital intensity of advanced SOP projects

US$ per tonne

1. CRU Research, EPM Mining presentation 2014, Company websites, Integer Research, Other sources: Danakali analysis, Danakali pre-feasibility Study

Mine gate expected operating costs for SOP production

US$ per tonne1

Sustainable production volumes

Modular, phased, approach

Demonstrated by PFS

Validated by industry leading consultants and potash experts

(16)

“Positively Unique”

(17)

Forward Looking Statements and Disclaimer

The information in this presentation is published to inform you about Danakali Limited (the “Company” or “DNK”) and its activities. DNK has endeavoured to ensure that the information in this presentation is accurate at the time of release, and that it accurately reflects theCompany’s intentions. All statements in this presentation, other than statements of historical facts, that address future production, project development, reserve or resource potential, exploration drilling, exploitation activities, corporate transactions and events or developments that the ‘Company expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in forward-looking statements.

Factors that could cause actual results to differ materially from those in forward-looking statements include market prices of potash and, exploitation and exploration successes, capital and operating costs, changes in project parameters as plans continue to be evaluated, continued availability of capital and financing and general economic, market or business conditions, as well as those factors disclosed in the Company's filed documents.

There can be no assurance that the development of the Colluli Project will proceed as planned. Accordingly, readers should not place undue reliance on forward looking information. Mineral Resources and Ore Reserves have been estimated using the Australian JORC (2012) Code (‘JORC 2012’). To the extent permitted by law, the Company accepts no responsibility or liability for any losses or damages of any kind arising out of the use of any information contained in this presentation. Recipients should make their own enquiries in relation to any investment decisions.

Material resource and financial assumptions made in this presentation are consistent with assumptions detailed in theCompany’s ASX announcements dated 25 February 2015, 4 March 2015 and 19 May 2015 which continue to apply and have not materially changed. The Company is not aware of any new information or data that materially affects assumptions made.

(18)

Competent Persons Reports & Responsibility Statements

Resource Statement

Colluli has a JORC 2012 compliant Measured, Indicated and Inferred Mineral Resource estimate of 1,289Mt @11% K20. The resource contains 303Mt @ 10.98% K20 of Measured Resources, 951Mt @ 10.89% K20 of Indicated Resources and 35Mt @ 10.28% K20 of Inferred Resources.

The information in this report relating to the Colluli Mineral Resource was compiled by Mr. John Tyrell, under the supervision of Mr. Stephen Halabura M. Sc. P. Geo. Fellow of Engineers Canada (Hon), Fellow of Geoscientists Canada, and as a geologist with over 25 years experience in the potash mining industry.

Mr. Tyrell is a member of the Australian Institute of Mining and Metallurgy and a full time employee of AMC. Mr. Tyrell has more than 25 years experience in the field of Mineral Resource estimation.

Mr. Halabura is a member of the Association of Professional Engineers and Geoscientists of Saskatchewan, a Recognised Professional Organisation (RPO) under the JORC Code and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code).

Mr. Tyrell & Mr. Halabura consent to the inclusion of information relating to the Resource Statement in the form and context in which it appears.

Reserve Statement

The JORC 2012 compliant Ore Reserve estimate for Colluli is 1,107 Mt @10% K20 comprising 287Mt Proved and 820Mt Probable Ore Reserve.

Mark Chesher is the Competent Person for the 2015 Colluli Ore Reserve estimate, and supervised preparation of the Ore Reserve estimate with assistance from specialists in each area of the study. Mr. Chesher is a Fellow of the Australasian Institute of Mining and Metallurgy, a Chartered Professional, and is a full-time employee of AMC Consultants Pty Ltd.

He has sufficient open pit mining activity experience relevant to the style of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the JORC Code 2012. Mr Chesher consents to the inclusion of information relating to the Ore Reserve in the form and context in which it appears.

In undertaking the assignments referred to in this report, AMC Consultants Pty Ltd acted as an independent party, has no interest in the outcome of the Colluli Project and has no business relationship with Danakali Ltd other than undertaking those individual technical consulting assignments as engaged, and being paid according to standard per diem rates with reimbursement for out-of-pocket expenses. Therefore, AMC Consultants Pty Ltd and the Competent Person believe that there is no conflict of interest in undertaking the assignments which are the subject of this statement.

References

Related documents

National Conference on Technical Vocational Education, Training and Skills Development: A Roadmap for Empowerment (Dec. 2008): Ministry of Human Resource Development, Department

The objective of this study was to develop Fourier transform infrared (FTIR) spectroscopy in combination with multivariate calibration of partial least square (PLS) and

The ethno botanical efficacy of various parts like leaf, fruit, stem, flower and root of ethanol and ethyl acetate extracts against various clinically

Marie Laure Suites (Self Catering) Self Catering 14 Mr. Richard Naya Mahe Belombre 2516591 [email protected] 61 Metcalfe Villas Self Catering 6 Ms Loulou Metcalfe

The corona radiata consists of one or more layers of follicular cells that surround the zona pellucida, the polar body, and the secondary oocyte.. The corona radiata is dispersed

proyecto avalaría tanto la existencia de una demanda real e insatisfe- cha de este servicio por parte de la población titular de derechos como la capacidad de ambos

Jozefovic’s objective in the facilities he owns and operates has been focused on the development of geriatric nursing and sub-acute rehabilitation programs to ensure the fiscal