• No results found

Thermal comfort survey in office buildings in Bandung, Indonesia

N/A
N/A
Protected

Academic year: 2020

Share "Thermal comfort survey in office buildings in Bandung, Indonesia"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1 Investigated buildings
Table 2 Scale and translation
Table 3 Average value of objective and subjective evaluation
Table 5 Equation of probit analysis using globe temperature on TSV
+5

References

Related documents

Redundant capacity and power paths simultaneously serving the IT equipment (minimum of N+1 systems) Tier Tier I Tier II Tier III Tier IV Cost $1.0x $1.1x $2.0x $2.2x Downtime

Choice for frequency above 2-3 THz need cryogenic cooling; frequency stability; limited bandwidth; limited lifetime Better frequency control; Tunable cavities; improved

Statik analizde API 1500-0-1, dinamik analizde API 1500-20-1-D olarak adlandırılan bu rayserin verileri kullanılarak bulunan sonuçlar, enstitünün test için sunduğu, dokuz

This document's predecessor was "MarketScope for Enterprise Search." In switching to a Magic Quadrant, we have added Dassault Systemes, which has acquired Exalead;

Early Impacts of Humans on Climate 326 16-6 Did Humans Cause

The draft WiredWest operating agreement says that member towns are not permitted to withdraw from the cooperative for 10 years, allowing time to complete the buildout and

Dále charakterizuji vybrané druhy nestátních neziskových organizací a jejich vztah k podnikání, tedy zda mohou provozovat podnikatelskou č innost nebo ji mají

Also recall from section 2.2 that as long as the conditional deployment profile is the future generation’s best response, the current generation will find it optimal to stick to