This Section of the Draft EIS evaluates the potential for the Project to impact Palm Springs Unified School District (PSUSD) school services and facilities. See Section 9.0 for definitions of terms, definitions, and acronyms used in this Draft EIS.

A.

ENVIRONMENTAL SETTING

1.

Existing Conditions

The Project Site is located within the attendance boundaries of the PSUSD, which covers the communities of Cathedral City, Desert Hot Springs, Palm Desert, Palm Springs, Rancho Mirage (“City”), and Thousand Palms. The PSUSD facilities include 17 elementary schools with grades K–5; five (5) middle schools with grades 6–8; four (4) high schools with grades 9–12; and six (6) alternative schools, which include an adult school, a virtual school, a training school, and an alternative education center.1

PSUSD had a total enrollment of 23,360 students in the 2013–2014 school year.2 Of this total

enrollment, approximately 47 percent of PSUSD students were enrolled in elementary schools (grades K–5), approximately 23 percent were enrolled in middle school (grades 6–8), approximately 30 percent were enrolled in high school (grades 9–12), and a negligible percent were enrolled in alternative schools.3

Specifically, the Project Site falls within the attendance boundaries of Sunny Sands Elementary, located at 69-310 McCallum Way (2.5 miles northwest of the Project Site); Nellie N. Coffman Middle, located at 34-603 Plumbley Road (2.0 miles southwest of the Project Site); and Rancho Mirage High, located at 31001 Rattler Road (0.5 miles northwest of the Project Site), as shown in Figure 5.12-1, Public Services

Within Proximity to Project Site.4

According to the most recent data obtained from PSUSD, the current capacity for Sunny Sands Elementary is 1,235 students, Nellie N. Coffman Middle is 1,607 students, and Rancho Mirage High is 2,400 students.5

During the 2013–2014 school year, Sunny Sands Elementary had an enrollment of 974 students, Nellie N. Coffman Middle had an enrollment of 1,135 students, and Rancho Mirage High had an enrollment of

1 Palm Springs Unified School District, “Schools” (May 2014), http://www.psusd.us/.

2 California Department of Education, Educational Demographics Unit, “DataQuest, Enrollment Report.” 3 California Department of Education, Educational Demographics Unit, “DataQuest, Enrollment Report.” 4 Delia A. Diaz, Palm Springs Unified School District, letter correspondence, May 22, 2014.

(2)

818 students. As shown in Table 5.12.3-1, PSUSD School Capacities and Current Enrollment, none of the schools that would serve the Project Site are currently operating over capacity when compared with current enrollment.

Table 5.12.3-1

PSUSD School Capacities and Current Enrollment

School Name Location Current Enrollment Current Capacity Elementary School

Sunny Sands Elementary 69-310 Mccallum Way 974 1,235

Middle School

Nellie N Coffman Middle 34603 Plumley Road 1,135 1,607

High School

Rancho Mirage High 31001 Rattler Road 818 2,400

Source: Delia A. Diaz, Palm Springs Unified School District, letter correspondence, May 22, 2014.

2.

Regulatory Setting

State

California Department of Education

The California Department of Education (CDE) has traditionally been responsible for the funding of local public schools. To assist in providing facilities to serve students generated by new development projects, the legislature passed California State Assembly Bill (AB) 2926 in 1986, which allowed districts to collect impact fees from developers of new residential and commercial/industrial building space. The California Education Code provides that the governing board of any school district is authorized to levy a fee, charge, dedication, or other requirement against any construction within the boundaries of the district, for the purpose of funding the construction or reconstruction of school facilities.

Senate Bill (SB) 50 was passed in California in 1998. This legislation established that school districts are allowed to collect impact fees from developers of new construction as a source of funding to offset associated impacts to school services. These development fees are derived based upon square footage of different land uses and are determined based on three levels of funding.

This Project will comply with SB 50 in order to offset associated impacts to school services by development within the Project Site.

(3)

Regional and Local

Rancho Mirage General Plan

The Public Services and Facilities Element of the City’s General Plan includes policies related to school services and facilities.6 This Element identifies the basic need for the City to support and provide

educational opportunities within the community. These services are to be accessible to any person of the public, regardless of age, in order to further their personal and professional horizons. The City’s ability to provide school services is based upon effective land use, circulation, and safety design. Therefore, any additional development can affect the City’s capability to provide these services.

Rancho Mirage Municipal Code

New construction within the City of Rancho Mirage is subject to Title 3 of the Rancho Mirage Municipal Code, which sets policy for the requirement of development fees on new construction as a measure to fund local schools.7

B.

ENVIRONMENTAL IMPACTS

1.

Thresholds of Significance

In order to assist in determining whether a project would have a significant effect on the environment, the Tribe finds a project may be deemed to have significant impacts on public services, including schools, if it would:

Threshold 5.12.3-1 Result in substantial adverse physical impacts associated with the provisions of new or physically altered school facilities, need for new or physically altered school facilities, the construction of which could cause significant environmental impacts, in order to maintain performance objectives for school services.

2.

Methodology

Future student populations were determined using standard generation rates provided by PSUSD. These generation rates allow forecasting of the number of students in elementary, middle, and high school that would be generated by a project.

6 City of Rancho Mirage General Plan, “Public Services and Facilities Element,” 1997. 7 City of Rancho Mirage, “Municipal Code,” http://www.qcode.us/codes/ranchomirage/.

(4)

Due to the nature of the Active Adult Community being an age-restricted community (55 years of age and greater), those residents are not anticipated to produce any children. Therefore, for the purposes of this impact analysis, it will be assumed that the Active Adult Community would not generate any additional students within the PSUSD boundaries.

3.

Project Design Features

The Project does not include any features specifically related to schools.

4.

Project Impacts

Result in substantial adverse physical impacts that would affect acceptable

school enrollment capacities of the area

Active Adult Community

As discussed in Section B.2, Methodology, the Active Adult Community is not anticipated to generate any additional students within the PSUSD. Sunny Sands Elementary, Nellie N. Coffman Middle, and Rancho Mirage High would not be impacted as a result of development of the Active Adult Community. Accordingly, impacts would be less than significant.

Tribal Planning Areas

The Tribal Planning Areas would develop up to 1,206 multi-family attached residential dwelling units as well as commercial, office, mixed-retail, and resort uses. The multi-family residential units are anticipated to generate additional students that would utilize PSUSD facilities. As shown in Table

5.12.3-2, Student Generation Table, the Tribal Planning Areas would generate approximately 98 students’

grades K–5, 42 students’ grades 6–8, and 49 students’ grades 9–12 for a total of 192 students.

The Tribal Planning Areas would add 99 students to Sunny Sands Elementary for a projected enrollment of 1,073 students which would be below the operating capacity of 1,235 students; would add 43 students to Nellie N Coffman Middle School for a projected enrollment of 1,178 students which would be below the operating capacity of 1,607 students; and would add 50 students to Rancho Mirage High School for a projected enrollment of 868 students which is below the operating capacity of 2,400 students. All three of these schools are currently operating below their capacities and would continue to operate below capacity with the addition of the students generated by the Tribal Planning Areas.

The development of additional facilities as a result of implementation of the Project would not be required. Potential school impacts would be considered to be less than significant.

(5)

Table 5.12.3-2 Student Generation Table

Grade

Levels (Multi-Family Attached Units) PSUSD Generation Rates Proposed Students

K-5 0.0816 99

6-8 0.0349 43

9-12 0.0410 50

Total Students 192

Source: Delia A. Diaz, Palm Springs Unified School District, letter correspondence, May 22, 2014.

Individual project proponents will be required to pay applicable development fees to PSUSD to ensure that school facilities are not adversely impacted, as identified in Mitigation Measure MM 5.12.3-1. Accordingly, impacts would be less than significant.

5.

Cumulative Impacts

Related projects within the PSUSD, in accordance with build-out of local jurisdiction General Plan’s, could contribute to a potentially significant adverse cumulative impact on school facilities and services. Development projects within PSUSD are required to pay established school impact fees in accordance with SB 50 to minimize impacts to the school system. PSUSD considers payment of the school impact fees to be adequate mitigation to offset impacts to PSUSD’s facilities and services. In addition, the PSUSD schools in the Project vicinity are operating well below capacity. Therefore, cumulative impacts would be less than significant.

C.

MITIGATION MEASURES

The following Mitigation Measure would reduce impacts on the PSUSD:

MM 5.12.3-1 Prior to the issuance of building permits, individual project proponents shall pay

applicable development fees to PSUSD.

D.

LEVEL OF SIGNIFICANCE AFTER MITIGATION

Mitigation Measure MM 5.12.3-1 would reduce potential impacts associated with school facilities and services to be less than significant. Cumulative impacts would also result in less than significant impacts to school services. With regard to the Active Adult Community, the Project would be net beneficial in generating additional fees from a project that should not contribute any additional students.

Figure

Table 5.12.3-2  Student Generation Table   Grade

References

Related documents

Redoubt Elementary Smart Start Plan 2020 – Revised 1/5/2021 • Students may only bring materials that are deemed essential to safety..

32% of the students at Numa Elementary School in 1 st – 6 th grade did not make their individual academic growth rates in Math as per MAP?. Numa Elementary School has not

• Three other elementary schools are forecast to have moderate enrollment gains of 34 to 40 students (10 to 15 percent) in the next five years. They are Dilley, Cornelius, and

10-19 students: 67% of classes 20-29 students: 11% of classes 30-39 students: 1% of classes 40-49 students: 1% of classes 50-99 students: 1% of classes. Discussion Section/Lab

When breakfast participation by elementary and secondary students was compared after the implementation of universal free was calculated as a percentage of total enrollment at

In general, the school reports show that students received singing classes in those grades that the law prescribed (1-4 in elementary, 1-6 in city schools, and 1-8 in

Enrollment Projection Analysis: Over the next three years, K-2 enrollments are forecast to decrease by a total of -33 students, Grades 3-5 enrollments are projected to increase by

(New Students = you have the 3.0+ GPA and the test scores already completed and available) Step 1: NEW Students, please email your counselor that you are NEW to Dual Enrollment and