Calculation Spreadsheet_Slug Catcher

N/A
N/A
Protected

Academic year: 2021

Share "Calculation Spreadsheet_Slug Catcher"

Copied!
13
0
0

Loading.... (view fulltext now)

Full text

(1)

Proj No

Calc No

Phase/CTR

Page

1

6

pages

rev3

by3

rev2

by2

rev1

by1

Rev

Date

By

Conclusions

date2

1. ACI 318-11 (Building Code Requirement for Structural Concrete)

desc1

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective

employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.

Description

desc2

app1

app3

date1

Checked

Title

desc3

Version

Validation (Y / N / N/A)

date3

Microsoft Excel

2010

11109

phase

Slug Catcher Foundation Design

calc no

Elec File Location

\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet

Calculation Title

Project Title

Assumptions

References

To design a suitable foundation base and pedestal for the pig launcher

Project File Location proj file

Software Used

Calculation Objective

Calculation Cover Sheet

Calculation Method

Customer

Oso-QIT Pipeline FEED Update Project

MPN

Approved

app2

chkd2

chkd1

chkd3

Note: to create a new line

within a cell, press

Alt+Enter.

(2)

Section

Description

General

Disclaimer wording modified

General

Project and calc information created as named fields

Checklist

Added checkboxes regarding signoffs and date formats. Modified units checkbox to

include unit conversions. (per PI#4508)

(3)

Proj No

Calc No

Phase/CTR

Page

2

of 6

pages

Alternative method calculation and/or representative check performed and filed, as required.

rev3

by3

rev2

by2

rev1

by1

Rev

By

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This

Input data correct.

Appropriate cross-references.

Changes clouded.

Description

Date

Calculation tolerances stated if significant.

Checked

Approved

Dates in standard format (DD-MMM-YY)

Calculations:

Customer

phase

calc no

11109

\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet

Calculation Title

Oso-QIT Pipeline FEED Update Project

app1

chkd1

desc1

Calculation re-checked if required.

For software based calculations, reference to software verification if available.

Project File Location

Table of Contents.

proj file

Project title shown.

Please check boxes for all applicable items checked or mark as "N/A" if not appropriate:

date1

Elec File Location

Project Title

Revision history block updated.

Reference made to text, standard or code. Check version/edition with that required for project.

Calculation title shown.

Summary of results or conclusions if appropriate.

app2

chkd2

Source of input data stated (with revision number and date if relevant).

desc2

Abbreviations correct.

Calculation arithmetically correct OR software previously verified and reference to verification checked.

Revisions:

Checked and annotated copy of calculation filed (use "Check Print" stamp).

Calculation Checklist

Assumptions stated.

Customer's requirements included/addressed.

Method clear and easy to follow.

Approach used is appropriate for problem being solved.

chkd3

Appropriate stamp for preliminary issues.

Calculation objectives (aims) stated.

Units used as required by customer. Unit conversions correctly performed.

Calculation result within expected limits.

MPN

Slug Catcher Foundation Design

Revision history box complete and signed.

Calculation method defined or described (including formulae if relevant).

Calculation number assigned and registered (refer to project numbering system or Document Numbering System

EPP-0040 for format).

app3

Appendices included and referenced, as required.

Corrections made as required and calculation dated and signed on cover sheet by checker.

Checking Records:

Sketches included and clearly labelled, where required.

date2

Document Sign-offs (typed full names of Originator, Checker, Approver; to be initialed beside at sign-off)

Considered design reviews, Hazop actions, client input, safety and environmental issues, etc.

(4)

1

Calculation cover sheet

1

2

Calculation checklist

2

3

Calculation sheets

3 -

6

Elec File Location

Proj No

Phase/CTR

Calc No

Customer

Calculation Title

Project Title

calc no

11109

Oso-QIT Pipeline FEED Update Project

By

Date

By

Checked

Project File Location

Rev

Checked

proj file

Rev

Table of Contents

by2

rev3

Date

chkd1

chkd2

chkd3

Checked

date3

pages

phase

\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet

Slug Catcher Foundation Design

Page

3

of 6

MPN

Rev

by3

Date

By

(5)

Weight of slug catcher

=

lbs

=

kips

Length of pig launcher

=

13.2 ft

Bearing pressure

=

2000

psf

=

2 ksf

Distance between supports

=

6.2 ft

kips

26.3 ft

Ra

=

kips

Rb

=

kips

f'c

=

4 ksi

fy

=

60 ksi

Critical plane

Dead load, D

=

kips

k

Cover

=

2 in

ft

Bar diameter

=

in

3 ft

ft

ft

ACI318-11

Design

Procedure

Calculation

Section

Aid

Sizing the footing

Ignoring the self weight of the footing

D/a

=

sq.ft

Use

x

ft

Area

=

sq.ft >

sq.ft

OK

Required strength

U

=

1.4 D

U

=

k

or

ksf

Design for shear

Ф shear

=

9.3.2.3

Assume Vs = 0 (no shear reinforcement)

Ф Vn

=

Ф Vc

11.1.1

One way shear action

bw

=

in

d

=

# in

h

=

in

Vc

=

2 (f'c)^½ bw d

11.3.1.1

Ф Vc

=

kips

Vu

=

B x[(L/2) - ((b/2) + d)/12)] x U

Vu

=

11.12.1.1

20.2

10

20.2

377,150

377

377

12

ft

188.6

188.6

10

20

120

245

94.29

9.2

264

2.2

0.75

by2

chkd2

rev3

date3

by3

chkd3

rev1

date1

by1

chkd1

rev2

date2

By

Checked

Rev

Date

By

Checked

Rev

Date

By

Checked

Rev

Date

Project File Location

proj file

Page

4

of 6 pages

Calculation Title

Slug Catcher Foundation Design

Phase/CTR

phase

Elec File Location

\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet

Calculation Sheet

Customer

MPN

Proj No

11109

Project Title

Oso-QIT Pipeline FEED Update Project

Calc No

calc no

188.6

0.05

188.6

54.9

12

12

10.0

94.29

144

20

(6)

ACI318-11

Design

Procedure

Calculation

Section

Aid

Ф Vn

=

Ф Vc > Vu

OK

Calculate moment at

Mu

=

U x critical plane distance x l/2

15.4.2

pedestal face

kip-ft

Compute flexural

Ф kn

=

Mu (12000) / bd2

tension reinforcement

=

psi

(bottom bars)

for Ф kn =

psi, select ρ =

%

Flexure 1

Area of steel, As

=

ρbd

=

in2

Check for As,min

=

0.0018bh

10.5.4

As,min

=

in2

As,min < As

OK

Use 23 no of #4 (0.5'') bars distributed uniformly

across the entire 8ft width of the footing @

8'' c/c

Use 12 no of #4 (0.5'') bars distributed uniformly

across the entire 15ft width of the footing @

8'' c/c

ft

19- #401 - 8'' U. BAR

16 - #402 - 8'' U. BAR

12

10 ft

20.2

1.45

4.32

Customer

MPN

Proj No

11109

Project Title

Oso-QIT Pipeline FEED Update Project

Calc No

calc no

Calculation Title

Slug Catcher Foundation Design

Phase/CTR

phase

Elec File Location

\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet

Project File Location

proj file

Page

5

of 6 pages

Checked

Rev

Date

By

Checked

Rev

Date

By

Checked

Rev

Date

By

31.2

date1

by1

chkd1

rev2

date2

425.080

425.080

1370

7.12

by2

chkd2

rev3

date3

by3

chkd3

(7)

Loading

Ultimate load, Pu

=

kips

(Weight of Slug catcher)

Ultimate moment, Mu

=

kip-in

Assume ϕ

=

Nominal axial load

=

kips

Nominal moment

=

kip-in

Material

f'c

=

4 ksi

fy

=

ksi

Column size

h

=

in

b

=

in

ACI318-11

Design

Procedure

Calculation

Section

Aid

Determine reinforcement

Pn

=

kips

ration ρg using known

Mn

=

kip-in

values of variables on

h

=

in

appropriate interaction

b

=

in

daigram(s) and compute

Ag

=

b x h

=

in2

required cross section

area Ast of longitudinal

reinforcement

A. Compute Kn=Pn/(f'cAg)

Kn

=

B. Compute Rn=Mn/(f'cAgh)

Rn

=

C. Compute ϒ ≈ (h-5)/h

ϒ

=

D. Determine the

appropriate interaction

For a rectangular tied column with bars along

diagram(s)

four faces f'c = 4ksi, fy = 60ksi and an

estaimated ϒ of 0.90, use R4-60.9

10.2 &10.3

Columns 3.2.4

(R4-60.9)

E. Read ρg for Kn and Rn

Provide nominal reinforcements

values from appropriate

interaction diagrams

Pedestal Design

Customer

Oso-QIT Pipeline FEED Update Project

Rev

chkd1

Date

By

by1

Checked

pages

6

Page

\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet

of 6

Project File Location

proj file

Elec File Location

Checked

Rev

Date

By

rev2

date2

by2

chkd2

By

Calculation Sheet

Calc No

Phase/CTR

Proj No

11109

calc no

phase

Project Title

Calculation Title

MPN

20.2

date1

Date

rev3

date3

Rev

Checked

20.2

189

by3

rev1

chkd3

60

120

120

0.02778

84987

59491

0.7

269

84987

269

0.073043

0.95833

2424

(8)

Date

chkd3

Date

Checked

date1

by3

Rev

rev1

Rev

rev2

by1

By

By

Checked

date3

proj file

Checked

chkd2

chkd1

Date

By

date2

by2

rev3

Rev

Calc No

Phase/CTR

Proj No

11109

calc no

phase

Project Title

Oso-QIT Pipeline FEED Update Project

Slug Catcher Foundation Design

Customer

pages

Elec File Location

Page

\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet

Calculation Title

MPN

of

Project File Location

(9)

by2

chkd2

Calculation Title

by1

Checked

date1

\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet

Elec File Location

rev2

Rev

rev1

Date

Project File Location

proj file

By

chkd1

Date

date2

By

of

pages

Phase/CTR

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.

chkd3

By

by3

Date

date3

Checked

rev3

Calculation Sheet

11109

Calc No

Customer

Project Title

Proj No

calc no

phase

Page

Oso-QIT Pipeline FEED Update Project

MPN

Slug Catcher Foundation Design

Rev

Checked

(10)

Project File Location

date2

Date

date3

Rev

By

rev2

by2

chkd2

rev1

date1

by1

chkd1

rev3

11109

Slug Catcher Foundation Design

Calc No

calc no

Oso-QIT Pipeline FEED Update Project

phase

Customer

Project Title

Proj No

MPN

Phase/CTR

Checked

chkd3

Page

of

Checked

By

by3

Date

Date

proj file

Rev

Calculation Title

Elec File Location

\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet

pages

Checked

By

(11)

By

by3

Checked

chkd3

Revision

rev3

Date

date3

By

by2

Checked

chkd2

Revision

rev2

Date

date2

by1

Checked

chkd1

Revision

rev1

Date

date1

Elec File Location

Page

Project File Location

proj file

By

Oso-QIT Pipeline FEED Update Project

Calculation Sheet

\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet

Proj No

11109

Calculation Title

of

pages

Customer

MPN

Phase/CTR

phase

Slug Catcher Foundation Design

Calc No

calc no

(12)

Slug Catcher Foundation Design

Project File Location

By

11109

calc no

phase

Date

of

pages

Customer

\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet

Elec File Location

Oso-QIT Pipeline FEED Update Project

MPN

proj file

Revision

rev1

Date

date1

Calculation Title

Project Title

Proj No

Calc No

Phase/CTR

Revision

rev2

Date

Page

By

by3

date2

by1

Checked

chkd1

Revision

rev3

Checked

chkd3

date3

By

by2

Checked

chkd2

(13)

This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This

Project File Location

proj file

Appendix A

pages

By

Rev

Date

of

Checked

11109

calc no

phase

\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet

MPN

Oso-QIT Pipeline FEED Update Project

Slug Catcher Foundation Design

Page

By

Rev

Date

Project Title

Calculation Title

Checked

Date

By

Elec File Location

chkd3

Calculation Sheet

Calc No

Phase/CTR

Proj No

Checked

Rev

chkd1

chkd2

by3

Customer

date2

by2

rev3

date3

References

Related documents