Minutes of 14th Consent Appraisal Committee Meeting of 2015-2016 held on 02.02.2016 at 2.30 p.m. at 2nd floor, Mantralaya
Annexe, Mumbai-400 032.
……….
The Consent Appraisal Committee meeting of the Board was held on 02.02.2016. Following members of the Consent Appraisal Committee were present:
1. Smt. Malini Shankar, Chairperson Addl. Chief Secretary, Environment Dept.,
Government of Maharashtra and Chairperson, MPCB, Mumbai.
2. Shri. Dr. P. Anbalagan Member Member Secretary, MPC Board, Mumbai
3. Shri. P. P. Nandushekhar, Member Technical Advisor (environment), MIDC, Mumbai
Shri. Gautam Chatterjee, Additional Chief Secretary, Home (Transport) Dept., Mumbai, Shri. Rakesh Kumar, Scientist & Head, NEERI, Mumbai & Shri. P. K. Mirashe, Assistant Secretary (Technical), MPC Board, Mumbai could not attend the meeting. Leave of absence was granted to them.
Following Officer of MPCB were present for the meeting:
1. Shri. Y. B. Sontakke, Joint Director (WPC), MPCB, Mumbai Special Invitee 2. Shri. V. M. Motghare (Joint Director (APC), MPCB, Mumbai Special Invitee 3. Technical Advisor, MPCB, Mumbai,
The meeting thereafter deliberated on the fresh agenda items (Book-let no 31 (Part-I & II) & 32 (Part-I, II, III & IV) & 33) placed before the committee and following decisions were taken.
14th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 2 of 32
No. Name of Industry grant of
consent granted up to
Remarks/Discussion (1)
Booklet No. 32 (Part - III)
Fresh cases (Industry)
91 Uttam Value Steels Ltd. ( Cold Rolled Unit)., Bhugaon Link Road, Tal & Dist Wardha
Approved Renewal with
increase e in CI
28.02.2020 It was decided to grant renewal of consent with increase in capital investment by imposing following conditions.
1. Industry shall submit BG of Rs. 10 lakhs towards O&M of pollution control system.
Consent shall be issued after submission of requisite consent fee. 92 Hindustan Platinum
Pvt. Ltd., TTC
Industrial, Navi Mumbai
Approved Renewal of consent to operate of two consents and their amalgamation
30.04.2018 It was decided to grant renewal of consent to operate of two consents and their amalgamation with increased CI by imposing following conditions.
1. Industry shall extend the existing BG of Rs. 5 lakhs towards O&M of pollution control system .
2. Industry shall extend the existing BG of Rs. 2 lakh towards carryingout the performance audit of air pollution control equipments from renowned institute like NEERI or IIT.
3. The consent is issued as per the letter issued by CPCB to the industry dated 23.12.2015 regarding issuance of consent to operate for enhanced capacity.
Consent shall be issued after submission of requisite consent fee. 93 Mahindra & Mahindra
Ltd. (Tractor Div.), Akurli Road, Kandivali, Mumbai Approved Renewal of consent to operate (increase in CI)
30.09.2020 It was decided to grant renewal of consent to operate with increased CI by imposing following conditions.
1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards O&M of pollution control system.
Consent shall be issued after submission of requisite consent fee.
94 Epcos India Pvt. Ltd.,Plot. No. E - 22/25 MIDC Satpur, Dist - Nashik. Approved Amendment in Existing consent to operate
28.02.2017 It was decided to grant amendment in existing consent for replacement of DG sets with capacity 600 & 380 KVA to 1010 & 100 KVA respectively with following conditions;
1. All other conditions in the existing consent shall remain unchanged.
95 JSW Steel Coated Products Ltd., 176, 180/1/2/3/4/5/6/7/8/9/1 0, 271, 272, 273, Vashind, Tal Shahapur, Dist Thane Approved Renewal of consent to operate with increase in CI
28.02.2021 It was decided to grant Renewal of consent with increase in by imposing following conditions;
1. Industry shall send spent HCL acid to authorized Acid recovery plant in case of their ARP shutdown or operational problems. 2. Addition of stacks-4 Nos. for Galvanizing section, 2 Nos. for
Thermopacks and include 4 Nos. waste heat recover boilers. 3. Industry to extend the existing BG of Rs. 10/- Lakhs for O & M
of pollution control systems.
It was decided to return back the BG of Rs. 2/- Lakhs obtained against increase of stack height as the industry has complied the same
Consent shall be issued after submission of requisite consent fee. 96 Endurance
Technologies Pvt. Ltd., (Disc Brake Division), K-226/2. MIDC Waluj, Aurangabad Approved Renewal of consent to operate with increase in CI
28.02.2020 It was decided to grant renewal of consent to operate with increase in capital investment by imposing following conditions; 1. Industry shall extend the existing BG of Rs. 5/- Lakhs towards
14th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 4 of 32
Consent shall be issued after submission of requisite consent fees
97 Ultratech Cement Ltd., Unit 1 & 2, Hotgi Cement works, Near Hotgi Railway station, At Hotgi, Tal South Solapur, Dist Solapur.
Approved Renewal of
consent to operate with increase in CI
31.10.2020 It was decided to grant Renewal of consent to operate with increase in CI by imposing following conditions;
1. BG of Rs. 5/- Lakhs from BG of Rs. 10/- Lakhs obtained for O & M of pollution control systems to be forfeited & top up BG of Rs. 10/- Lakhs to be submitted to make total BG of Rs. 15/- Lakhs for O & M of pollution control systems (source).
2. Industry to submit fresh BG of Rs. 5/- Lakhs towards control of fugitive emissions.
Consent shall be issued after submission of requisite consent fees 98 RSB Transmission (I)
Ltd., Gat No. 908 Nagar Road, Village Sanaswadi, Tal Shirur, Dist Pune Approved Renewal of consent to operate with increase in CI
28.02.2021 It was decided to grant Renewal of consent to operate with increase in CI by imposing following conditions;
1. Industry is allowed to operate for 24 hrs as SRO has reported compliance of ID issued by the Board.
2. BG’s of Rs. 3/- Lakhs, Rs. 5/- lakhs & Rs. 2/- Lakhs obtained for compliance of ID may be released as SRO has reported compliance of the same.
3. Industry to submit BG of Rs. 5/- Lakhs for compliance of noise limit at night time.
4. BG of Rs. 5/- Lakhs obtained against O & M of pollution control systems shall be forfeited as stack, ambient & JVS reports are exceeding the consented limit & obtain top up BG of Rs. 10/- Lakhs for O & M of pollution control systems.
99 Perkins India Pvt. Ltd., G-1, Additional Shendra, Aurangabad Approved Renewal of consent to operate (decrease in CI)
30.09.2020 It was decided to grant renewal of consent to operate with decreased CI and water budget as per consent by imposing following conditions.
1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards O&M of pollution control system.
Consent shall be issued after submission of requisite consent fee. 100 Elringklinger Automotive, G-2, MIDC Ranjangaon, Pune Approved Renewal of consent to operate (increase in CI)
30.04.2020 It was decided to grant renewal of consent to operate with increased CI & water budget, Fuel quantity, HW & Non-HW quantity by imposing following conditions
1. Industry shall submit the fresh BG of Rs. 10 lakh towards O&M of pollution control system and return the existing BG of Rs. 5 lakh as BG was not valid.
2. Industry shall upgrade the existing STP of adequate capacity to treat the domestic effluent so as to achieve the consented standards within 03 months and submit the BG of Rs. 5 lakh towards compliance of the same.
Consent shall be issued after submission of requisite consent fee. 101 Cipla Ltd., MIDC, Kurkumbh, Pune Approved Renewal of consent to operate
30.04.2020 It was decided to grant renewal of consent to operate by imposing following conditions:
1. Industry shall submit the BG of Rs 5 lakh for O & M of Pollution Control System.
2. Industry shall carryout hazardous waste audit from renowned institute such as NEERI, IIT, ITC etc within a period of 3 months and submit a BG of 2 lakhs towards the same.
Consent shall be issued after submission of justification of increase in CI. and requisite consent fee.
14th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 6 of 32
102 Raymond UCO Denim Pvt. Ltd., C-1, MIDC Lohara, Yavatmal Approved 1st Consent to operate for expansion of new spin flash
dryer & 1st Consent to operate for expansion of captive power plant from 5 MW to 6 MW with renewal of consent to operate of unit C-1 & their amalgamation with Unit C-4 with increased CI
31.01.2019 It was decided to grant 1st Consent to operate for expansion of new spin flash dryer & 1st Consent to operate for expansion of captive power plant from 5 MW to 6 MW with renewal of consent to operate of unit C-1 & their amalgamation with Unit C-4 with increased CI by imposing textile BG regime and following conditions:-
1. This consent is issued with overriding effect over previous consent to operate issued by the Board vide consent no MPCB/15/025080 dated 04.03.2015.
2. Industry shall extend the BG of Rs. 10 lakhs towards Operation & Maintenance of the Effluent Treatment Plant to achieve disposal standards.
3. Industry shall extend the BG of Rs. 5 lakhs towards Operation and Maintenance of Air Pollution Control Devices to achieve emission standards.
4. Industry shall extend the BG of Rs. 2.25 lakhs towards compliance of Hazardous Waste as per the HW (M, H & TM) Rules, 2008 such as Storage (Proper Cover, leachate collection system, not exceeding 90 days storage etc), Mode of disposal, and maintaining records
Consent shall be issued after submission of requisite consent fee and letter of MIDC regarding amalgamation of plot no C-1 & C-4. 103 NOCIL Ltd, C-37,
MIDC TTC Indl area, Pawane village, NaviMumbai Approved Renewal of consent to operate (increase in CI)
28.02.2020 It was decided to grant renewal of consent to operate with increased CI by imposing following conditions.
1. Industry shall submit the BG of Rs 10 lakhs towards O & M of Pollution Control System.
Consent shall be issued after submission of requisite consent fee
104 Reliance Industries Ltd. (Polyester Div.), Plot No. B-4/5, Patlaganga Khalapur, Dist. Raigad
Approved Renewal of consent to
operate
30.11.2017 It was decided to grant renewal of consent to operate by imposing following conditions:
1. Forfeit BG of Rs 5 lakh obtained towards O & M of PCS as the JVS results are exceeding and top-up BG of RS 10 lakh towards O & M of PCS.
2. Industry shall submit BG of Rs 4 lakh towards submission of treatability study within 3 months
3. M/s REL-Polyester shall treat the effluent coming from M/s REL, LAB .
Consent shall be issued only after submission of BG’s as per decision of CAC and directions.
105 ITC Ltd., Plot No. B-27, MIDC Ranjangaon, Tal. Shirur, Dist. Pune.
Approved Renewal of Consent to Operate (increase in CI)
30.11.2021 It was decided to grant Renewal of Consent to Operate with increase in CI by imposing BG of Rs. 5 Lakh towards O & M of pollution control systems.
Consent shall be issued after obtaining additional Consent fees. 106 Castrol India Pvt Ltd, Patalganga, Raigad Approved Renewal of consent to operate
31.08.2020 It was decided to grant renewal of consent to operate by imposing following conditions.
1. Industry shall submit the BG of Rs 5 lakh towards O & M of Pollution Control System.
Consent shall be issued after submission of year-wise increment of CI and requisite consent fee.
14th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 8 of 32
107 JSW Steel Ltd., (Sinter Plant-I), Geetapuram, Dolvi, Tal Raigad
Approved Renewal of
consent to operate
31.12.2018 It was decided to grant Renewal of consent to operate by imposing following conditions:
1. Industry to extend the existing BG of Rs. 5/- Lakhs for O & M of pollution control systems.
2. This consent is issued without prejudice to the order passed or being passed in any legal proceedings subject to compliance of environmental norms & various statutory permissions as well as conditions stipulated in consent.
Consent shall be issued after obtaining addl requisite consent fees from the industry
108 Dow Agro Sciences, Plot No. A-1, MIDC Lote, Chiplun Approved Amendment in existing consent to operate
30.06.2016 It was decided to grant amendment in consent to operate for deletion of chloropyrifos technical and other two products and addition of three pesticide formulation product and by imposing following conditions:
1. Industry shall submit BG of Rs 5 lakh towards O & M of Pollution Control System.
2. SRO shall monitor the industry to check the water budget for four months and submit the report to CAC.
3. Consent is issued with the overriding effect of earlier consent granted by the Board dated 30.01.2012
Consent shall be issued after submission of requisite consent fee. 109 Glenmark Pharmaceuticals, Shendra, Aurangabad Approved Renewal of consent to operate
30.04.2020 It was decided to grant renewal of consent to operate by imposing following conditions:
1. Industry shall extend the BG of Rs. 5 lakh towards O & M. of pollution control system.
Consent shall be issued after submission of requisite consent fee. 110 BEL Optronic Devices
Ltd., EL-30, J Block, MIDC Bhosari, Pune
Approved Renewal of consent to operate (Increase in CI)
30.04.2020 It was decided to grant renewal of consent to operate with increased CI by imposing following conditions
1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards provision of 100% recycle/reuse of all treated trade effluent into the process.
Consent shall be issued after submission of requisite consent fee. 111 Bharat Bijlee Ltd., Plot
No 2, MIDC Airoli, Navi Mumbai Approved Renewal of consent to operate (Increase in CI)
30.04.2020 It was decided to grant renewal of consent to operate with increased CI by imposing following conditions.
1. Industry shall extend the existing BG of Rs. 8 lakh obtained towards O&M of pollution control system.
Consent shall be issued after submission of requisite consent fee. 112 Deepak Fertilizers &
Petrochemicals Corp, JNPT, Uran Approved Renewal of consent to operate (Increase in CI)
30.06.2020 It was decided to grant renewal of consent with increase in CI by imposing following conditions
1. Industry shall extend the BG of Rs 5 lakhs obtained towards O & M of Pollution Control System.
Consent shall be issued after submission of requisite consent fee. 113 Asahi India Glass Ltd,
T-7, Taloja. Approved Renewal of consent to operate (Increase in CI)
30.06.2020 It was decided to grant renewal of consent to operate with increased CI only for Energy efficient glasses = 3000 MT/M by imposing following conditions.
1. Industry shall extend the BG of Rs 5 lakhs towards O & M of Pollution Control System.
2. Industry shall obtain specific permission to restart the production of Float glasses = 15000 MT/M from the Board and
14th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 10 of 32
amend the consent accordingly.
Consent shall be issued after submission of requisite consent fee.
114 Lubrizol India Pvt. Ltd, Turbhe, Navi-Mumbai Approved Renewal of consent to operate (Increase in CI)
31.01.2020 It was decided to grant renewal of consent to operate with increased CI and by imposing following conditions:
1. Industry shall submit BG of Rs 5 lakhs towards O & M of Pollution Control System.
2. Industry shall submit Board Resolution from company Board within one month, towards increase in investment without obtaining consent from MPC Board thus violated the provisions of Environmental Laws and in future, they will not do such violations and submit the BG of Rs. 2 lakhs immediately towards compliance of the same.
3. Industry shall carry out detailed study within three months period by engaging reputed third party for control of VOC emissions from 300 tanks & submit BG of Rs.5 lakh towards
compliance of same. 4. Industry shall install separate STP for treatment of domestic
effluent & upgrade capacity of existing ETP as per trade effluent generation within 3 months and shall submit BG of Rs.
2 lakh each towards compliance of same. 5. Industry shall install in-house treatment within 3 months for
garbage by providing Biogas plant/ composting plant and shall submit BG of Rs. 2 lakh for the compliance of the same.
Consent shall be issued after the receipt of details of each product name/Chemical name & quantity and after submission of requisite consent fee.
115 USV Ltd, B-1/8, MIDC Lote Parshuram, Tal. Khed, Dist. Ratnagiri
Approved Renewal of consent to operate for plot
B-1/8 & Part B1/8 and amalgamation with plot B-8/1,B-9 (Increase in CI)
30.04.2020 It was decided to grant renewal of consent to operate for plot B-1/8 & Part BB-1/8 and amalgamation with plot B-8/1,B-9 by imposing following conditions:
1. Industry shall submit BG of Rs 5 lakhs towards O & M of Pollution Control System.
2. Industry, the byproduct generator, should ensure that all the vehicles used to transport by-product to the vendor industry to be fitted with web based GPS system to record the origin to destination position and shall self monitor the compliance and submit monthly report to the Board.
3. Industry shall obtain affidavit from vendors stating that the by-product purchased from PP is used as raw materials in their respective industries.
4. Industry shall submit BG of Rs 2 lakhs for the compliance of point no 2 & 3.
Request of the industry for permission to sale the solvents of 15000 MT/A as a by-product not considered. And obtain all technical detail and examine the possibility to reuse in the process by other industries.
Consent shall be issued after submission of requisite consent fee. 116 Forbes Co Ltd., (Engg.
Division), Saki Powai Road, Chandivali, Mumbai Approved Renewal of consent to operate (Increase in CI)
30.06.2020 It was decided to grant renewal of consent to operate with increased CI by imposing following conditions
1. Industry shall extend the BG of Rs. 5 lakh towards O&M of pollution control system.
2. Industry shall install adequate capacity of STP within 03 months and submit the BG of Rs. 5 lakh towards compliance of the same.
Consent shall be issued after submission of requisite consent fee. 117 Liberty Oil Mills LTd.,
Village Bamne, Tal. Shahapur, Dist. Palghar. Approved Renewal of consent to operate
31.03.2020 It was decided to grant Renewal of consent to operate with increase in C.I. by imposing following conditions -
1. Industry shall extend existing BG of Rs. 20 lakh submitted towards achievement zero discharge system.
14th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 12 of 32
(Increase in CI)
2. Industry shall upgrade APC system to achieve emission standards as per consent conditions and submit Bank Guarantee of Rs. 10 lakh towards compliance of the same. Consent shall be issued after obtaining additional Consent fees. 118 Mahindra & Mahindra
Ltd., P. No. 89, MIDC Satpur, Tal & Dist Nashik
Approved Renewal of consent with Increase in CI
30.09.2020 It was decided to grant renewal of consent to operate by imposing following conditions;
1. Industry shall extend the existing BG of Rs. 5/- Lakhs towards O & M of pollution control system.
Consent shall be issued after obtaining additional Consent fees.
119 Goodyear South Asia Tyres PVt. Ltd., H-18, MIDC, Waluj, Aurangabad Approved Renewal of consent to Operate (Increase in CI)
31.12.2020 It was decided to grant renewal of consent to operate by imposing following conditions;
1. Industry shall extend the existing BG of Rs. 5/- Lakhs towards O & M of pollution control system.
Consent shall be issued after obtaining additional Consent fees. 120 Hindustan Insecticides Ltd, Rasayani, Panvel Raigad Not approved Renewal of consent to operate with increase in CI
---- It was decided to issue SCN for refusal of consent to operate due to following reasons:
1. Industry has not installed online continuous monitoring system as per CPCB’s directions.
2. Industry has increased investment from Rs. 53.2 Cr to Rs.78.7 Crs without obtaining permission from board
3. JVS results of the sample collected on 30.07.2015 are exceeding the consented limits.
121 Gharda Chemicals Limited, Plot No. D-1/2 & B-1/7, Lote Parshuram MIDC, Approved Renewal of consent to operate
31.07.2020 It was decided to grant plain renewal of consent to operate after the receipt of additional fees by imposing following conditions:
1. Industry shall extend the BGs as per the previous consent upto 30.11.2020.
Taluka Khed, Dist -
Ratnagiri, 415722. Not Approved Amendment in
change in product-mix
2. Industry, the byproduct generator, should ensure that all the vehicles used to transport by-product to the vendor industry to be fitted with web based GPS system to record the origin to destination position and shall self monitor the compliance and submit monthly report to the Board.
3. Industry shall obtain affidavit from vendors stating that the by-product purchased from PP is used as raw materials in their respective industries.
4. Industry shall submit BG of Rs 2 lakhs for the compliance of point no 2 & 3
5. Industry shall transfer the effluent (125 CMD ) generated from the co-gen plot F1/1 for treatment by reverse osmosis installed on main plot D1/2, The permeate (100 CMD) generated will be sent back to the cogen plot F1/1 and reject (25 CMD) will be treated in ETP on main plot D1/2. Running of RO plant located on plot F1/1 will not be operated
Consent shall be issued after obtaining additional Consent fees. It was also decided not to approve amendment in change in product-mix and call the industry for presentation before MS alongwith all relevant information.
122 Skoda Auto India Pvt. Ltd., Plot No. A-1/1, MIDC Shendra, Aurangabad Approved Renewal of consent with increase in CI
30.09.2020 It was decided to grant renewal of consent to operate with increase in capital investment by imposing following conditions; 1. BG of Rs. 2/- Lakhs from BG of Rs. 5/- Lakhs obtained for O &
M of pollution control systems to be forfeited as JVS reports are exceeding the consented standards & top up BG of Rs. 4/- Lakhs to be obtained to make total BG of Rs. 7/- Lakhs for O & M of Pollution control systems.
Consent shall be issued after obtaining additional Consent fees.
14th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 14 of 32
123 Tata Steel Ltd., S-76, MIDC Tarapur, PO Boiser, Tal Palghar, Dist Thane
Approved Renewal of consent with increase in CI
28.02.2020 It was decided to grant renewal of consent to operate with increase in capital investment by imposing following conditions; 1. Industry shall extend the existing BG of Rs. 7.5/- Lakhs
towards O & M of pollution control system.
2. Request of the industry to increase in water consumption for industrial process as compared to existing consent is not considered as the industry is located in Tarapur MIDC where CETP is not performing.
Consent shall be issued after obtaining details of water consumption from SRO and requisite consent fees.
124 Tata Steel Ltd., A-6, MIDC Tarapur, PO Boisar, Thane Approved Renewal of consent with increase in CI
28.02.2020 It was decided to grant renewal of consent to operate with increase in capital investment by imposing following conditions; 1. Industry shall extend all the existing BG’s for period upto
30.06.2020 .
Consent shall be issued after obtaining additional Consent fees.
125 Excel Industries, Plot No. D-9, MIDC Lote, Tal. Khed, Dist. Ratnagiri Approved Amendment in existing consent to operate for change in product-mix
31.01.2018 It was decided to grant amendment in consent to operate for change in product mix as per MoEF circular dtd 14.12.2006 with overriding effect by imposing following conditions:
1. This consent is issued in accordance with MoEF, Govt of India circular dated December 14, 2006 stating that in cases of change of product-mix, changes in the quantities or the numbers of product may be allowed without E.C by the concerned SPCB provided such changes in the quantities of product are in the same category and are with the previously granted overall total limits.
2. This consent is granted on the basis of the proforma of no increase in pollution load submitted by the industry and certificate of “no increase in pollution load” dtd 16.09.2015 issued by ICT, Mumbai.
Consent shall be issued after submission of requisite consent fee.
126 Excel Industries Ltd., MIDC Dhatav, Tal. Roha, Dist. Raigad
Approved Renewal of
consent to operate (increase in CI)
31.01.2020 It was decided to grant renewal of consent to operate with increase in production quantity of PCl3 from 7200 TPA to 10000 TPA & corrections in HW details by imposing following conditions.
1. Industry shall extend the BG of Rs. 5 lakh towards O & M of
pollution control system. 2. Industry shall carry out Hazardous waste audit from recognized
institute and submit the report within three months time period. Industry shall submit BG of Rs.2 lakh towards compliance of same.
3. By-product recovered from the scrubbing of PCl3 shall be send to their Lote plant for further processing.
Consent shall be issued after submission of requisite consent fee. 127 Frigorifico Allana Ltd.,
Gat No. 74 to 88, Village Georai, Paithan Road, Dist. Aurangabad Approved Renewal of consent to operate (increase in CI)
31.10.2020. It was decided to grant of Renewal of consent to operate by imposing BG of Rs. 10 lakh towards O & M of pollution control systems. 128 Sudarshan Chemicals, Roha Approved Renewal of consent to operate
30.04.2020 It was decided to grant plain renewal of consent to operate by imposing following conditions
1. Industry shall submit the BG of Rs 10 lakhs towards O & M of Pollution Control System.
Consent shall be issued after obtaining latest balance sheet and submission of requisite consent fees.
14th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 16 of 32
130 Sun Pharmaceuticals Industries Ltd., Plot No. A-7,8 Ahmednagar Approved Renewal Of consent to operate with increased CI.
30.04.2020 It was decided to grant renewal of consent to operate by imposing following conditions
1. Industry shall submit the BG of Rs 5 lakhs towards O & M of Pollution Control System.
Consent shall be issued after submission of requisite consent fee. 131 D'decor Home Fabrics
Pvt. Ltd., Plot F-6/1, MIDC Bhoiser, Tarapur, Thane Approved Renewal of consent to operate (increase in CI)
31.01.2019 It was decided to grant plain renewal of consent to operate without increase in production quantity, water budget, fuel consumption and effluent quantity by imposing following conditions.
1. Industry shall extend the existing BG of Rs. 10 Lakh towards O&M of ETP system.
2. Industry shall extend the existing BG of Rs. 5 Lakh towards O&M of APC system.
3. Industry shall extend the existing BG of Rs. 2.25 Lakh towards compliance of HW Rules 2008.
It was decided to return the existing BG of Rs. 5 lakh & BG of Rs. 4 lakh obtained towards providing arrangement for treated effluent recycle& reuse at least 50% along with MEE and upgrade the existing APC system as industry has complied the same as reported by Field Officer in its visit report dated 24.08.2015. It was also decided to return the BG of Rs. 2 lakh obtained towards submission of Board Resolution after verification report of SRO.
Consent shall be issued after submission of requisite consent fee.
Fresh
132 Rohm and Haas (India) Pvt Ltd, Plot No T-22, MIDC Taloja Approved Renewal Of consent to operate
31.01.2021 It was decided to grant renewal of consent to operate after the receipt of CPCB copy of M/s Arc Corrosion registration, clarification of increase in CI and additional fees and by imposing following conditions:
1. Forfeit BG of Rs. 2 lakh for not carrying out hazardous waste audit from renowned institute as per consent condition.
2. Industry shall submit double the BG forfeited i.e Rs.4 lakh towards carrying out hazardous waste audit from renowned institute & submit report up to 30.05.2016.
3. Industry shall extend the existing BG of Rs 5 lakhs towards O & M of PCS.
133 Suryalaxmi Cotton Mills Ltd., Village
Nagardhan, Tal. Ramtek, Dist. Nagpur
Approved Renewal of
consent to operate (increase in CI)
31.01.2021 It was decided to grant renewal of consent to operate by imposing following conditions.
1. Industry shall extend the BG of Rs. 10 lakh obtained towards O&M of ETP.
2. Industry shall extend the BG of Rs. 5 lakh obtained towards O&M of APC system
3. Industry shall extend the BG of Rs. 2.25 lakh obtained towards compliance of HW Rules 2008.
It was decided to return the BG of Rs. 5 lakh obtained towards Installation of CAAQM as industry has complied the same.
Consent shall be issued after submission of requisite consent fee. 134 GMT Mining & Power
Pvt. Ltd., Kh. No. 16, 17, 18, Sawarkhanda, Tal. Kuhi, Dist. Nagpur
Approved Renewal of consent with increase in CI
31.08.2020 It was decided to grant renewal of consent to operate with increase in capital investment by imposing following conditions; 1. Industry shall extend the existing BG of Rs. 5/- Lakhs towards
O & M of pollution control system.
14th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 18 of 32
5/- Lakhs for compliance of the same.
Consent shall be issued after submission of requisite consent fee.
135 Kisanveer SSK Ltd., At - Bhuinj Post -
Kisanveernagar, Tal - Wai, Dist - Satara. (Mineral water) Approved Renewal of consent to operate (Mineral water plant)
31.10.2020 CAC has noted that mineral water plant is located in the premises of existing Sugar unit.
It was decided to grant Renewal of Consent to Operate in green category for manufacturing mineral water - 72000 Crates/Year. Consent shall be issued after obtaining additional Consent fees. 136 Unilever Industries Pvt. Ltd., C-9(Part), MIDC Khamgaon, Dist. Buldhana Approved Renewal of consent to operate (Increase in CI
28.02.2021 It was decided to grant renewal of consent to operate by extending BG of Rs 5 lakhs towards O & M of Pollution Control System.
Consent shall be issued after obtaining additional Consent fees. 137 Supreme Petrochem
Ltd., Village
Amdoshi/Wakan Roha Road, Tal. Roha, Dist. Raigad Approved Amendment in existing consent to operate for change in product-mix and further renewal for two
years
31.08.2019 It was decided to grant Amendment in existing consent to operate for change in product-mix as per MoEF circular dtd 14.12.2006 and further renewal for two years with overriding effect to existing consent by imposing following conditions:
1. This consent is issued in accordance with MoEF, Govt of India circular dated December 14, 2006 stating that in cases of change of product-mix, changes in the quantities or the numbers of product may be allowed without E.C by the concerned SPCB provided such changes in the quantities of product are in the same category and are with the previously granted overall total limits.
2. This consent is granted on the basis of the proforma of no increase in pollution load submitted by the industry and certificate of “no increase in pollution load” dtd 19.01.2016 issued by ICT, Mumbai.
Consent shall be issued after obtaining additional Consent fees.
138 Samarth SSK Ltd., Ankush Nagar, Dist. Jalna
Approved Renewal of Consent to
operate
31.07.2020 It was decided to grant Renewal of Consent to Operate for 18 MW Co-gen by imposing BG of Rs. 5 Lakh towards O & M of pollution control systems.
Consent shall be issued after obtaining additional Consent fees. 139 Godrej & Boyce Mfg.
Co. Ltd., Pirojshan Nagar, Vikroli, Mumbai
Approved Renewal of
consent to operate with decreased CI
30.04.2020 It was decided to grant renewal of consent to operate with decreased CI and consolidate the broader product spectrum without change in total product quantity as per previous consent by imposing following conditions.
1. Industry shall submit the BG of Rs. 5 lakh towards O&M of pollution control system.
2. Industry shall reuse/recycle the 60% treated trade/domestic effluent into the process, flushing, cooling tower, fire fighting etc and remaining shall be used on land for gardening as industry has inadequate land for disposal of total trade & domestic effluent.
Consent shall be issued after submission of requisite consent fee.
140 Unichem Laboratories Ltd., MIDC Dhatav Roha Approved Renewal of consent to operate (increase in CI)
30.04.2020 It was decided to grant renewal of consent to operate with increase in CI by extending BG of Rs 5 lakh towards O & M of PCS. Also the standard of BOD shall be changed from 30mg/l to 100 mg/L as per the CETP general standards as industry is recycling the effluent to maximum extent and remaining is sent to CETP.
14th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 20 of 32
141 Hindustan National Glass & Industries Ltd., MIDC Area, Malegaon, Tal. Sinnar, Nashik
Approved Renewal of
consent to operate
31.10.2020 It was decided to grant renewal of consent to operate by imposing conditions:
1. Forfeit BG of Rs 2.5 lakh obtained towards O & M of PCS as the JVS reports of stack for the parameter “Particulate Matter” is exceeding the consented limit.
2. Industry shall top-up double the BG forfeited i.e Rs 5 lakhs and shall extend the total BG of Rs 7.5 lakhs upto 28.02.2021. 3. Industry shall extend the BG of Rs 5 lakh towards not to
operate pet-coke fired furnace.
Consent shall be issued after obtaining additional Consent fees. 142 Bharat petroleum Corporation ltd.,JNPT,At- Sheva,Tal-Uran.Dist-Raigad. Approved Renewal of consent to operate (decrease in CI)
30.06.2020 It was decided to grant renewal of consent to operate by imposing BG of Rs. 5 lakh towards compliance of consent conditions. Consent shall be issued after after submission of reply towards decrease in CI and other information called by SRO and obtaining additional Consent fees.
143 Crompton Greaves Ltd., Plot No. CTS No. 1007/1 to 676, Kanjurmarg, Mumbai Approved Renewal of consent to operate
28.02.2017 It was noted that SRO has reported that the existing consent of the industry was refused as the industry had not obtained Locational Clearance for expansion activity.
SRO has also reported that the industry has now applied by dis-continuation of stamping & tools products
It was also noted that the Locational policy of GOM is also discontinued.
Therefore it was decided to grant renewal of consent to operate by dis-continuation of stamping & tools products by imposing following conditions;
1. Industry shall submit BG of Rs. 5/- Lakhs towards O & M of pollution control system.
Consent shall be issued after obtaining additional Consent fees. 144 Apcotex Industries Ltd.,
Taloja
Not Approved Renewal of
consent to
--- It was decided to issue SCN for refusal of consent & encashment of BGs due to following non-compliances of previous consent conditions:
operate 1. Industry has failed to carry out Hazardous waste audit.
2. Industry has not verified the in-plant steps taken to reduce water consumption
3. Also Industry lso not upgraded the APC systems as the existing consent conditions.
Resubmission
145 Welspun Syntex Ltd., Plot No. 1, 40 & 45, 116 to 118 Dewan Industrial Estate, Mahim Village, Dist. Palghar Approved Establish (Expansion) Cou or 5 years whichever is earlier
It was decided to grant consent to establish for expansion by imposing following conditions:
1. Industry shall 100% reuse/recycle the treated trade effluent in the process and submit the BG of Rs 5 lakh towards compliance of same.
2. Industry shall submit the Board resolution in prescribed format within one month and submit the BG of Rs. 2 lakh towards compliance of the same
146 PS Steel Tubes Ltd., Village Khanav,
Khalapur. Dist. Raigad
Approved 1st Operate
(part)
28.02.2018 It was decided to grant consent to 1st Operate (part) for
Tube/Precision steel tubes without galvanizing & surface treatment activity by imposing following conditions;
1. Industry shall submit BG of Rs. 5/- Lakhs for O & M of pollution control systems.
2. Industry shall not start galvanizing activity before obtaining consent to Operate from the Board.
147 GKN Sinter Metals Pvt. Ltd., C-18, MIDC, Ahmednagar Approved 1st Operate for expansion with amalgamation of existing consent
28.02.2018 The application for grant of consent to 1st Operate for expansion
of was returned as the work of erection of plant & machinery was not completed & only plain renewal of consent was granted to the industry. Now SRO, Ahmednagar vide letter dtd 21.01.2016 has reported that the industry has completed the erection of plant & machinery of the expansion activity.
It was decided to grant consent to 1st Operate for expansion for
Tin powder 10 MT/M & Sintered bearing & its parts 250 MT/M by amalgamation with existing consent with following conditions;
14th CAC meeting of 2015-2016 (Book-let no 32 (Part- III & IV), dated 02.02.2016 Page 22 of 32
1. Industry to extend the existing BG obtained against O & M of pollution control system.
2. Consent shall be issued with overriding effect to existing consent.
Consent shall be issued after obtaining additional requisite consent fees from the industry.
Table item
1 CEAT Ltd,
Plot No. SZ-39, MIDC Area Butibori, Tah.Hingna, Dist.Nagpur Approved 1st consent to operate (part)
30.09.2016 It was decided to grant consent to 1st consent to operate (part) by imposing following conditions
1. Industry shall submit the BG of Rs. 5 lakh towards O&M of pollution control system.
2. Industry shall extend the existing BG of Rs. 5 lakh obtained towards compliance of consent conditions.
It was also decided to return the BG of Rs. 2 lakh each towards submission of design details of proposed ETP, design details of proposed STP and design details of proposed APC system as industry has submitted the same.
Consent shall be issued after obtaining additional requisite consent fees from the industry.