• No results found

Appendix 1: List of options and policies assessed against SA framework

N/A
N/A
Protected

Academic year: 2021

Share "Appendix 1: List of options and policies assessed against SA framework"

Copied!
5
0
0

Full text

(1)

Sustainability Appraisal: Core Strategy - Proposed Changes to Pre-Submission 1

Appendix 1: List of options and policies assessed against SA framework

The following is a comprehensive list of all options and policies that have been appraised. It sets out where the commentary on the policy/option/alternative option and where the matrices are located. They are either in this SA, the Proposed Changes to the

Pre-Submission (September 2011), or in the ‘Pre-Submission’ version (November 2010). The table below also highlights where in

those tow versions of the SA that the information is available, either in the SA Report or in the appendices (marked “App”).

Table 2.7: Location of assessment of options and policies

Reference List of options and policies assessed against SA Framework SA Document Commentary Matrices Development Options (2009)

DOU Development Option: Focus development at Upton Pre-Submission App 7 App 9 DOW Development Option: Concentrate growth on edge of Wareham Pre-Submission App 7 App 9

DOS Development Option: Focus growth at Swanage Pre-Submission App 7 App 9

DOPO Development Option: Preferred Option Pre-Submission App 7 App 9

DOP Development Option: Proportionate Development Pre-Submission App 7 App 9 DOD Development Option: Dispersal to all settlements Pre-Submission App 7 App 9 DOWo Development Option: Improve self-sufficiency of Wool Pre-Submission App 7 App 9 DOB Development Option: Improve self-sufficiency of Bere Regis Pre-Submission App 7 App 9 DOL Development Option: Improve self-sufficiency of Lytchett Matravers Pre-Submission App 7 App 9

Where Shall we Build in Purbeck? (June 2010)

BRA Bere Regis Site A Pre-Submission App 8 App10

BRB Bere Regis Site B Pre-Submission App 8 App10

BRC Bere Regis Site C – Employment site Pre-Submission App 8 App10

BRD Bere Regis Site D Pre-Submission App 8 App10

BRE Bere Regis Site E – School site Pre-Submission App 8 App10

LMA Lytchett Matravers Site A Pre-Submission App 8 App10

LMB Lytchett Matravers Site B Pre-Submission App 8 App10

LMC Lytchett Matravers Site C – now included in Policy NE Pre-Submission App 8 App10

LMD Lytchett Matravers Site D Pre-Submission App 8 App10

LME Lytchett Matravers Site E Pre-Submission App 8 App10

(2)

Sustainability Appraisal: Core Strategy - Proposed Changes to Pre-Submission 2

SWB Swanage Site B Pre-Submission App 8 App10

SWC Swanage Site C Pre-Submission App 8 App10

SWD Swanage Site D Pre-Submission App 8 App10

U Upton – Policemans Lane – now included in Policy NE Pre-Submission App 8 App10 WA Wareham Area A – now included in Policy CEN Pre-Submission App 8 App10

WB Wareham Area B Pre-Submission App 8 App10

WOA Wool Site A Pre-Submission App 8 App10

WOB Wool Site B Pre-Submission App 8 App10

WOC Wool Site C Pre-Submission App 8 App10

WOD Wool Site D Pre-Submission App 8 App10

Alternative Additional Growth Scenario Options

WS2750 Western Sector, Lytchett Minster Proposed Changes

to Pre-Submission

This SA report App 6

W600 Wool, Dorset Green 400-600 dwellings Proposed Changes

to Pre-Submission

This SA report App 6

W1000 Wool, 600-1000 dwellings Proposed Changes

to Pre-Submission

This SA report App 6 Spatial Objective 1

LD General Location of Development Proposed Changes

to Pre-Submission

This SA report App 4

NW North West Purbeck Proposed Changes

to Pre-Submission

This SA report App 4

SW South West Purbeck Proposed Changes

to Pre-Submission

This SA report App 4

CEN Central Purbeck Proposed Changes

to Pre-Submission

This SA report App 4

NE North East Purbeck Proposed Changes

to Pre-Submission

This SA report App 4

SE South East Purbeck Proposed Changes

to Pre-Submission

(3)

Sustainability Appraisal: Core Strategy - Proposed Changes to Pre-Submission 3

CO Countryside Proposed Changes

to Pre-Submission

This SA report App 4 Spatial Objective 2

HS Housing Supply Proposed Changes

to Pre-Submission

This SA report App 4

HS 2100

Housing Supply –Alternative Option - 2,100 dwellings Proposed Changes to Pre-Submission

This SA report App 5 HS

5150

Housing Supply - Alternative Option - 2,100 dwellings – 5,150 dwellings

Proposed Changes to Pre-Submission

This SA report App 5

AHT Affordable Housing Tenure Proposed Changes

to Pre-Submission

This SA report App 4

AH Affordable Housing Proposed Changes

to Pre-Submission

This SA report App 4

AH04 Affordable Housing – Alternative option - 2004 local plan levels Pre-Submission n/a App 12

AH-1 Affordable Housing – Alternative option – Threshold lowered to one dwelling and above

Pre-Submission n/a App 12

RES Rural Exception Sites Proposed Changes

to Pre-Submission

This SA report App 4 GT Site Criteria for Gypsies, Travellers & Travelling showpeople Proposed Changes

to Pre-Submission

This SA report App 4 Spatial Objective 3

BIO Biodiversity and Geodiversity Proposed Changes

to Pre-Submission

This SA report App 4 DH Dorset Heaths International Designations Proposed Changes

to Pre-Submission

This SA report App 4

PH Poole Harbour Proposed Changes

to Pre-Submission

This SA report App 4 Spatial Objective 4

RFS Retail Floor Space Supply Proposed Changes

to Pre-Submission

(4)

Sustainability Appraisal: Core Strategy - Proposed Changes to Pre-Submission 4

RFSW Retail Floor Space Supply – Alternative Option -Wareham foodstore option

Pre-Submission n/a App 13

RFSS Retail Floor Space Supply – Alternative Option - Swanage foodstore option

Pre-Submission n/a App 13

RFSWS Retail Floor Space Supply– Alternative Option - Wareham & Swanage foodstore option

Pre-Submission n/a App 13

RP Retail Provision Proposed Changes

to Pre-Submission

This SA report App 4

CF Community Facilities and Services Proposed Changes

to Pre-Submission

This SA report App 4 GI Green Infrastructure, Recreation and Sports Facilities Proposed Changes

to Pre-Submission

This SA report App 4 Spatial Objective 5

FR Flood Risk Proposed Changes

to Pre-Submission

This SA report App 4

GP Groundwater Protection Proposed Changes

to Pre-Submission

This SA report App 4

CE Coastal Erosion Proposed Changes

to Pre-Submission

This SA report App 4 Spatial Objective 6

D Design Proposed Changes

to Pre-Submission

This SA report App 4

SD Sustainable Design Proposed Changes

to Pre-Submission

This SA report App 4

REN Renewable Energy Proposed Changes

to Pre-Submission

This SA report App 4 Spatial Objective 7

LHH Landscape, Historic Environment and Heritage Proposed Changes to Pre-Submission

This SA report App 4 Spatial Objective 8

(5)

Sustainability Appraisal: Core Strategy - Proposed Changes to Pre-Submission 5

ELS Employment Land Supply Proposed Changes

to Pre-Submission

This SA report App 4

ELS11 Employment Land Supply – Alternative Option - Approx 11 ha Pre-Submission n/a App 15

ELSSW Employment Land Supply – Alternative Option – Policy ELS plus additional 1ha at Swanage & 1ha at Wareham

Pre-Submission n/a App 15

E Employment Proposed Changes

to Pre-Submission

This SA report App 4

TA Tourist Accommodation and Attractions Proposed Changes

to Pre-Submission

This SA report App 4

MOD Military Needs Proposed Changes

to Pre-Submission

This SA report App 4

CZ Consultation Zones Proposed Changes

to Pre-Submission

This SA report App 4 Spatial Objective 9

IAT Improving Accessibility and Transport Proposed Changes

to Pre-Submission

This SA report App 4 ATS Implementing an Appropriate Transport Strategy for Purbeck Proposed Changes

to Pre-Submission

This SA report App 4 Implementation and Monitoring

DEV Development Contributions Proposed Changes

to Pre-Submission

References

Related documents

In this module Data user Home this contains Basic functionalities of cloud that can be helpful for data Owner who is logged on already in session.. The search request is

• The candidate acting as the instructor should critique “students” by using the skills station checklist from the ACLS Provider Manual or Instructor Manual/CD • The

On May 12, 2005, the Board of Directors approved the Delaware Certified Paralegal (DCP) Program in an effort to continue to promote a high level of education and professionalism,

Not- withstanding extreme scenarios of how the Gulf War might unfold, market participants pricing options did not believe disruptions were likely: the probability of greater

In order to verify whether the mechanism of the regulation of trichothecene type B induction by agmatine is shared by different species of Fusarium, we tested the hypothesis on

Information regarding the depth, presence of a sill, the width of the glacier and type of bedrock were obtained from sea charts available at

The true cost of the project is the loss associated with a longer time to market (typically two to four times that of local production), plus the cost of your time managing and

Process Starting Welding Current Regulation Current Range Amps Duty Cycle @ 60% Welding Voltage OCV Auxiliary Output 110V Dimensions L x W x H mm Weight Kg MagicWeld 150 Mk II

Like quantitative restrictions under Article XI of GATT, the market access restrictions specified in Article XVI of GATS are, for committed services sectors, in principle,

As stipulated in the RFP and explained at the pre-proposal conference, the evaluations focused on four criteria: the business plan with a possible 15 points; design and

The other case studies also consider the design of a hybrid distribution circuit: Aereo built its service by attempting to retransmit programming without permission; Netflix

Results: Higher temperature, blood leukocyte count, neutrophil count, neutrophil percentage, C-reactive protein level, D-dimer level, alanine aminotransferase activity,

Throughout the period from the Listing Date to 31 March 2016, the Company had a minimum of three independent non-executive Directors and at all times met the requirements of the

In order to create a new holiday calendar, mark the field and click on the button..  Click on the button to create a new

eclipse book download app store android viet nam game development companies in las vegas learn android app development free where to learn mobile app development how to make an

• Can develop a wide range of apps – Communication, Finance, Media, Tools etc • Ability to integrate various smartphone • Ability to create your own art and customise. Sound

store update badge won't go away how to create an music app auto update apps iphone ios 7 why is iphone app store not working iphone app development prices uk iphone app store

make java documentation android app building game android development nexus 7 2013 android sdk ndk ubuntu android apps development tools how to make calculator app in android

development freelance how to run android games on windows 7 pc nexus 7 developer options kitkat android app development rules how to make an app for apple ipod android

The realized studies are aimed at the determination of the technological appropriateness of Midas wheat seeds for producing flour and bread and using

All Italian regions have issued specific laws providing business incentives such as: • grants or subsidised loans to SMEs for capital expenditure and business creation • aids to

Accountability, Code Integrity Issued by Apple.. App development