• No results found

Appropriate urban livability indicators for metropolitan Johor, Malaysia via expert-stakeholder approach: a Delphi technique

N/A
N/A
Protected

Academic year: 2020

Share "Appropriate urban livability indicators for metropolitan Johor, Malaysia via expert-stakeholder approach: a Delphi technique"

Copied!
25
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1. Comparative Percentage Scores of Sub-indicators
Table 2. Mode, Mean Rating and Rank of Domain Indicators in Round 2
Table 3. Rank and weightings of sub-indicators under the domain indicators Urban Infrastructure and Services, and Urban Services, Recreation and Accommodation Facilities
Table 4. Rank and weightings of sub-indicators under the domain indicators Climate Resiliency and Disaster Preparedness, and Protection of Urban Environmental Resources
+5

References

Related documents

Waterproof White LED Strip Light Remote control allows colour blending and selection Waterproof RGB LED

Press up slightly inwards against that card and push it out, at same time releasing little finger and holding deck firmly between second finger and palm-

• Citation Potential (CP) – prosječan broj referenci (citata) u zadanom razdoblju u radovima koji citiraju određeni časopis. • citatni potencijal varira između

In a binary choice panel data model with individual effects and two time periods, Manski (1987) proposed the maximum score estimator, based on a discontinuous objective function,

The literature lacks fully realized portraits of teachers’ professional visions for science and engineering instruction in elementary classrooms, the dilemmas teachers encounter

For instance, a company may upgrade its business intelligence infrastructure to an enterprise grid architecture for storage and servers (Figure 6), then apply the same method to

Accepted manuscript: Argyroudis SA, Mitoulis SA, Hofer L, Zanini MA, Tubaldi E, Frangopol DM (2020). Resilience assessment The latter statement is also valid for the case where

The design of the onboard process facilities described above is to include an overall evaluation of the proposed concept with a view toward reducing the likelihood of the occurrence