• No results found

An integrated production and preventive maintenance planning model with imperfect maintenance in multi-state system

N/A
N/A
Protected

Academic year: 2020

Share "An integrated production and preventive maintenance planning model with imperfect maintenance in multi-state system"

Copied!
15
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 2. Demand of items
Table 4. Imperfect and perfect preventive maintenance variables
Table 7. Effective age function of components m=3  m=2m=1  PeriodComponent a /6 (item) 0  1.331  11  2  0.330.66   0.990.33  0  1.32  3  1.32  0.99  0.66  4   0  1.331  1 2   2    0.33 0.66    0.99 0.33  0  1.32  3   1.32  0.99  0.66  4
Table 9. Total integrated cost comparisons for different types of preventive maintenance

References

Related documents

Comparison between HOAt, HOBt, and Oxyma showed the same trend as ob- served in solution phase: Oxyma performed with a level of inhibition of racemization similar to that of HOAt

The expectile value is related to the asymmetric squared loss and then asymmetric least squares support vector machine (aLS-SVM) is proposed.. The dual formulation of aLS-SVM is

For traditional Chicken Scratch” white is the floss color of choice for the filling stitches, with the outline stitch worked in the same color as the darkest check of the gingham

Discussion has so far applied the MLP and SPT independently to examine the limited success of VBBs and related banking practices, respectively. We undertook these analyses with the

Article 10 of the Horizon 2020 Rules for Participation provide that the following participants are eligible for funding from the Union: (a) any legal entity established in a

Figure 12 illustrates surface drill pipe pressure versus time for driller’s and wait & weight methods in which the pressure remains constant until the arrival of

Recent advances in the expansion and directed pancreatogenic differentiation of human pluripotent stem cells (hPSCs) have intensified efforts to generate functional pancreatic

In total the first problem set contains 144 test problems (3 ordering cost levels, 2 holding cost levels, 3 demand distributions, and 3 cycle lengths–with 4 and 8 cycle problems