Proj No
Calc No
Phase/CTR
Page
1
6
pages
rev3
by3
rev2
by2
rev1
by1
Rev
Date
By
Conclusions
date2
1. ACI 318-11 (Building Code Requirement for Structural Concrete)
desc1
This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective
employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.
Description
desc2
app1
app3
date1
Checked
Title
desc3
Version
Validation (Y / N / N/A)
date3
Microsoft Excel
2010
11109
phase
Slug Catcher Foundation Design
calc no
Elec File Location
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Calculation Title
Project Title
Assumptions
References
To design a suitable foundation base and pedestal for the pig launcher
Project File Location proj file
Software Used
Calculation Objective
Calculation Cover Sheet
Calculation Method
Customer
Oso-QIT Pipeline FEED Update Project
MPN
Approved
app2
chkd2
chkd1
chkd3
Note: to create a new line
within a cell, press
Alt+Enter.
Section
Description
General
Disclaimer wording modified
General
Project and calc information created as named fields
Checklist
Added checkboxes regarding signoffs and date formats. Modified units checkbox to
include unit conversions. (per PI#4508)
Proj No
Calc No
Phase/CTR
Page
2
of 6
pages
Alternative method calculation and/or representative check performed and filed, as required.
rev3
by3
rev2
by2
rev1
by1
Rev
By
This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This
Input data correct.
Appropriate cross-references.
Changes clouded.
Description
Date
Calculation tolerances stated if significant.
Checked
Approved
Dates in standard format (DD-MMM-YY)
Calculations:
Customer
phase
calc no
11109
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Calculation Title
Oso-QIT Pipeline FEED Update Project
app1
chkd1
desc1
Calculation re-checked if required.
For software based calculations, reference to software verification if available.
Project File Location
Table of Contents.
proj file
Project title shown.
Please check boxes for all applicable items checked or mark as "N/A" if not appropriate:
date1
Elec File Location
Project Title
Revision history block updated.
Reference made to text, standard or code. Check version/edition with that required for project.
Calculation title shown.
Summary of results or conclusions if appropriate.
app2
chkd2
Source of input data stated (with revision number and date if relevant).
desc2
Abbreviations correct.
Calculation arithmetically correct OR software previously verified and reference to verification checked.
Revisions:
Checked and annotated copy of calculation filed (use "Check Print" stamp).
Calculation Checklist
Assumptions stated.
Customer's requirements included/addressed.
Method clear and easy to follow.
Approach used is appropriate for problem being solved.
chkd3
Appropriate stamp for preliminary issues.
Calculation objectives (aims) stated.
Units used as required by customer. Unit conversions correctly performed.
Calculation result within expected limits.
MPN
Slug Catcher Foundation Design
Revision history box complete and signed.
Calculation method defined or described (including formulae if relevant).
Calculation number assigned and registered (refer to project numbering system or Document Numbering System
EPP-0040 for format).
app3
Appendices included and referenced, as required.
Corrections made as required and calculation dated and signed on cover sheet by checker.
Checking Records:
Sketches included and clearly labelled, where required.
date2
Document Sign-offs (typed full names of Originator, Checker, Approver; to be initialed beside at sign-off)
Considered design reviews, Hazop actions, client input, safety and environmental issues, etc.
1
Calculation cover sheet
1
2
Calculation checklist
2
3
Calculation sheets
3 -
6
Elec File Location
Proj No
Phase/CTR
Calc No
Customer
Calculation Title
Project Title
calc no
11109
Oso-QIT Pipeline FEED Update Project
By
Date
By
Checked
Project File Location
Rev
Checked
proj file
Rev
Table of Contents
by2
rev3
Date
chkd1
chkd2
chkd3
Checked
date3
pages
phase
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Slug Catcher Foundation Design
Page
3
of 6
MPN
Rev
by3
Date
By
Weight of slug catcher
=
lbs
=
kips
Length of pig launcher
=
13.2 ft
Bearing pressure
=
2000
psf
=
2 ksf
Distance between supports
=
6.2 ft
kips
26.3 ft
Ra
=
kips
Rb
=
kips
f'c
=
4 ksi
fy
=
60 ksi
Critical plane
Dead load, D
=
kips
k
Cover
=
2 in
ft
Bar diameter
=
in
3 ft
ft
ft
ACI318-11
Design
Procedure
Calculation
Section
Aid
Sizing the footing
Ignoring the self weight of the footing
D/a
=
sq.ft
Use
x
ft
Area
=
sq.ft >
sq.ft
OK
Required strength
U
=
1.4 D
U
=
k
or
ksf
Design for shear
Ф shear
=
9.3.2.3
Assume Vs = 0 (no shear reinforcement)
Ф Vn
=
Ф Vc
11.1.1
One way shear action
bw
=
in
d
=
# in
h
=
in
Vc
=
2 (f'c)^½ bw d
11.3.1.1
Ф Vc
=
kips
Vu
=
B x[(L/2) - ((b/2) + d)/12)] x U
Vu
=
11.12.1.1
20.2
10
20.2
377,150
377
377
12
ft
188.6
188.6
10
20
120
245
94.29
9.2
264
2.2
0.75
by2
chkd2
rev3
date3
by3
chkd3
rev1
date1
by1
chkd1
rev2
date2
By
Checked
Rev
Date
By
Checked
Rev
Date
By
Checked
Rev
Date
Project File Location
proj file
Page
4
of 6 pages
Calculation Title
Slug Catcher Foundation Design
Phase/CTR
phase
Elec File Location
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Calculation Sheet
Customer
MPN
Proj No
11109
Project Title
Oso-QIT Pipeline FEED Update Project
Calc No
calc no
188.6
0.05
188.6
54.9
12
12
10.0
94.29
144
20
ACI318-11
Design
Procedure
Calculation
Section
Aid
Ф Vn
=
Ф Vc > Vu
OK
Calculate moment at
Mu
=
U x critical plane distance x l/2
15.4.2
pedestal face
kip-ft
Compute flexural
Ф kn
=
Mu (12000) / bd2
tension reinforcement
=
psi
(bottom bars)
for Ф kn =
psi, select ρ =
%
Flexure 1
Area of steel, As
=
ρbd
=
in2
Check for As,min
=
0.0018bh
10.5.4
As,min
=
in2
As,min < As
OK
Use 23 no of #4 (0.5'') bars distributed uniformly
across the entire 8ft width of the footing @
8'' c/c
Use 12 no of #4 (0.5'') bars distributed uniformly
across the entire 15ft width of the footing @
8'' c/c
ft
19- #401 - 8'' U. BAR
16 - #402 - 8'' U. BAR
12
10 ft
20.2
1.45
4.32
Customer
MPN
Proj No
11109
Project Title
Oso-QIT Pipeline FEED Update Project
Calc No
calc no
Calculation Title
Slug Catcher Foundation Design
Phase/CTR
phase
Elec File Location
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Project File Location
proj file
Page
5
of 6 pages
Checked
Rev
Date
By
Checked
Rev
Date
By
Checked
Rev
Date
By
31.2
date1
by1
chkd1
rev2
date2
425.080
425.080
1370
7.12
by2
chkd2
rev3
date3
by3
chkd3
Loading
Ultimate load, Pu
=
kips
(Weight of Slug catcher)
Ultimate moment, Mu
=
kip-in
Assume ϕ
=
Nominal axial load
=
kips
Nominal moment
=
kip-in
Material
f'c
=
4 ksi
fy
=
ksi
Column size
h
=
in
b
=
in
ACI318-11
Design
Procedure
Calculation
Section
Aid
Determine reinforcement
Pn
=
kips
ration ρg using known
Mn
=
kip-in
values of variables on
h
=
in
appropriate interaction
b
=
in
daigram(s) and compute
Ag
=
b x h
=
in2
required cross section
area Ast of longitudinal
reinforcement
A. Compute Kn=Pn/(f'cAg)
Kn
=
B. Compute Rn=Mn/(f'cAgh)
Rn
=
C. Compute ϒ ≈ (h-5)/h
ϒ
=
D. Determine the
appropriate interaction
For a rectangular tied column with bars along
diagram(s)
four faces f'c = 4ksi, fy = 60ksi and an
estaimated ϒ of 0.90, use R4-60.9
10.2 &10.3
Columns 3.2.4
(R4-60.9)
E. Read ρg for Kn and Rn
Provide nominal reinforcements
values from appropriate
interaction diagrams
Pedestal Design
Customer
Oso-QIT Pipeline FEED Update Project
Rev
chkd1
Date
By
by1
Checked
pages
6
Page
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
of 6
Project File Location
proj file
Elec File Location
Checked
Rev
Date
By
rev2
date2
by2
chkd2
By
Calculation Sheet
Calc No
Phase/CTR
Proj No
11109
calc no
phase
Project Title
Calculation Title
MPN
20.2
date1
Date
rev3
date3
Rev
Checked
20.2
189
by3
rev1
chkd3
60
120
120
0.02778
84987
59491
0.7
269
84987
269
0.073043
0.95833
2424
Date
chkd3
Date
Checked
date1
by3
Rev
rev1
Rev
rev2
by1
By
By
Checked
date3
proj file
Checked
chkd2
chkd1
Date
By
date2
by2
rev3
Rev
Calc No
Phase/CTR
Proj No
11109
calc no
phase
Project Title
Oso-QIT Pipeline FEED Update Project
Slug Catcher Foundation Design
Customer
pages
Elec File Location
Page
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Calculation Title
MPN
of
Project File Location
by2
chkd2
Calculation Title
by1
Checked
date1
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Elec File Location
rev2
Rev
rev1
Date
Project File Location
proj file
By
chkd1
Date
date2
By
of
pages
Phase/CTR
This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This Calculation is confidential and prepared solely for the use of the Customer. The contents of this Calculation may not be disclosed to or relied upon by any party other than the Customer, and neither DeltaAfrik , its subconsultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any other party for any information or representation herein.
chkd3
By
by3
Date
date3
Checked
rev3
Calculation Sheet
11109
Calc No
Customer
Project Title
Proj No
calc no
phase
Page
Oso-QIT Pipeline FEED Update Project
MPN
Slug Catcher Foundation Design
Rev
Checked
Project File Location
date2
Date
date3
Rev
By
rev2
by2
chkd2
rev1
date1
by1
chkd1
rev3
11109
Slug Catcher Foundation Design
Calc No
calc no
Oso-QIT Pipeline FEED Update Project
phase
Customer
Project Title
Proj No
MPN
Phase/CTR
Checked
chkd3
Page
of
Checked
By
by3
Date
Date
proj file
Rev
Calculation Title
Elec File Location
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
pages
Checked
By
By
by3
Checked
chkd3
Revision
rev3
Date
date3
By
by2
Checked
chkd2
Revision
rev2
Date
date2
by1
Checked
chkd1
Revision
rev1
Date
date1
Elec File Location
Page
Project File Location
proj file
By
Oso-QIT Pipeline FEED Update Project
Calculation Sheet
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Proj No
11109
Calculation Title
of
pages
Customer
MPN
Phase/CTR
phase
Slug Catcher Foundation Design
Calc No
calc no
Slug Catcher Foundation Design
Project File Location
By
11109
calc no
phase
Date
of
pages
Customer
\\vboxsrv\conversion_tmp\scratch_5\[164800554.xls.ms_office.xls]Calculation Cover Sheet
Elec File Location
Oso-QIT Pipeline FEED Update Project
MPN
proj file
Revision
rev1
Date
date1
Calculation Title
Project Title
Proj No
Calc No
Phase/CTR
Revision
rev2
Date
Page
By
by3
date2
by1
Checked
chkd1
Revision
rev3
Checked
chkd3
date3
By
by2
Checked
chkd2
This Calculation represents the work of DeltaAfrik performed to recognized engineering principles and practices appropriate for the terms of reference provided by DeltaAfrik contractual Customer. This