• No results found

Industrialization and co-operation with Design. Sinikka Lyyra Manager, DFM

N/A
N/A
Protected

Academic year: 2021

Share "Industrialization and co-operation with Design. Sinikka Lyyra Manager, DFM"

Copied!
17
0
0

Loading.... (view fulltext now)

Full text

(1)

Industrialization and

co-operation with Design

Sinikka Lyyra

Manager, DFM

(2)

Content

• Elcoteq SE

• DFM in Elcoteq SE

• Competence work

• DFM process flow

• DFM tool development

• DFM & board assembly

(3)

Elcoteq’s Service Offering

• Anticipate future customer and market demand

and emerging technologies

• Integrated end-to-end services for the products’

whole life-cycle

• Horizontal integration from design to after-sales

services

Design

Sourcing

New

Product

Introduction

(NPI)

Purchasing

and Inbound

Logistics

Global

Manufacturing

Distribution

and Outbound

Logistics

After-Sales

Services

(4)

Global Coverage

• Proximity to the end-markets

• Availability of skilled labor

• Cost benefits

Brazil

Q4/2004

USA

Japan

Russia

Germany

Sweden

Hungary

Estonia

China

Korea

Emerging

markets

Other locations

Mexico

Brazil

USA

Japan

Germany

Sweden

Hungary

Finland

Estonia

China

Korea

Volume production

markets

India

Switzerland

(5)

Plant

Country

Founded/

Area

Personnel

Services

acquired

(m

2

)

Nov. 2005

Europe

Lohja Plant

Finland

1991

8,700

419

NPI, low to medium volume production

Tallinn

Estonia

1992

42,000

3,730

NPI, high volume production

St. Petersburg

Russia

1997

14,700

285

Medium to high volume production, NPI

Pécs

Hungary

1998

46,000

4,997

High volume production, NPI, after-sales

Offenburg

Germany

2003

14,500

430

NPI, low to medium volume production

Europe, total

125,900

9,853

Asia-Pacific

Dongguan

China

1999

13,000

2,075

High volume production

Beijing

China

2000

19,200

3,082

High volume production, NPI

Shenzhen

China

2003

9,300

808

High volume production

Bangalore

India

2004

5,500

224

High volume production

Asia-Pacific, total

47,000

6,189

Americas

Dallas

USA

2003

2,500

101

NPI

Monterrey

Mexico

1999

18,300

1,372

High volume production, after-sales

Juarez

Mexico

2005

17,000

2,200

High volume production, NPI

Manaus

Brazil

2004

1,500

247

Medium to high volume production

Americas, total

36,800

3,920

Other Elcoteq locations

816

Total

209,700

20,778

(6)

Concentration

on communications technology

Consistency

in plant network, machinery,

systems and processes

Continuous improvement

Competitive service offering

Co-evolution

Superb customer service

Confidentiality

Cost-efficiency

All volume capacity in

low-cost countries

Competence

especially in wireless telecom

Coverage

Global service network

and full service range

(7)

Design for Manufacturing in Elcoteq

The value-added service of instituting "best practices" in the design stage

to improve manufacturability.

Objective is simplify the product from manufacturing point of view and

lower manufacturing costs, increase product quality and reduce

production creation time prior to mass production.

DFM includes analysis of design for best manufacturing and assembly

and analyses design documentation for production needs.

Target: Products design fits to Elcoteq processes and equipment

capabilities

DFM in Elcoteq contains:

– DFBA

Design For Board Assembly

– DFA

Design For Final Assembly

(8)

DFM

Value added service

SMA

DFM guidelines

FA

•FA guidelines (draft)

DFM process flow in

NPI /ES

P

r

o

d

u

c

t

D

e

s

i

g

n

Manufacturing Technology

Development

Testing

DFT guidelines

DFM guidelines

and metrics

•DFBA

•DFA

•DFT

(9)

COMPETENCE WORK

• Build connections between plants and NPI/ ES centers

DFM process owners

• Share experience and best practises between plant and

NPI/ES members

• Collect capabilities and limitations of existing production

equipments

• Collect and update existing Design Guidelines for

manufacturing

(10)

COMPETENCE WORK

Working methods:

• Information sharing, best practise sharing

• Agreeing commen coals and procedures

• Update Elcoteq Design guideline

• DFM templates for reporting results of analyses

• Training to DFM work

(11)

Practical DFM work in Elcoteq

• DFBA analyses at board level made by process engineers

and consentrated on assembled boards

• Product Technicians/Proto Managers co-ordinate

documentation related feedback to customers (errors in

BOM, missing information...)

• Final assembly development engineers made DFA

analyses

• Test engineer/designers do test related DFT analyses at

quotation phase

• Elcoteq Design guidelines for board assembly area

• DFA Guideline draft version

(12)

DFM process flow

Critical Design phase

Final Design phase

Factory

Costing phase

Project starts

SMA & FA DFM

Transfer review

-input data from

customer

-DFM analyses with

small production team

-DFM meeting with

customer

- DFM analyses report

update after protobuilds

-DFM meeting with

customer

Design state 1

Analyses.

Design state 2

Approval

- Design approved for

production

- Minor DFM problems

- DFM report updated

after protobuilds

- DFM meeting with

customer

Design state 3

Verification

- Verified design for

production

-Minimum DFM

issues

-DFM report update

and meeting with

customer

- Lessons learned of

project

Preliminary Design

state

DFM Guideline

DFM guidelines

DFM competence work

Trilogy 5000

(13)

DFM tool development

• Valor Trilogy 5000

• Tool to do DFM work systematically on board

assembly level

– feedback to customer from documentation,

BOM, PWB design and assembly

– systematic way to check documentation

– findings don’t depend on the expertise of the

person, no human factor

(14)

DFM feedback documents

• NPI SMA DFM template

• NPI DFA template

DFA template

NPI SMA DFM

(15)

DFM & board assembly

• Panel layout will affect on manufacturing cost

– optimized panel - lower cycle time - lower cost

• Co-operation with PWB layout design and plant

engineering and PWB supplier is essential to

achieve best possible solution

– panel layout, which would be optimized to line

– Needed fiducials and other tooling holes

(16)
(17)

World’s leading EMS provider

to communications technology

References

Related documents