New Orleans

Public School Facilities Update

June 2013

 

(2)

New Orleans Public School Facilities Update                           2  

Table of Contents

Highlights 3

School Facilities Master Plan for Orleans Parish 4

Background 4

SFMP 2011 Revisions 5

Phases of the Revised Master Plan 6

Phase 1 6

Phase 2 6

Adjustments to the Master Plan 7

Actual Costs versus Estimated Costs 7

SFMP Cost Assumptions 8

Additional Funding Sources 8

Accountability and Support 9

Master Plan Oversight Committee 9

Blue Ribbon Capital Investment Commission 10

Accomplishments and Challenges 11

Recommendations 12

Appendix A: Overview of Master Plan Projects with Budgets and Status 13

Appendix B: Master Plan Funding Analysis 17

Appendix C: Master Plan Oversight Committee Membership & Meeting History 19 Appendix D: Contingency Budgets for Projects with Budgets Over $200K 20

Endnotes 22

The Cowen Institute for Public Education Initiatives 1555 Poydras St STE 700 Tulane University #8760 New Orleans LA 70112-3701 504.274.3690 www.coweninstitute.com

(3)

Highlights

Hurricane  Katrina  provided  New  Orleans  with  a  

historic  opportunity  to  rebuild  its  public  school  

facilities.  The  School  Facilities  Master  Plan  

(SFMP),  adopted  by  the  Orleans  Parish  School  

Board  (OPSB)  and  the  state  Board  of  Elementary  

and  Secondary  Education  (BESE)  in  2008  and  

revised  in  2011,  establishes  a  blueprint  for  

renovating  and  rebuilding  crumbling  school  

facilities.  The  $1.8  billion  lump  sum  settlement  

awarded  by  the  Federal  Emergency  Management  

Agency  (FEMA)  coupled  with  funding  from  the  

community  development  block  grants  (CDBG)  

program,  insurance  proceeds,  New  Market  Tax  

Credits  (NMTC)  and  State  Historic  Tax  Credits,  

and  external  grants  allow  OPSB  and  RSD  to  

complete  the  SFMP;  the  stated  mission  is  to  

ensure  that  

all  New  Orleans  public  school  students  

attend  a  school  in  a  new,  renovated,  or  

refurbished  school.    

By  the  start  of  the  2013-­‐14  school  year,  OPSB  

and  RSD  have  completed  16  major  capital  

projects,  with  27  more  projects  expected  to  be  

under  construction  and  27  in  the  design  phase.  

Approximately  40  percent  of  the  50,000  seats  

the  city  will  need  by  2017  are  completed  or  

under  construction;  49  percent  are  in  design,    

 

and  11  percent  are  in  the  planning  stages.    

Yet,  the  SFMP  has  cost  significantly  more  than  

originally  estimated.  The  budgets  for  projects,  

both  under  construction  and  completed,  have  

exceeded  their  original  budgets  by  24  percent  on  

average.  Unanticipated  cost  increases  threaten  

the  completion  of  the  plan.  Continuous  review  of  

the  costs  and  revenue  projections,  the  scope  and  

scale  of  the  projects,  and  the  educational  

program  needs  are  essential  to  ensure  efficient  

and  equitable  implementation  of  the  plan.  

Two  independent  volunteer  committees  are  in  

place  to  serve  as  advisory  bodies  and  support  

the  implementation  of  the  SFMP.  The  Master  

Plan  Oversight  Committee  (MPOC)  is  responsible  

for  providing  independent,  expert  oversight  and  

must  continue  to  look  at  the  plan  broadly,  

focusing  on  efficiencies  and  maximizing  the  

impact  of  available  funding.  The  Blue  Ribbon  

Capital  Investment  Commission  is  charged  with  

creating  a  strategy  for  securing  long-­‐term  capital  

investment  and  a  maintenance  plan,  a  critically  

important  focus  for  the  central  authorities.  There  

is  no  dedicated  funding  for  such  purposes.  These  

volunteer  structures  provide  the  community  the  

best  way  to  protect  the  broader  public  interest  in  

this  complex  undertaking.  

 

 

 

 

The Scott S. Cowen Institute for Public Education Initiatives at Tulane University provides an objective voice on what is taking place in public education in New Orleans – particularly in the areas of accountability, finance, facilities, and governance. We speak to education leaders, policymakers, the media, and the public by

disseminating pertinent data and research. This New Orleans Public School Facilities Update provides an account of the progress underway in re-building, renovating, and refurbishing public school facilities in the city, where 80 percent of the city was flooded and most of our school buildings damaged or destroyed in 2005. In this report, we update costs, budgets, and anticipated funding for the remainder of the work in the School Facilities Master Plan (SFMP). The purpose is to give the community a current look at the accomplishments and challenges that New Orleans still faces in this colossal and crucial public works project.

(4)

4  

School Facilities Master Plan for

Orleans Parish

Background  

Even  before  the  storm,  school  facilities  in  New   Orleans  were  in  need  of  rehabilitation.  Many  school   buildings  in  New  Orleans  were  among  the  oldest  in   the  nation.  Almost  half  (46  percent)  of  public  school   buildings  in  New  Orleans  were  built  before  1945;  44   percent  were  built  between  1945  and  1975,  with  a   median  construction  date  of  1939.i  Suffering  from   decades  of  deferred  maintenance  and  neglect,  many   schools  were  in  disrepair  or  had  numerous  safety   code  violations  prior  to  the  storm.ii  Hurricane  Katrina   caused  considerably  more  damage  to  the  aging   building  stock.  

 

On  August  29,  2005,  Hurricane  Katrina  struck  the   Gulf  Coast.  New  Orleans  and  the  schools  that  served   the  community’s  65,000  children  suffered  severe   storm  damage  and  massive  flooding  due  to  multiple   levee  failures.    Public  schools  in  New  Orleans   experienced  over  $800  million  in  damages  due  to   flood,  wind,  mold,  termites,  vandalism,  and  theft  as  a   result  of  the  disaster.iii      

 

In  an  effort  to  rehabilitate  public  school  facilities   after  the  storm,  the  Orleans  Parish  School  Board   (OPSB),  the  Recovery  School  District  (RSD),  and  the   state  Board  of  Elementary  and  Secondary  Education   (BESE)  jointly  committed  to  develop  and  implement   a  School  Facilities  Master  Plan  (SFMP)  to  guide  future   school  construction  and  renovation  in  Orleans  Parish.   The  schools  facilities  planning  process  began  in   August  2007.    

 

The  SFMP  was  released  in  August  2008.    The  plan   called  for  rebuilding  and  renovating  67  elementary   schools  and  17  high  schools  and  “land-­‐banking,”  or   closing,  52  campuses.iv  OPSB  approved  the  SFMP  on   November  6,  2008;  days  later,  BESE  approved  the   plan.    

 

The  10-­‐year  plan,  which  was  organized  into  six   phases,  proposed  to  pare  down  the  number  of  public   school  buildings  to  84  rebuilt  or  renovated  schools   based  on  enrollment  projection.  The  plan  was   estimated  to  cost  approximately  $2  billion.  Phase  1   was  expected  to  be  fully  funded  with  $750  million  

from  the  Federal  Emergency  Management  Agency   (FEMA)  and  the  U.S.  Department  of  Housing  and   Urban  Development’s  Community  Development   Block  Grant  (CDBG)  program.v  According  to  the  2008   Master  Plan,  “Other  funding  sources  would  be  

required  to  finance  the  additional  phases  and  to   adequately  maintain  buildings  in  the  future.”vi    

To  remain  current,  the  plan  was  to  be  reviewed  and   adjusted  annually  based  on  revenue  and  cost   estimates  every  two  years  based  on  demographic   studies  and  every  five  years  based  on  education   program  trends.vii    

 

Prior  to  the  creation  of  the  SFMP,  school  officials   recognized  the  need  to  quickly  open  schools  to   accommodate  students  as  they  returned  to  the  city.   The  Quick  Start  Initiative  included  five  RSD  schools,   one  in  each  of  New  Orleans’  five  city  council  districts,   and  a  sixth  school  added  by  OPSB.  Construction   crews  began  demolition  in  December  2007,  marking   the  first  wave  of  school  construction  in  New  Orleans   following  Hurricane  Katrina.viii  

 

In  August  2010,  FEMA  awarded  OPSB  and  RSD  a  final   lump  sum  settlement  of  $1.8  billion.  The  settlement   resulted  in  a  single,  lump  sum  grant  rather  than   through  a  complicated  building-­‐by-­‐building  

assessment  process.ix  The  lump  sum  allows  OPSB  and   RSD  to  combine  funds  from  all  losses  to  build  a   portfolio  of  school  buildings  that  meets  the  needs  of   the  city  rather  than  simply  replacing  what  was  there   before.    

 

The  settlement  included  almost  $700  million  that   was  used  to  fund  the  Quick  Start  Initiative  and   portions  of  Phase  1  of  the  SFMP.  Of  the  $1.8  FEMA   settlement,  $400  million  went  to  OPSB  and  $1.4   billion  to  RSD.  This  amount  did  not  include  the  funds  

QUICK START INITIATIVE

RSD schools

Andrew Wilson Elementary (renovation) Fannie C. Williams Elementary (renovation) L.B. Landry High School (new construction) Lake Area High School (new construction) Langston Hughes Elementary (new construction)

OPSB schools

(5)

from  the  content  replacement  settlement,  CDBG,  or   other  insurance  proceeds.    

 

SFMP 2011 Revisions

School  officials  are  required  to  review  demographic   data  that  guides  the  SFMP  every  two  years1  and  to   adjust  the  plan  accordingly.  The  review  process   considers  projected  enrollment,  demographic  studies   from  each  planning  district,  and  an  estimate  of  the   number  of  public  schools  or  school  organizations  that   will  be  needed  in  2017.  To  determine  need,  officials   consider  land  use  patterns,  updates  to  major  public   and  private  housing  developments,  and  general   progress  in  the  city’s  recovery.  After  considering  the   plan’s  scope,  revenues  and  costs  projections,  

amendments  to  the  original  SFMP  were  proposed  in   July  2011.    

The  amended  plan  received  considerable  community   feedback;  OPSB  and  RSD  joined  with  planning  

experts  to  revise  the  proposed  amendments.  Based   on  this  input,  re-­‐evaluation  of  the  space  needs  of   school  programs,  and  deliberate  development  of   plans  to  save  funds,  revisions  were  made  to  ensure   that  all  public  school  students  in  New  Orleans  will  be   educated  in  an  environment  that  is  “safe  and  dry.”   After  revisions,  all  phases  of  the  amended  SFMP,  at  a   cost  of  approximately  $1.8  billion,  were  expected  to   be  fully  funded.2    

 

The  proposed  changes  condensed  the  original  six   phases  of  the  plan  into  two  phases  of  new  

construction,  renovations,  and  refurbishments.  The   revised  plan  increased  the  number  of  funded  projects   in  Phase  2  from  23  to  52  facilities.  

                                                                                                                         

1  The  review  period  was  set  at  two  rather  than  five  years  because  

ongoing  changes  due  to  Katrina  recovery  and  Housing  Authority   of  New  Orleans  (HANO)  redevelopment.    

2  Prior  to  the  2011  amendments,  the  original  2008  SFMP   included  $420  million  in  unfunded  projects.      

In  addition,  the  revisions  resulted  in  a  projected   savings  and  included  additional  revenues  of  

approximately  $242  million.  Cost-­‐savings  outlined  in   the  revised  plan  totaled  more  than  $139.1  million   through  building  redesign,  revised  labor  cost  

assumptions,  and  use  of  design  prototypes.  Revenue   of  more  than  $102.5  million  was  added  by  reallocated   Restart  funding,  applying  insurance  proceeds  to  the   plan,  and  with  proposals  to  leverage  funding  to   secure  New  Market  Tax  Credits  (NMTC)  and                   State  Historic  Tax  Credits.    

The  goal  of  the  October  2011  revisions  was  to  expand   the  plan’s  impact  to  benefit  every  child  and  every   public  school  in  New  Orleans.  Based  on  re-­‐

assessments,  the  revised  plan  would  include  a  total  of   82  school  buildings  to  house  88  school  organizations.     The  revised  plan  provides  adequate  seats  to  meet  the   2017  enrollment  projection,  which  was  estimated  at   120  percent  of  the  2011  public  school  enrollment,  or   approximately  47,000  public  school  students.  3     Projects  were  prioritized  based  on  the  greatest  need;   in  the  October  2011  revisions,  portable  or  temporary   classrooms  were  to  be  replaced  with  permanent   construction  as  soon  as  feasible.4  OPSB  and  RSD   revised  the  SFMP  such  that  all  facilities  would  be  at   least  refurbished  or  repaired  to  make  them  

sustainable;  occupied  facilities  would  be  funded  in   Phase  2  as  refurbishments.  Facilities  classified  as  the                                                                                                                            

3  In  December  2012,  enrollment  projections  were  reviewed  and   the  plan  adjusted  to  accommodate  50,000  public  school  students   in  2017.  

4  The  prioritization  of  projects  has  been  subject  to  logistical   constraints  at  times.  

October 2011 Revisions to the amended SFMP • Assessment of Capacity Needs

o Projected enrollment of 46,962 students o Neighborhood demographics

o Projected schools or school organizations at 88, including those with unique

programmatic focuses • Assessment of Program Needs

o What types of buildings meet the needs of the various school types

• Assessment of Available Revenues • Assessment of Project Priorities

 

The October 2011 revisions articulated a shift in the mission of the SFMP:

All New Orleans public school students attend school in

a new, renovated, or refurbished school.

(6)

6   least  sustainable  were  prioritized  in  rank  order  for  

renovation  or  new  constriction  in  the  revised  plan.      

Phases of the Revised Master Plan

Phase 1

As  of  March  2013,  Phase  1  of  the  SFMP  is  projected  to   cost  a  total  of  $775  million.  Phase  1  has  a  total  of  28   projects,  including  17  new  schools,  eight  renovations,   one  refurbishment,  and  two  additions.5  Thirteen   projects  have  been  completed,  and  the  schools  are   occupied.x  Ten  projects  are  under  construction,  three   are  in  procurement,  and  two  are  in  the  design  phase.   Phase  1  is  well  under  way  and  the  last  new  

construction  project  of  Phase  1,  Booker  T.   Washington  High  School,  is  currently  in  design.xi  

                                                                                                                         

5  Phase  1  includes  a  new  health  clinic  at  Eleanor  McMain  High   School  funded  by  a  federal  Health  Resources  and  Services   Administration  (HRSA)  grant.  

As  of  March  2013,  OPSB  has  $168  million  in  open   contracts  for  projects  in  Phase  1  of  the  SFMP.  The   total  change  orders  on  Phase  1  projects  accounts  for   1.7  percent  ($2.6  million)  of  the  total  open  Phase  1   construction  contracts.xii    

   

As  of  March  2013,  RSD  has  $249  million  in  open   contracts  for  projects  in  Phase  1.  Total  change  orders   on  RSD  Phase  1  projects  accounts  for  2.3  percent   ($5.1  million)  of  total  open  construction  contracts.  

 

Phase 2

As  of  March  2013,  Phase  2  of  the  SFMP  as  amended  is   estimated  to  cost  a  total  of  $737  million,  based  on   preliminary  cost  projections—four  projects  are  in   procurement,  26  are  in  the  design  phase,  and  27  are   in  the  planning  stage  or  have  not  been  submitted  for  

$5,260,278  

$70,757,223  

$88,069,956  

$40,764,304  

Value  of  Projects:  OPSB  Phase  1    

Design   Procurement   Construc6on   Complete  

$55,681,675   $78,680,233  

$136,560,689   $303,024,437  

Value  of  Projects:  RSD  Phase  1  

Design   Procurement   Construc6on   Complete   Building Definitions

New Construction – to design and build a new building

Renovation – a complete re-construction of the building from the interior, gutting the building to the studs and rebuilding

Refurbishment – to secure the exterior envelope of the building by repairing or replacing the following systems where necessary: windows, doors, roofs, and masonry

Mothballing (Site Preservation) – to protect the building from further deterioration, vandalism, and to comply with the US Department of Interior standards

Bridge Building – to use a building to house students until repair or replacement of a particular building are complete

 

 

Source:  March  2013  Program  Update,  OPSB  &  RSD  Phase  1  Projects,  Jacobs/CSRS  

(7)

design.  Phase  2  includes  41  elementary  schools  and   16  high  schools,  with  new  (16),  renovated  (9)  and   refurbished  schools  (32).  An  outline  of  the  two  SFMP   phases,  including  original  budgets,  projected  budgets   and  project  status,  can  be  found  in  Appendix  A.   OPSB  has  $8.7  million  in  open  contracts  for  the  Phase   2  capital  program  projects;  RSD  has  $25  million  in   open  contracts.  

 

Adjustments to the Master Plan

 

The  initial  cost  projections  for  the  Master  Plan  were   developed  in  mid-­‐  to  late-­‐2008.    As  with  any  multi-­‐ year  construction  master  plan,  the  budgets  for   individual  projects  are  only  estimates.    It  is  not   uncommon  for  the  budgets  of  construction  projects,   especially  renovations  or  refurbishments,  to  increase   throughout  the  life  cycle  of  the  project.    Because  such   changes  have  a  major  impact  on  the  ability  to  

complete  the  plan  with  currently  available  funds,  the   SFMP  is  to  be  periodically  reassessed  and  updated.    

In  assessing  the  feasibility  of  completing  the  Master   Plan  on  time,  on  budget,  and  with  existing  revenues,   two  things  must  be  considered:      

• The  actual  costs  of  projects  that  have  been   completed  or  are  under  way  should  be   compared  to  estimated  costs  in  the  current   plan.      

• The  assumptions  that  support  projected  costs   of  future  projects  should  be  re-­‐evaluated.  

Actual Costs versus Estimated Costs

As  of  March  2013,  the  latest  budget  estimates  for   Phase  1  projects  are  significantly  higher  than  the   original  budgets.  However,  Phase  2  projections  are   slightly  below  original  estimates  (see  Appendix  A).    

Projected  Budgets  as  Compared  to  Original  Cost   Estimates6  

Projected  budgets  for  Phase  1  

and  2  facilities  (2013)   $1,511,802,000   Original  cost  estimates  for  

these  same  projects  (2010,   2011,  2012)  

$1,375,159,000  

Difference   $136,643,000   According  to  the  project  updates,xiii  the  plan,   including  schools  that  are  in  the  planning,  design,   procurement,  construction  phases,  and  those  that   have  been  completed,  will  cost  $1.512  billion.  The   sum  of  the  original  cost  estimates  for  these  schools  as   presented  in  the  2011  revised  SFMP  and  the  2010,   2011  and  2012  quarterly  reports  is  $1.375  billion.    

The  average  project  contingency  for  SFMP  projects   with  estimated  budgets  over  $200,000  is  8.2  percent   (see  Appendix  D).  SFMP  contingency  budgets  are  set   before  projects  go  out  to  bid.  Industry  standards   range  from  10-­‐20  percent.  Officials  contend  that  it  is                                                                                                                            

6  These  figures  include  all  projects  that  are  listed  in  the  SFMP   Revised  Amendments  in  all  stages—complete,  in  construction,   out  to  bid,  or  in  design—except  for  the  Military  Maritime  High   School.    Not  included  in  these  figures  are  minor  stabilizations,   demolitions,  costs  associated  with  temporary  swing  space,  and   mothballing  projects.    See  Appendix  A  for  details.  

The following 13 new or completely renovated schools are already open:

Recovery School District

§ William J. Guste Elementary School § Langston Hughes Elementary School § Andrew Wilson Elementary School § Lake Area High School

§ L.B. Landry High School

§ Joseph A. Craig Elementary School § Jean Baptiste de Bienville Elementary

School

§ Parkview Elementary School

§ Lawrence D. Crocker Elementary School § Fannie C. Williams Elementary School § Carter G. Woodson Elementary School Orleans Parish School Board

§ Mahalia Jackson Early Childhood Center § Edward Hynes Elementary School

 

Construction budgets include an allowance for contingencies, the unexpected costs occurring during construction. Amounts are based on prior construction experience and expected difficulties

(8)

8   not  uncommon  for  average  project  costs  to  increase  

10  percent  after  a  bid  has  been  accepted.xiv    

For  completed  projects  or  those  in  construction,  the   most  recent  Phase  1  cost  projections  are  24  percent   more  than  the  preliminary  cost  estimates,  even  after   contingency  allotments  are  exhausted.  If  all  projects   under  the  SFMP  follow  the  24  percent  overage   pattern,  future  budgets  may  amount  to  nearly  $1.667   billion  compared  to  the  currently  budgeted  $1.52   billion.  

Although  RSD  and  OPSB  officials  have  noted  that   current  bids  are  coming  in  higher  than  expected,xv     projected  budgets  of  Phase  2  refurbishments  are  20.8   percent  lower  than  their  original  estimated  budgets   (See  Appendix  A).    

The  decreased  costs  in  Phase  2,  according  to  officials,   are  due  in  part  because  the  original  project  scope  of   many  refurbishments  included  unnecessary  

upgrades.  For  example,  windows  that  were  originally   planned  for  replacement  are  now  scheduled  to  be   repaired.  However,  because  few  of  the  Phase  2   refurbishments  are  in  procurement,  these  projected   savings  may  be  premature  until  bids  have  been   accepted.  

SFMP Cost Assumptions

In  addition  to  assessing  actual  costs,  officials   considered  the  assumptions  that  support  projected   costs  of  future  projects  and  revised  the  plan  

accordingly.  

Changes  in  construction  costs  due  to  market   conditions  and  inflationary  pressures  on  the  cost  of   materials  and  labor  have  the  potential  to  have   significant  impacts  on  the  project  costs  in  the  SFMP  

over  the  long  run.      

Recent  major  construction  projects  in  New  Orleans   may  have  contributed  to  increased  costs.  For   example,  the  2011  SFMP  revisions  were  based  on   construction  costs  of  $200  to  210  per  square  foot;  in   2013,  these  costs  increased  to  $250  per  square  foot,   approximately  20  percent.  Because  of  fluctuations  in   costs  over  the  span  of  the  ten-­‐year  Master  Plan,   annual  reviews  and  adjustments  are  necessary.  

Additional Funding Sources

To  fully  fund  the  SFMP,  OPSB  and  RSD  are  pursuing   other  sources  of  revenue.  The  districts  secured   funding  from  Community  Development  Block  Grants   (CDBG)  and  are  seeking  funding  from  insurance   proceeds,  external  grants,  State  Historic  Tax  Credits,   and  New  Market  Tax  Credits  (NMTC).  For  example,   OPSB  and  RSD  recently  worked  together  to  close  a   NMTC  transaction  to  secure  additional  funds  for  the   SFMP.  

  School  Facilities  Master  Plan  Costs  Update  

 

Total  Phase  1     Original  Budgets   Projected  Budgets   Percent  Change  

New  Schools   $451,899,227   $553,602,246   22.51%  

Renovations   $176,134,726   $221,504,759   25.76%  

Total   $628,033,953   $775,107,005   23.42%  

 

Total  Phase  2     Original  Budgets   Projected  Budgets   Percent  Change  

New  Schools   $366,354,988   $385,583,816   5.25%  

Full  Renovations   $236,011,730   $236,465,275   0.19%  

Refurbished/Renovations   $144,758,476   $114,645,931   -­‐20.80%  

Total   $747,125,194   $736,695,022   -­‐1.40%  

Source:  March  2013  Program  Update;  SFMP  Revised  Amendments  Oct  2011;  and  Quarterly  Reports  from  2010  Q1,  2011  Q3,  and  2012  Q4,  2013  Q1  

 

Additional Funding Sources

Community Development Block Grant - federal program providing communities with resources to address a wide range of unique community development needs.

Louisiana Historic Tax Credits – a direct dollar for dollar reduction in tax liability

New Market Tax Credits – a tax credit program initiated in 2000 by the US Department of the Treasury, which equals 39 percent of costs

(9)

In  addition,  the  2011-­‐revised  SFMP  recommended   creating  a  pool  of  charter  school  matching  funds  to   utilize  the  $2.6  million  allotment  from  Harrah’s   Casino  proceeds.  Through  this  competitive  program,   schools  could  receive  matching  grants  to  cover   capital  improvements.    

When  the  revised  SFMP  amendments  were  approved   in  October  2011,  these  additional  sources  of  revenue   were  projected  to  total  $244  million.  Based  on   current  projections,  however,  the  estimates  have   been  revised  and  additional  revenues  are  expected  to   total  only  $169  million,  according  to  RSD  and  OPSB   officials.    

In  addition  to  the  alternative  sources  of  revenue,   OPSB  raised  $79  million  in  interest-­‐free  Qualified   School  Construction  Bonds  on  behalf  of  OPSB  and   RSD  students.  OPSB  officials  have  stated  that  these   funds  will  be  used  to  fund  the  SFMP,  if  needed,  or  to   upgrade  some  facilities  that  are  currently  considered   refurbishments.xvi    

This  additional  funding  would  eliminate  the  shortfall   between  projected  budgets  ($1.511  billion)  and  total   funding  ($1.437  billion),  however  if  projects  continue   to  follow  the  24  percent  cost  overrun  pattern  

experienced  by  projects  that  are  completed  or  in   construction,  the  difference  could  be  $210  million.   (See  appendix  B  for  SFMP  funding  details.)  

Accountability and Support  

Master Plan Oversight Committee

OPSB  and  BESE  passed  resolutions  in  December  2008   and  January  2009,  respectively,  to  create  the  Master  

Plan  Oversight  Committee  (MPOC)  to  monitor  project   budgets  and  funding,  explore  project  efficiencies,  and   review  demographic  changes.  The  MPOC’s  oversight   responsibilities  include:  

• To  review  the  annual  capital  budget    

• To  review  progress  and  implementation  of  the   SFMP  

• To  review  changes  to  Master  Plan  

• To  review  building  life-­‐cycle  costs  and  cost  trends   • To  suggest  ways  that  capital  projects  may  

decrease  operating  costs  

• To  review  demographic  changes  and  compare   them  to  the  projections  in  the  SFMP  and   recommend  adjustments  accordingly    

Five  members  of  the  MPOC  are  nominated  by  local   associations  and  institutions  and  are  approved  by   OPSB  and  BESE.  The  nominating  organizations  were   selected  to  ensure  the  committee  members  reflect   the  needs  of  the  community  and  have  the  skills   necessary  to  make  recommendations  to  the  master   plan.  MPOC  meetings  are  subject  to  the  Louisiana   open  meetings  law.  See  Appendix  C  for  more   information.  

The  MPOC  met  regularly  until  2011;  the  last  meeting   of  the  initial  membership  was  held  in  September   2011.  In  October  2012,  efforts  were  made  to  re-­‐ convene  the  group.  New  members  were  nominated   and  approved.    The  MPOC  met,  for  the  first  time  in   over  a  year,  in  May  2013.    The  committee  includes:     • Dr.  Alexandra  Stroud,  Tulane  University  nominee   • Dr.  Andre  Perry,  Urban  League  nominee  

• Jim  Alack,  American  Institute  of  Public   Accountants  nominee  

• Michael  Siegel,  New  Orleans  Business  Council   nominee  

• Nolan  Marshall  Jr.,  OPSB  representative   • Kira  Orange  Jones,  BESE  representative  

A  nominee  from  the  local  chapter  of  the  Associated   Builders  and  Contractors  has  not  been  named.  In   addition  to  the  nominated  members,  Nolan  Marshall,   and  Kira  Orange-­‐Jones  serve  on  the  committee  as   representatives  of  OPSB  and  BESE  respectively.    

Firmly committed to the mission to serve all students, OPSB and RSD will conduct continuous

review of costs and revenues.

It is likely that the scope of the School Facilities Master Plan will need to be amended and additional

funds will need to be raised throughout the implementation of the plan.

(10)

10  

Blue Ribbon Capital Investment Commission

Public  schools  in  New  Orleans  and  throughout   Louisiana  struggle  to  find  revenue  to  pay  for  facility   maintenance.7    Unlike  many  other  states,  Louisiana   has  no  dedicated  funding  stream  for  facility  

maintenance  and  capital  investments.    

For  public  schools,  the  cost  of  construction  and   renovation  provides  a  good  estimate  of  the   replacement  cost  of  school  buildings  at  plan  

completion.    As  a  general  guideline,  industry  experts   recommend  spending  two  to  four  percent  of  the  total   replacement  cost  on  maintenance  annually  to  

maintain  public  buildings.xvii  Given  an  estimated  total   value  of  $2.0  billion,  public  schools  in  New  Orleans   would  need  to  budget  between  $40  million  and  $80   million  per  year  to  adequately  maintain  the  new  or   newly  renovated  facilities.  Based  on  the  2017  public   school  student  population  of  50,000,  the  estimated   cost  of  the  long-­‐term  maintenance  of  school  facilities   is  $786  to  $1,572  per  pupil.  Without  a  dedicated   capital  maintenance  fund,  districts  and  schools  would   be  required  to  either  use  a  portion  of  their  Minimum   Foundation  Program  funding  or  raise  funds  locally.       When  the  revised  amendments  to  the  SFMP  were   approved  in  October  2011,  the  OPSB  and  RSD  agreed   to  appoint  a  Blue  Ribbon  Capital  Investment  

Commission  to  make  recommendations  on  a  long-­‐                                                                                                                          

7  Long-­‐term  facility  maintenance  does  not  include  custodial  and   janitorial  services,  pest  control,  or  grounds-­‐keeping  but  does   include  repairing  building  elements  that  break,  making  routine   preventative  maintenance,  and  replacing  key  building  systems   regularly  (roofs,  waterproofing,  painting,  plumbing,  HVAC,  etc.)  

term  capital  investment  and  maintenance  strategy   for  school  facilities  in  New  Orleans.  The  commission   was  also  tasked  with  making  recommendations  for   funding  needed  to  bring  the  stabilization  projects  up   to  the  Master  Plan  standard.    

The  boards  agreed  to  appoint  seven  members  from   New  Orleans  with  expertise  in  education,  finance,   infrastructure,  law,  and  public-­‐private  partnerships   to  serve  on  the  commission.    

In  March  2012,  OPSB  and  RSD  announced  the   members  of  the  commission:  

§ Maureen  Clary,  Corporate  Realty  

§ Paul  Flower,  Woodward  Design  Build  

§ Charline  Gipson,  Davillier  Law  Group   § Todd  Francis,  FFC  Capital  

§ Elie  Khoury,  KFK  Group  

§ Greg  Rattler,  JP  Morgan  Chase   § Tim  Ryan,  retired  UNO  President  

 

In order to protect facilities construction projects from fraud, RSD contracted with the City of New Orleans Office of Inspector General (OIG) to monitor RSD construction projects in June. The $1.2 million three-year contract with OIG was ended in June 2013. The remainder of the funds will be used for oversight performance by the Louisiana Legislative Auditors and the Governor’s Office of Homeland Security and Emergency Preparedness.

*At the time of the release of this report, the nature of the relationship between the OIG and RSD had not been clarified to the public and the OIG had not yet released its audit on the RSD’s construction oversight practices.

Disadvantaged Business Enterprise (DBE) Program

The Disadvantaged Business Enterprise program provides a vehicle for increasing the participation of minority business enterprises in the implementation of the SFMP. OPSB and RSD have established goals for the

participation of DBEs.

The main objectives of the DBE program are to ensure that small DBEs can compete fairly for federally funded

projects. To be certified as a DBE, a firm must be a small business owned by “socially and economically

disadvantaged individuals,” which includes women and minorities.

In addition to removing some of the barriers that may affect participation of DBEs in federally-assisted contracts, the program assists in business development so they can compete successfully outside the DBE program.

Since the implementation of the DBE program, DBE participation rates have improved for RSD projects: 14 percent on new/major construction projects, up from 10 percent, and 40 percent on minor projects, up from 22 percent. DBE participation rates for OPSB projects are between 20 and 25 percent. The RSD goal for DBE participation is 25 percent. The OPSB goal for DBE participation is 35 percent.  

(11)

                                   

Accomplishments and Challenges

The  SFMP  establishes  a  blueprint  for  renovating  and   rebuilding  crumbling  school  facilities.  The  $1.8  billion   lump  sum  settlement  awarded  by  FEMA  has  provided   the  means  to  complete  the  Master  Plan  and  provide   every  public  school  student  with  a  new,  renovated,  or   refurbished  school  building.  

Since  the  SFMP  was  first  adopted,  much  has  been   accomplished.  

• The  revised  SFMP  proposes  to  “serve  every  child   and  every  school  in  New  Orleans.”  Cost  savings   associated  with  changes  in  project  scope  and   scale  along  with  increased  revenue  from  NMTC’s   and  external  grants  have  made  it  possible  to   expand  the  plan’s  impact.  

• Approximately  21  percent  of  the  50,000  seats   needed  to  serve  all  public  schools  students  in   Orleans  Parish  in  2017  are  expected  to  be   completed  by  August  2013.  Approximately  40   percent  are  expected  to  be  under  construction;   33  percent  are  expected  to  be  in  design,  and  6   percent  are  expected  to  be  in  the  planning  stage.   By  the  start  of  the  2013-­‐14  school  year,  OPSB  and   RSD  will  have  completed  16  major  capital  

projects,  with  27  more  projects  expected  to  be   under  construction  and  27  in  the  design  phase.     • OSPB  and  RSD  have  collaborated  to  close  the  first  

NMTC  transaction,  making  future  NMTC   transactions  more  likely,  which  have  the   potential  to  amount  to  $40  million  in  additional   revenue  for  the  SFMP.    

• OPSB  and  RSD  have  reported  improved  rates  of   Disadvantaged  Business  Enterprise  (DBE)   participation.  OPSB  and  RSD  have  mede  internal   commitments  to  the  program.    

• The  Master  Plan  Oversight  Committee  (MPOC)     has  reconvened  after  18  months.    

Despite  the  progress  that  has  been  made,  OPSB  and   RSD  continue  to  face  challenges  as  they  implement   the  plan.    

• Thus  far,  the  SFMP  has  cost  significantly  more   than  originally  estimated.  The  aggregate  budget   for  all  projects  in  Phases  1  and  2  has  exceeded   the  original  budget  by  $137  million.  While  such   changes  are  not  completely  unanticipated,  the   increases  should  be  accounted  for  in  future   estimates  to  maintain  the  the  city-­‐wide  impact   called  for  in  the  2011  revised  SFMP.    

• Long-­‐term  maintenance  costs  and  the  lack  of   sustained  facilities  funding  present  hurdles  to  the   sustainability  of  quality  school  facilities  in  New   Orleans.  Adequate  funding  for  maintenance  is   New Orleans Public School Building Authority

In 2008, the SFMP called for the creation of “an independent New Orleans School Building

Authority” to develop and manage school facilities. The Authority would be responsible for providing oversight to all building construction, renovation, and refurbishment projects. In addition, the Authority would be responsible for leasing public school facilities to respective school boards and charter organizations, as well as for building maintenance and upkeep.

The SFMP suggested that the new Authority be structured as a new non-profit organization or quasi-governmental body consisting of a private-public partnership. As a bonding authority, the new organization would be responsible for all aspects of managing and maintaining public school buildings in New Orleans. To date, no steps have been taken to create such an independent School Building Authority in New Orleans.

Many states have a State Public School Building Authority (SPSBA) and many local school districts are creating independent building authorities to manage capital projects. For example, the New York City School Construction Authority (SCA) was established in 1988 to build new public schools and manage the design, construction, and renovation of the city’s public school buildings.

(12)

12   essential  for  preserving  the  quality  of  the  new  

and  newly  renovated  or  refurbished  buidlings   completed  under  the  SFMP.  It  is  important  that   stakeholders  consider  possible  ways  to  secure   this  revenue.  

• The  Blue  Ribbon  Capital  Investment  Commission   is  charged  with  creating  a  strategy  to  fund  long-­‐ term  capital  investments  and  maintenance.   Although  the  commission  has  discussed  the   creation  of  an  independent  Public  School  Building   Authority,  no  implementation  has  begun.  

Recommendations

In  order  to  ensure  that  every  public  school  student   benefits  from  a  new,  renovated,  or  refurbished  school   building,  project  costs  and  anticipated  revenues  must   be  closely  monitored.  In  2008,  the  SFMP  called  for   the  creation  of  the  MPOC  to  review  and  support  to   the  implementation  of  the  plan.  The  2011  revised   SFMP  included  a  recommendation  to  create  a  Blue   Ribbon  Capital  Investment  Commission.  These  two   independent  oversight  committees  play  an  important   role  in  plan  accountability.    

In  the  eighteenth-­‐month  period  that  the  MPOC  did   not  meet,  cost  overages  have  become  more  apparent.   It  is  critical  that  this  volunteer  body  meet  regularly  to   review  costs  and  revenues,  project  scope  and  scale,   and  educational  program  needs  to  ensure  efficient   and  equitable  implementation  of  the  plan.    

Public  schools  in  New  Orleans  will  require  future   capital  investment  beyond  funding  outlined  in  the   SFMP  and  a  strategy  for  long-­‐term  maintenance.  The   Blue  Ribbon  Capital  Investment  Commission  was  

appointed  to  generate  recommendations  to  secure   funding  for  sustaining  the  high  quality  of  public   school  facilities.  The  findings  of  this  commission  have   not  been  released.  It  is  important  that  the  community   be  informed  of  the  proposed  strategies,  since  long-­‐ term  solutions  will  certainly  require  state,  local,  and   community  support.  

OPSB  and  RSD  must  continue  to  work  together  to   secure  alternative  funding  required  to  complete  the   SFMP.    The  scope  and  scale  of  the  ten-­‐year  plan   makes  it  difficult  to  manage  and  implement.  

Decentralization  provides  additional  challenges.  It  is   essential  that  OPSB  and  RSD  continue  to  work   together  to  execute  the  plan.  

The  2011  adjustments  to  the  plan  and  mission  to   serve  every  public  school  student  and  every  public   school  building  is  commendable.  In  order  to  fulfill   this  mission,  maintaining  constant  attentiveness  to   cost  overages  is  critical.  OPSB  and  RSD  should  call  on   the  expertise  and  support  provided  by  the  MPOC  and   the  Blue  Ribbon  Capital  Investment  Commission.           New  Orleans  has  a  historic  opportunity  to  build  a   system  of  high  quality  public  school  facilities.  Thanks   to  the  effort  and  diligence  of  OPSB  and  RSD  officials,   expert  volunteers,  and  community  members,  a  plan  is   being  implemented  that  will  ensure  that  all  New   Orleans  public  school  students  attend  a  school  in  a   new,  renovated,  or  refurbished  school.  Through  hard   work  and  collaboration,  it  can  be  done.  

Status  of  the  School  Facilities  Master  Plan  for  Orleans  Parish  (estimated  seats  by  August  2013)  Source:  MPOC  05/2013

(13)

Appendix

Appendix A: Overview of Master Plan Projects with Budgets and Status

Source:  March  2013  Program  Update;  SFMP  Revised  Amendments  Oct  2011;  and  Quarterly  Reports  from   2010  Q1,  2011  Q3,  2012  Q4,  and  2013  Q1  

Phase  1  New  (17)  

Project  Description   Original  Budget   Projected  Budget   Status*  

Bienville  ES   $19,800,000   $21,568,552   Complete  

Parkview  ES   $19,800,000   $23,835,290   Complete  

Langston  Hughes  ES   $29,915,546   $30,244,629   Complete   Lake  Area  HS   $38,923,536   $39,622,512   Complete   Landry  HS         $56,530,760   $60,403,034   Complete   Hynes  ES             $12,679,224   $25,768,942   Complete   Crocker  ES             $19,487,880   $21,425,716   Complete   Carter  Woodson  ES             $19,800,000   $22,235,090   Complete   Fannie  C.  Williams  ES   $19,800,000   $25,180,884   Complete   Mildred  Osborne  ES             $19,800,000   $23,972,720   In  Construction   Harte  ES           $23,442,534   $32,210,409   In  Construction   Little  Woods  ES   $15,567,000   $25,255,308   In  Construction   North  Kenilworth  ES   $22,695,671   $24,778,743   In  Construction   Phillis  Wheatley  ES           $19,800,000   $27,809,140   In  Construction   Carver  HS           $39,600,000   $54,306,089   Procurement   McDonogh  35  HS           $50,613,759   $71,341,871   Procurement   Edward  Livingston  HS           $23,643,317   $23,643,317   Procurement  

*Project Status Definitions: “complete” means the building is ready to be occupied, but may require finishing touches, often referred to as “punch list” items; “in construction” means construction work is underway; “procurement” means the district is in the project bidding process; “design” means the project is currently being planned and designed by an architect; and “planning” means the project has not started, but has been given an internal estimate.

 

Phase  1  Renovations  (9)  

Project  Description   Original  Budget  

Projected  

Budget   Status  

Guste  ES   $2,840,872   $12,643,953   Complete  

Joseph  Craig  ES     $14,110,548   $15,899,637   Complete   Andrew  Wilson  ES   $27,381,787   $29,069,659   Complete   Mahalia  Jackson  ES   $14,730,000   $14,995,362   Complete   William  Frantz  ES       $20,974,087   $26,000,899   In  Construction   Charles  J.  Colton  ES   $15,567,000   $32,857,138   In  Construction   Audubon  ES         $12,409,796   $15,289,815   In  Construction   McMain  HS  (Stabilization  and  Gym)   $12,975,643   $19,603,303   In  Construction   Booker  T.  Washington  HS   $55,144,993   $55,144,993   Design  

(14)

14  

Phase  2  New  Schools  (15)  

Project  Description   Original  Budget   Projected  Budget   Status  

Fisk  Howard  ES  with   Expansion    

$25,836,647   $27,914,597   Procurement   Lake  Forest  ES   $22,567,408   $22,567,408   Design   Dunbar  ES     $22,377,778   $22,377,778   Design   Karr  HS     $30,512,616   $29,952,863   Design   Lower  9th  Ward  HS  

(Lawless)  

$35,582,027   $32,406,567   Design   NO  East  HS   $23,453,718   $23,460,682   Design   Bradley  ES     $22,567,408   $24,657,771   Design   Morial  ES   $22,567,408   $25,417,080   Planning   Bio  District  HS   $23,453,718   $23,453,718   Planning   New  Algiers  ES   $22,567,408   $25,507,738   Planning   Alexander  ES   $22,567,408   $25,507,738   Planning   Abrams  ES   $22,567,408   $25,507,738   Planning   Sherwood  Forest  ES   $24,319,279   $25,507,738   Planning   Behrman  ES   $22,567,408   $25,507,738   Planning   Habans  ES   $22,847,349   $25,836,662   Planning    

Phase  2:  Full  Renovations  (10)  

Project  Description   Original  Budget   Projected  Budget   Status  

Drew  ES     $19,661,993   $19,661,993   Procurement   McDonogh  42  ES   $18,151,123   $18,151,401   Procurement   Wright  HS     $24,807,734   $24,954,623   Design   Douglass  HS     $36,300,941   $36,566,205   Design   John  McDonogh  HS   $34,242,249   $34,242,249   Planning   Clark  HS   $20,228,400   $20,228,401   Planning   Franklin  ES     $14,369,521   $14,369,521   Planning   Live  Oak  ES   $23,804,831   $23,825,388   Planning   Lafayette  ES   $22,222,469   $22,243,025   Planning   Tubman  ES     $22,222,469   $22,222,469   Planning    

Phase  2:  Refurbishments  and  Renovations  (30)  

Project  Description  

Original   Budget  

Projected  

Budget   Status  

Allen  ES         $5,061,830   $1,215,007   Design   Andrew  Jackson  ES         $4,195,710   $1,336,787   Design   Crossman  ES                $523,320   $486,741   Design   Warren  Easton  HS         $2,830,114   $2,830,114   Design  

(15)

Eisenhower  HS       $2,124,353   $1,764,308   Design   Fortier  (Lusher)  HS         $18,755,692   $13,726,913   Design   Gentilly  Terrace  ES         $2,260,087   $1,554,613   Design   Lusher  ES         $4,751,620   $410,853   Design   Martin  Luther  King  Jr.  ES   $3,319,455   $796,347   Design   Reed  HS         $3,561,447   $1,198,439   Design   Green  ES         $5,017,221   $6,134,747   Design   S.  Williams  ES         $2,124,353   $967,147   Design   Bauduit  ES         $3,378,621   $3,589,261   Design   Laurel  ES         $6,852,185   $6,734,069   Design   McDonogh  28  ES       $3,312,368   $2,482,670   Design   Wicker  ES         $1,064,201   $796,113   Design   Marshall  ES         $5,088,147   $941,051   Design   Harney  ES             $1,806,664   $350,312   Design   Fischer  ES   $23,004,257   $25,927,734   Planning   Ben  Franklin  HS         $3,770,528   $3,770,528   Planning   Rosenwald  ES   $847,587   $255,095   Planning   O.  Perry  Walker  HS   $1,779,350   $2,279,057   Planning   Bethune  ES  Addition     $4,094,149   $264,287   Planning   Nelson  ES   $2,773,713   $2,347,379   Planning   McDonogh  7    ES   $2,588,278   $4,044,403   Planning   Schwarz  HS         $1,778,014   $1,603,186   Planning   Village  de  L’est    ES   $2,557,501   $632,125   Planning   Schaumburg  ES             $2,531,345   $243,417   Planning   McDonogh  32  ES   $22,308   $22,308   Planning   Gaudet  ES   $22,984,058   $25,940,920   Planning  

 

Summary  Phase  1     Original  Budgets   Projected  Budgets   %  Change  

New  Schools    $                  451,899,227      $                          553,602,246     22.5%   Renovations    $                  176,134,726      $                          221,504,759     25.8%   Total    $                  628,033,953      $                          775,107,005     23.4%  

 

Summary  Phase  2     Original  Budgets   Projected  Budgets   %  Change  

New  Schools    $                  366,354,988      $                          385,583,816     5.2%   Full  Renovations    $                  236,011,730      $                          236,465,275     0.2%   Refurbishments/   Renovations    $                  144,758,476      $                          114,645,931     -­‐20.8%   Total    $                  747,125,194      $                          736,695,022     -­‐1.4%        

(16)

16  

Budget   Total  

Original      $            1,375,159,147     Projected      $            1,511,802,027     Budgets  following  Phase  1  Pattern*    $            1,666,500,718     Total  Original  Budgets  +  20%    $            1,650,190,976    

 

*This  figure  is  the  sum  of  Phase  2  original  budgets  plus  24.3  percent  and  Phase  1  projected  budgets,  except  that  the   projected  budgets  for  phase  2  refurbishments/renovations  was  used  instead  of  their  original  budgets.  

 

(17)

Appendix B: Master Plan Funding Analysis

Source:  SFMP  Revised  Amendments  Oct  2011,  Informal  Master  Plan  Oversight  Committee  Meeting     September  2012  

 

Funding   (October  

2011)   Phase  0   Quick  Start   Phase  1   Phase  2   Total  Phase  1  &  2   Total  

FEMA   Permanent   Construction   $83,181,814   $184,273,287   $634,851,030   $633,136,564   $1,267,987,594   $1,535,442,695   Community   Block  Grant   Funding   (CDBG)   $55,600,000       $56,530,000   $25,200,000   $81,730,000   $137,330,000   Insurance   Proceeds   (Less  FEMA   deductions)               $60,000,000   $60,000,000   $60,000,000   Restart               $18,900,000   $18,900,000   $18,900,000   State  Historic   Tax  Credits               $43,566,987   $43,566,987   $43,566,987   New  Market   Tax  Credits               $40,000,000   $40,000,000   $40,000,000   External   Grants           $8,732,000       $8,732,000   $8,732,000   Total   $138,781,814   $184,273,287   $700,113,030   $820,803,551   $1,520,916,581   $1,843,971,682       Funding  Updated   (September  2012)   Phase  2   Updated     Total  Phase  1   and  2  Updated   Total     Updated   FEMA  Permanent   Construction   $633,136,564   $1,267,987,594   $1,535,442,695   Community  Block  Grand  

Funding  (CDBG)   $25,200,000   $81,730,000   $137,330,000   Insurance  Proceeds  (Less  

FEMA  deductions)   $30,000,000   $30,000,000   $30,000,000   Restart   $18,900,000   $18,900,000   $18,900,000   State  Historic  Tax  Credits   $20,000,000   $20,000,000   $20,000,000   New  Market  Tax  Credits   $10,000,000   $10,000,000   $10,000,000   External  Grants       $8,732,000   $8,732,000  

Total   $737,236,564   $1,437,349,594   $1,760,404,695    

(18)

18  

Total  Budgets  from  

Appendix  A   Budgets   b/w  Funding    Difference  

Difference   b/w  Funding  

Updated   Total  Original  Budgets   $1,375,159,147   $145,757,434   $62,190,447  

Total  Projected  Budgets   $1,511,802,027   $9,114,554   -­‐$74,452,433  

Total  Budgets  following  

Phase  1  Pattern*   $1,666,500,718   -­‐$145,584,137   -­‐$229,151,124  

Total  Original  Budgets  +  

20%    $          1,650,190,976     -­‐$129,274,395   -­‐$212,841,382  

*This  figure  is  the  sum  of  Phase  2  original  budgets  plus  24.3  percent  and  Phase  1  projected  budgets,  except  that  the   projected  budgets  for  phase  2  refurbishments  were  used  instead  of  their  original  budgets.  

 

(19)

Appendix C: Master Plan Oversight Committee Membership & Meeting History

Source:  Information  here  comes  from  www.OPSB.us,  Orleans  Parish  School  Board,  and  State  Board  of  Elementary   and  Secondary  Education  meeting  documents.  

Members  November  2009-­‐September  2011:  

§ Karl  Clifford,  appointed  by  Construction  Masters,  which  is  linked  to  the  Associated  Builders  and  Contractors   § Karen  Dwyer,  appointed  by  the  local  chapter  of  the  American  Institute  of  Public  Accountants  

§ Jim  Garvey,  appointed  by  the  Board  of  Elementary  and  Secondary  Education  

§ Louella  Givens  Harding,  appointed  by  the  Board  of  Elementary  and  Secondary  Education   § Paul  Flower,  appointed  by  the  Business  Council  of  New  Orleans  and  the  River  Region   § Rick  Jones,  appointed  by  the  local  university  presidents  (Last  meeting  January  2011)   § Lourdes  Moran,  appointed  by  the  Orleans  Parish  School  Board  

§ Nolan  Rollins,  appointed  by  the  Urban  League  of  Greater  New  Orleans  (Last  meeting  January  2011)       Meeting  Dates:   November  3,  2009   February  10,  2010   April  27,  2010   May  24,  2010   August  30,  2010   October  25,  2010     January  24,  2011   March  28,  2011   June  30,  2011   September  26,  2011   Canceled  Meetings:   June  22,  2010   June  30,  2010   September  28,  2010   November  30,  2010   May  26,  2011   November  28,  2011        

Members  as  of  February  2013:  

§ James  Alack,  appointed  by  the  American  Institute  of  Certified  Public  Accounts  

§ Kira  Orange-­‐Jones,  appointed  by  the  Board  of  Elementary  and  Secondary  Education  

§ Nolan  Marshall  Jr.,  appointed  by  the  Orleans  Parish  School  Board  

§ Dr.  Andre  Perry,  appointed  by  the  Urban  League  of  Greater  New  Orleans  

§ Michael  Siegel,  appointed  by  the  New  Orleans  Business  Council  

§ Dr.  Alexandra  Stroud,  appointed  by  the  local  university  presidents       Meeting  Dates:   May  9,  2013   Canceled  Meetings:   N/A        

(20)

20  

Appendix D: Contingency Budgets for Projects with Budgets Over $200K

Source:  2012  Fourth  Quarter  Capital  Projects  Quarterly  Report  published  for  the  Louisiana  Department  of   Education.  Note:  included  here  are  some  projects  that  are  not  funded  under  the  Master  Plan.  

District   Project  (over  $200k,  no  demolition,  no  mothballing)  

Estimated   Budget  

Total   Contingency   %  

RSD   BAS  Integration   $229,369   $0   0.0%  

RSD   Baudult  ES-­‐  Refurbishment   $3,569,712   $544,648   15.3%   RSD   Bell  JH  (Phase  1-­‐  Roof)   $2,140,855   $0   0.0%   RSD   Bell  JH  (Shoring)   $1,256,095   $150,000   11.9%   RSD   Booker  T.  Washington-­‐New  Construction   $55,144,993   $5,100,511   9.2%   RSD   Bradley  ES  -­‐  New  Construction   $24,657,771   $1,395,723   5.7%   RSD   Carver  HS  -­‐  New  Construction   $54,303,350   $4,936,668   9.1%   RSD   Colton  -­‐  Renovation   $32,846,878   $3,061,378   9.3%   RSD   Crossman  ES-­‐  Refurbishment   $460,742   $69,255   15.0%   RSD   Douglass  HS-­‐  Renovation   $36,559,207   $4,765,618   13.0%   RSD   Drew  ES-­‐  Renovation   $19,661,993   $2,235,802   11.4%   RSD   Dunbar  ES-­‐  New  Construction   $22,377,778   $1,361,520   6.1%   RSD   Eisenhower  HS-­‐  Refurbishment   $1,738,309   $263,971   15.2%   RSD   Fisk-­‐Howard  ES-­‐  New  Construction   $25,145,449   $1,808,556   7.2%   RSD   Frantz  Renovation  and  Addition   $24,675,669   $2,256,185   9.1%   RSD   Gentilly  Terrace  ES-­‐  Refurbishment   $1,528,614   $231,919   15.2%   RSD   Jackson  ES-­‐  Refurbishment   $1,310,788   $198,653   15.2%   RSD   Jackson  K-­‐8  Solar  Panels   $250,000   $12,422   5.0%   RSD   John  McDonogh  HS  (Bleachers)   $323,463   $27,138   8.4%   RSD   Lawless  HS-­‐  New  Construction   $32,406,567   $2,946,052   9.1%   RSD   Little  Woods  -­‐  New  Construction   $25,159,683   $1,198,080   4.8%   RSD   Livingston  HS-­‐  New  Construction   $23,643,317   $2,535,736   10.7%   RSD   Martin  Luther  King  Jr.  ES-­‐  Refurbishment   $766,159   $115,644   15.1%   RSD   McDonogh  28  ES-­‐  Refurbishment   $2,442,527   $373,880   15.3%   RSD   McDonogh  42  ES-­‐  Renovation   $18,151,123   $2,036,919   11.2%   RSD   Nelson  ES-­‐  Refurbishment   $2,347,379   $0   0.0%   RSD   NO  East  HS  at  Abramson-­‐  New  Construction   $23,453,718   $1,688,762   7.2%   RSD   Osborne  -­‐  New  Construction   $24,447,403   $1,164,162   4.8%   RSD   Reed  HS-­‐  Refurbishment   $1,152,650   $174,523   15.1%   RSD   Sophie  B  Wright  ES-­‐  Renovaiton   $24,815,434   $2,788,687   11.2%   RSD   Sylvanie  Williams-­‐  Refurbishment   $936,959   $141,645   15.1%   RSD   Sylvanie  Williams  AHU     $404,055   $52,703   13.0%   RSD   Wheatley  -­‐  New  Construction   $22,497,999   $5,280,820   23.5%  

(21)

RSD   Wicker  ES-­‐  Refurbishment   $764,081   $115,328   15.1%   OPSB   Benjamin  Franklin  HS-­‐  Stabilization   $1,202,557   $0   0.0%   OPSB   Easton  HS-­‐  Refurbishment   $2,830,114   $966,777   34.2%   OPSB   Easton  HS  (Window  Replacement)   $2,380,000   $0   0.0%   OPSB   Fortier  (Lusher)  HS-­‐  Refurbishment   $13,684,472   $0   0.0%   OPSB   Harte  School  -­‐  New  Construction   $28,237,778   $2,599,178   9.2%   OPSB   Karr  HS-­‐  Gym  Repair   $282,372   $0   0.0%   OPSB  

Lake  Forest  School  at  Greater  St.  

Stephens   $24,993,905   $930,001   3.7%  

OPSB   Lusher  ES-­‐  Refurbishment   $282,372   $0   0.0%   OPSB   Mahalia  Jackson-­‐  Office  Renovation   $200,000   $6,842   3.4%   OPSB   McDonogh  35  (Phillips/Waters)   $57,072,600   $5,188,418   9.1%   OPSB  

McDonogh  35  HS-­‐  Stabilization  

(Elevator)   $2,282,372   $0   0.0%  

OPSB   McMain  School-­‐Gymnasium   $15,239,662   $3,441,207   22.6%   OPSB   New  Karr  HS  (JE  Smith)   $29,952,863   $1,625,855   5.4%   OPSB   New  PK-­‐8  at  North  Kenilworth  Park   $22,695,671   $0   0.0%    

Contingency  Budget  Summary:  

Average   Average  RSD   Average  OPSB  

8.2%   8.7%   6.8%  

References

Related documents

In the fifteenth century another great building, D, with its arcades opening up, on the ground floor, onto the courtyard, took up the whole of the western side of the Villa.. In

Although theoretically the likelihood of finding evidence that dumped imports have in- jured the domestic industry should fall as the industry increases its output, the results from

18 th Sunday in Ordinary Time Saint Rose of Lima Parish Parroquia Santa Rosa de Lima.. August

shapes of the AGN and star formation IR SEDs (see blue dashed and red solid curves in Fig. 2 ), which results in sources with a signif- icant contribution from the AGN component

Southwest Chicken Salad 7.00 – Spring mix lettuce with crispy chicken strips, diced tomato, roasted corn, black beans and a chipotle avocado ranch dressing. Bistro Roast Beef

Using a nationwide database of hospital admissions, we established that diverticulitis patients admitted to hospitals that encounter a low volume of diverticulitis cases have

Another study found female gender, obesity, diabetes complication and comorbidities were associated with lower HRQL, among 784 T1D adults (Coffey et al.,2002).Women appear

Other factors that favor good performance in adult cochlear implant candi- dates include lip-reading ability and residual hearing before implantation (patients with some hearing in