Cost Savings/ROI Achieved from

BuilderMT’s Workflow Management Suite

As companies survive and then grow, the need to maximize efficiencies becomes more essential to maintain the bottom-line profitability. When evaluating technology, builders need to first examine their internal processes and procedures and then implement the right technology that will adhere to these processes. BuilderMT’s Workflow Management Suite (WMS) was designed as a workflow/process-based system for single- and multi-family production homebuilders based upon the industry-accepted best workflow processes. These processes, combined with the latest technology, truly equip builders to realize some exceptional return on investment (ROI).

For example, if a homebuilder can save an average of 25% of their current staff time by improving their internal processes, they could realize annual savings of $8,750 per staff employee.

 Using conservative numbers: one staff employee earns $35,000 annually, plus taxes and benefits.

 25% savings would be $8,750 per year.  10% savings would be $3,500 per year.

Multiply the above scenarios by the number of staff employees you currently have, and you are looking at a serious ROI.

Typically, builders will start to add internal office staff as they grow. With the implementation of a true workflow/process-based system, we have seen the contrary. Builders are able to grow substantially without the need for any additional internal staff. That is quite a statement! If you are forecasting growth in your organization, imagine the savings you will realize as demonstrated above.

Two other returns can be found in the ability to produce more accurate takeoffs/bids and in our excellent ability to track and manage variance costs that rob jobs of margin. Even with turnkey builders, we are seeing an increased efficiency in more accurate takeoffs/bids and a reduction in the amount of variance dollars per house.

Using conservative numbers again: Increase the accuracy of bids by 30% and reduce variance costs, saving between $150 and $2,000 per home. Assuming $300 per unit savings, for example:

 Increase Accuracy and Variance Control, based conservatively on a 100 units per year.  100 units/year x $300/unit = $30,000 per year or $2,500 per month savings.

(2)

 Compare these savings to the investment of purchasing the right technology at $50,000 based on a 60- month lease.

 $50,000 leased over 60 months equals $1,130 per month. Compare this to a very conservative $5,000 per month savings. That is a $3,870 per month, or $46,440 per year, net savings.

 You have achieved a 343% ROI!

Therefore, when evaluating how many concurrent licenses of WMS a builder would need for its organization, the builder must first examine the number of homes it is going to build in a given year and break this down by start packages per day. For example, if a builder is going to build 150 homes per year and start 12.5 homes per month (150/12 months), then it is going to start 2.9 or 3 homes per week (12.5/4.33 weeks per month). Based upon the following, this builder would need only one use of WMS Purchasing to handle these 150 homes per year. The following examples are based upon average number of hours reported by BuilderMT clients.

One start package per day:

Completing the Purchase Order (PO) Start Package for one start = 45 minutes Approving POs for payment:

 If using Scheduling and Wireless Scheduling and the superintendent is approving = 0 minutes per day  If not using Scheduling or having Scheduling just mark an activity/PO as complete = 30 minutes per

day

Total time per one start package per day = 1 hour, 15 minutes Other tasks within WMS Purchasing:

Bidding and maintaining pricing per plan, elevation and option = 2 hours per day Updating vendor, job and miscellaneous information = 30 minutes per day

Therefore, BuilderMT recommends one use of Purchasing for every 150 homes built per year. Benefits:

The following pages will demonstrate some of the ways that builders can benefit from implementing WMS. When purchasing technology, if the benefits/savings outweigh the expense/cost, then it makes sense to move forward; if not, then stay where you are.

 Project managers and superintendents do not spend time coding invoices and matching costs to budgets.

 WMS can reduce AP staffing requirements by 50-70% by eliminating all PO-related invoice data entry through autopay.

 Electronic updating of contract price changes by vendors reduces amount of time required to update the cost-based model and option database.

 Completing takeoffs of new plans or major revisions of existing plans is 70% faster and 30% more accurate.

(3)

 With BuilderMT’s Bid Management feature, included in the Purchasing Module, builders can cut one to two days off of their bidding process due to the efficiencies of electronic bidding and tracking via the use of the Trade Portal and e-mail.

 Amount of time required to compile project manager, superintendent and senior management reports is significantly reduced. Senior management’s customized reports are available with the push of a button. Report data is reviewed in real-time, providing increased accuracy and improved profitability and trend analysis. WMS’ report and inquiry tools are easy to use as well as utilize current state-of-the-art technology.

Ten Reasons Why a Homebuilder Should Implement WMS

Issues

Features

Benefits

1. Builder needs to analyze profit margin by project, community, unit, model and options.

 WMS allows the builder to automatically generate base model and option costs. Job Cost Software allows analysis of model and option cost by:  Original budget

 Change orders  POs

 Variances

 Actual Costs (Payments)

 Builder can quickly analyze margin by model, option, and community or across multiple communities using Job Cost.

2. Builder needs to easily

generate and track committed costs to subs and suppliers.

 WMS allows the builder to quickly and easily generate POs based upon buyer selections.  POs can be released in stages

to subcontractors and suppliers at current prices.

 Builder controls costs by defining scope of work and payment schedule. POs double as payment vouchers to subs. Payments can be automatically generated from POs.

 Builder avoids over paying or double paying a sub or supplier.

3. Builder needs to track owner change orders effectively through the accounting process.

 WMS allows the builder to specify a change order at any point in the construction process.

 Change orders update the budget and PO information in the Job Cost Software.

 By managing change orders, builder can prevent profits from slipping through the cracks.

(4)

4. Builder needs to track variance costs and/or VPOs. Variance costs negatively impact bottom- line margins.

 WMS allows the builder to create a VPO as well as specify the reason for the cost.  VPOs can be categorized into

definable groups like theft, weather, estimator error, inferior materials,

subcontractor problems, sales mistakes, inaccurate

architectural or engineering specs, etc.

 Builder can effectively analyze causes of VPOs across

communities or projects.  VPO analysis can identify

problems with subs, designs or materials.

5. Invoice approval process is labor intensive, time

consuming, counter-productive and inaccurate.

 WMS has the ability to use approved POs to automatically generate accounts payable invoice data into Accounts Payable Software.

 By streamlining the payment process, builder can reduce staff costs or reassign

workforce to alternate activities within the company.

6. Manual creation of spreadsheets is time

consuming, and accuracy of reports and data analysis can be inconsistent.

 WMS’ Report, Inquiry and Financial Statement design tools allow for direct reporting of data without re-entry into spreadsheets or external databases.

 Reduces the chance for error and eliminates the need to handle the information more than once.

 Designing custom reports allows a builder to analyze information from different perspectives.

7. Maintaining a database or price book of subcontractor and supplier pricing for every model and option by community is difficult and time consuming.

 WMS has a price book database that allows the builder to track multiple trades and supplier price quotes for every model, option, task or item.

 The price book allows the builder to track up to three historical prices as well as up to two future prices.

 The price book can be updated electronically by a spreadsheet, which can be e-mailed, printed, faxed or mailed to the sub or supplier.

 Builder can reduce the amount of time spent on updating the database. Subs and suppliers can provide data in electronic format for re-pricing a

database, lowering staff costs.  Builder, sub and supplier can

use off-the-shelf spreadsheet software programs to exchange pricing information.

(5)

8. Labor and overhead costs are too high for the volume of business.

 WMS was designed around the “Best Practices Management Philosophies of Home Builders.” The product allows total

integration from the sales office through production and into Job Cost accounting.

 WMS requires a fewer number of staff to run and maintain compared to other systems in the market.

 Total Integration allows a builder to effectively manage costs by streamlining workflow and increasing productivity.

9. Current accounting software does not give you adequate financial reporting flexibility. Reports are produced by recreating the data in spreadsheets or third party products.

 WMS is powered by two options for accounting—Sage Timberline Office and Explorer Contract Manager—which offer a powerful General Ledger. The products allow for:  Financial statement

consolidations at any level.  Reporting using cash, accrual

or both.

 Inter-company accounting.  Percentage of ownership

reporting.

 Customized financial

statements including cash flow analysis.

 Builder can easily report financial information to management and lending institutions.

 Custom reporting eliminates the need of have programmers design and configure financial statements, thus reducing costs of maintaining the software.

(6)

10. Lack of a comprehensive, integrated data system causes individual departments in the company to do their own thing.

 WMS was designed as an integrated software package that moves information from the sales office, to PO creation, to production and finally into job cost in order to track:  Budget to cost analysis  Profit margin analysis  Change order and VPO

analysis

 Cost-per-square-foot analysis

 Cash flow and cash requirement forecasting  WMS performs all of the above

tasks, eliminating the need for multiple pieces of software that do not talk to each other.

 Builder can establish consistent workflow processes and

eliminate duplication of effort.  Improved staff productivity

lowers overhead costs.

 Employees can be cross-trained on various tasks within the WMS process, raising awareness of how the data flows from one department to another.

There are no guarantees concerning the level of success you may experience with the software represented above. As with any business, your results may vary and will be based on your individual capacity, business experience, expertise and staffing. The testimonials and examples presented are actual results from BuilderMT clients and are not intended to represent or guarantee that anyone will achieve the same or similar results.

References

Related documents

Next, stock and CFD traders divide the current stock price by the book value to determine the price-to-book ratio.. If the stock was trading at $20, it would have a price-

with the Sales and Purchase Order Processing modules and the Price Book and ensuring that purchase orders are placed with the correct supplier at the right price and that

We can trade in the habits of the amateur and the addict for the practice of the professional and the committed artist or entrepreneur.. It may help, as a jumping-off

for Sale' and 'Held for Trading' categories is the market price of the scrip as available from the trades/quotes on the stock exchanges, price list of RBI,

Sell orders entered into the Order Book with a lower sell price than the buy order with the highest price (crossing prices), will be matched into one or more trades depending on

Statement covers period from through CALIFORNIA FORM 460 PER ELECTION TO DATE (IF REQUIRED) CUMULATIVE TO DATE CALENDAR YEAR (JAN. 31) AMOUNT RECEIVED THIS PERIOD IF AN

b) If a student has completed more than 60 percent of the total enrolment period, Embassy will not refund any unused tuition. c) No Shows: Full tuition fees will be refunded.

A Simple List allows you to create shorter, immediate need orders manually entered or based on the material lists from one or more task items in the price book.. Simple lists can