SAP ECC 6.0
SAP ECC 6.0
Service Order Processing
Service Order Processing
Manual Instructions and Specifications
Manual Instructions and Specifications
(Ryan Niu, Nov. 20
(Ryan Niu, Nov. 20
thth2007)
2007)
MSN: nyfresh@hotmail.com
MSN: nyfresh@hotmail.com
Revision history
Revision history
Version Date Version Date
DD/MM/YY DD/MM/YY
C
Chhaannggeed d bbyy RReeaassoon n ffoor r cchhaannggee
Table of contents
Table of contents
Busi
Business ness scenscenarioario ... - 3 - 3 --Task 1
Task 1: Sal: Sales documes document tyent typepe ... - 3 - 3 --Task 2: Del
Task 2: Delivery anivery and transpord transport schedt schedulinguling ... - 5 - 5 -Task 3: It
Task 3: Item: conem: consumablsumable materie materialal ... - 5 - 5 -Task 4:
Task 4: CopyCopying coning controltrol ... - 7 - 7 -Task 5: Se
Task 5: Servirvice Item...ce Item... - 8 - 8 -Task 6: Part
Task 6: Partner Funner Function...ction... - 8 - 8 -Task 7:
Task 7: OutpuOutput...t... - 12 - 12 -Task 8: C
Task 8: Customustomer maser master recordter record ... - 17 - 17 -Task 9: Materi
Task 9: Material master recoal master record- Servird- Service material...ce material... - 18 - 18 -Task 10: S
Task 10: Serviervice order...ce order... - 20 - 20 -Task 11:
Task 11: DelDelivery...ivery... - 21 - 21 -Task 12: B
-Business scenario
Your company offers maintenance and repair services for computer equipment. To do this, your staff sometimes visits your customer’s site. The Service Management (SM) component is not used by your company.
One of your customers informs you by telephone that they are having problems with their computer. An experienced employee decides that the problem has to be solved by a
technician at the site and decides which spare parts they will need. The technician is automatically informed. He owns a ‘spare parts’ tool box which he fills by taking parts from the warehouse. The order confirmation contains the service (for example, technician category, hours taken) and a reminder that the dollar amount of the invoice depends on the time taken and cost of the repair.
Any unused parts are returned to the warehouse. The technician then enters the materials he used, the time the repair took, and traveling expenses (for example, taxi and hotel) in an overview sheet. This sheet is used to create an invoice for the customer.
Task 1: Sales document type
1. Copy the referenceOR standard order and use the same copying controls. a) IMG-> Sales and Distribution-> Sales-> Sales Documents-> Sales
Document Header -> Define Sales Document Types-> Select sales document type OR-> Button: Copy
2. Prevent external number assignment. a) No. range ext. assg., Blank
3. Prevent the system from reading the customer-material info records. a) Read info record field :Blank
4. Deactivate the settings for credit limit checks. a) Check credit limit field :Blank
b) Contract messages field :Blank
5. Deactivate the checks for open quotations and contracts. a) Quotation messages field: Blank
Contract messages field: Blank
6. Set billing block 02 No completion confirmation.
a) Billing block field:02 Compl. Confirmation missing 7. Deactivate the settings for payment card processing.
a) Payment guarantee procedure field: Blank Payment card plan type field: Blank
Checking group field : Blank
8. Use the current date as the requested delivery item. a) Lead time in days field: Blank
Task 2: Delivery and transport scheduling
1. Deactivate delivery and transportation scheduling for the new sales document type ZSOR.
a) IMG->Sales and Distribution-> Basic Functions-> Delivery Scheduling an d Transportation scheduling-> Define Scheduling by Sales Document Type
DlvSchedlg field : Blank TranspSch field :Blank
Task 3: Item: consumable material
1. When you enter consumable materials, the system does not run an availability check, there is no transfer of requirements and p icking is not necessary. However, you do need to post goods issue in order to update inventory management. Since the delivery quantity (goods issue quantity) is the same as the order quantity, you can invoice these items using order-related billing, like service ite ms. This means that you can invoice the customer for all the items in the sales document without any further processing.
a) Create a new item category,ZSTN as a copy of item categoryTAN . b) Configure the item category so that order-related billing is made. Deactivate the Credit Management function.
Relevant for billing field: B Relevant for order-related billing- Status according to order quantity
c) Configure the system so that it finds the new item categoryZSTN for materials in item category group NORMin the service order. Do not permit any other item categories.
IMG-> Sales and Distribution-> Sales-> Sales Documents-> Sales Document Item-> Assign Item Categories
2. Change the schedule line category assignment so that the system finds schedule line category CN for consumable materials such as T-ATO01 (Plant:1200) in IDES. MRP type is VM for materialT-ATO01.
IMG-> Sales and Distribution-> Sales-> Sales Documents-> Schedule lines-> Assign schedule line categories.
All materials that contain MRP typeVM in the material master are assigned to schedule line categoryCN.
Entry: ZSTN VM CN
All materials that do not contain MRP type in the material master are assigned to schedule line category CN.
Entry: ZSTN blank CN
3. Deactivate the picking-relevant indicator for item category ZSTN in the delivery item category.
IMG->Logistics Execution-> Shipping-> Deliveries-> Define Item Categories for Deliveries
Task 4: Copying control
You need to configure your copying control so that you can create an order-related billing document for item category ZSTN in sales document typeZSOR.
Note: Go to copying control for billing documents and choose process Sales
document
ZSOR->Billing document
F2and branch to item step. Copy the
Task 5: Service Item
Configure your sales document type ZSOR so that item categoryTAD Services is
automatically assigned to items with services (materials form item category groupDIEN).
Task 6: Partner Function
1. If you need a technician to carry out the repair, you need to record this information in the service order. The technician sho uld then be informed automatically by mail when he or she is needed. Set up the necessary partner controls to allow this to happen.
IMG-> Sales and Distribution-> Basic Functions-> Partner Determination-> Setup Partner Determination
2. Define a new partner function 8F with description PC technician.
Set up Partner Determination for Sales Document Header-> Double-click Partner Function folder-> Button: New Entries
Function: 8F
Description: PC technician
3. Define a new partner determination procedure ZSTA with description Service procedure ZSTA for sales documents and copy the following partner functions in
to this procedure. SP Sold-to Party BP Bill-to Party PY Payer SH Ship-to Party 8FPC technician
Specify all partners as mandatory.
4. Assign procedure ZSTA to your sales document typeZSTA. a) -> Partner procedures assignment folder
Change entry: sales document typeZSTA-> procedure ZSTA Save
5. Define new Account GroupZ001-PC technician.
IMG-> Financial Accounting-> Accounts Receivable and Accounts Payable-> Customer Accounts-> Master Data-> Preparations for Creating Customer Master Data-> Define Account Groups with Screen Layout (Customers)
6. Assign Number Ranges to Customer Account GroupZ001.
IMG-> Financial Accounting-> Accounts Receivable and Accounts Payable-> Customer Accounts-> Master Data-> Preparations for Creating Customer Master Data-> Assign Number Ranges to Customer Account Groups
7. Set Up Partner Determination for Customer Master
IMG-> Sales and Distribution-> Basic Functions-> Partner Determination-> Setup Partner Determination
Set Up Partner Determination for Customer Master, double click.
9. PC technician in Sales order header
Here input PC technician number 5982, Enter.
Task 7: Output
1. The PC technician entered in your service order should automatically receive a mail telling him or her when they are needed. This output should be created when you save the sales order and appear automatically as mail in the emplo yee’s office inbox.
a) IMG->Sales and Distribution-> Basic Functions-> Output Control-> Output Determination-> Output Determination Using the Condition Technique
2. Create an output type. To do this, copying output type MAIL from standard SAP system with all its dependent entries.
3. Maintain appropriate default values for the output master records for output type ZM00.
-> Maintain output types-Button: Change
Details of output type->Tab page: Default values Transm. Medium:7 SAP office
Partner function: 8F PC technician Time:4 Send immediately
4. Create the relevant mail data in the output type. Document title: Service Mail##
Mail text
You have a repair order.
Customer: &VBAK-KUNNR& Order: &VBAK-VBELN& Good luck!
5. Assign output type ZM00to partner function 8F Select output type ZM00
Dialog structure: Partner function Button: New Entries
Medium: 7(SAP office)
Function: 8F(PC technician)
Confirm your entries with Enter and Save the data.
6. Make sure you have assigned a suitable processing program to output type ZM00. Select output type ZM00
Dialog structure: Processing routines
Program: RSNASTSO
7. Include the output in output determination procedureV1000 for orders at step 60+11. Set condition 2.
Requirement 2 means that output ZM00 is only activated in the document
when the document is complete.
For example, if the PC technician has been defined as a mandatory partner, the output is only activated in the document if a valid personnel number has assigned to partner function 8F in the sales document.
b) Use default values form the condition record. -> Return
Language: maintain DE
9. When your PC technician receives the automatic mail about the customer visit, he should be able to go directly from the mail to the sales document so that he can obtain all the information he needs for the visit.
To do this, save the relevant communication data in the master record for output type ZM00.
Button: Communication
Confirm the dialog for the phantom recipient withYes.
In the Phantom recipient line, activate the Express mail field.
Menu: Go to-> Execution parameters
Execution category: T(Execute a transaction)
Execution element: VA03(Display sales document) Activate field: Execute: Skip first screen
SET/GET parameter:
Task 8: Customer master record
Task 9: Material master record- Service material
Change the item category group of your material T-ATP01 to DIEN (service material) in sales view 2.
Logistics-> Sales and Distribution-> Master Data-> Products -> Material-> Services-> Change
Task 10: Service order
1. Enter a text item that documents the repair.
In the Description field, enter the textPC repairs.
Partner function8F- PC technician at sales order item level
2. Once you have finished the repairs, you enter the service provided in the order. Your technician has installed a new monitor. Set the requested delivery date to one week from today.
Material: T-ATP01 (1 hour) Material: T-ATO01 (1 unit)
Task 11: Delivery
Deliver the service order
Task 12: Billing
Sales document flow from sales order view.
Condition type R100 exists in pricing procedure, that’s why serviece net value is 0. we can deactive this 100% discount.