Public Hearing

Comprehensive Plan

Transportation Element

Presentation to Planning Commission

January

21

1

2015

RCW 36.7oa.o7o- Comprehensive Plans

-Mandatory Elements

Transportation Elements is a required element that implements

and is consistent with Land Use Element

• Land Use Assumptions

• Estimated Traffic Impacts/ Local & State Roads • Facilities & Service Needs

-Inventory

-Level of Service (LOS) Standards/ Concurrency -Required Actions to meet LOS

-Traffic Forecast

-Transportation (Multi-Modal) needs list • Finance

• Intergovernmental Coordination • Demand Management Strategies • Pedestrian & Bicycle Component

(2)

Level of Service Standards

Current

Recommended in

2009 Transportation Master Plan

• WMC 21.28.070- City has adopted LOS "E" for operation for all of it's road system.

• Consistent with current Comprehensive Plan

• Adopt LOS "C" for local roads and intersections within R-1, R-4, R-6 Land Use Zones.

• Retain current LOS Standards (E) for arterials and intersection of arterials and local roads.

Included with this Draft Element • LOS Standards for pedestrian, bicycle and transit.

• Allow LOS "C" for local roads and intersection within R-1, R-4, R-6 zones

• Retain LOS (E) for all other roads and intersections.

Level of Service Standards cont'd.

• The purpose of the higher level of service standard for local

roads is to preserve the look, feel, and operational

characteristics of residential streets as "residential" and not

allow them to be used for through traffic and the fulfill

network capacity needs.

• Subject to the following

conditions-1.

This applies to local roads and intersections (residential) only

.

2.

This does not apply to designated arterial roads with

i

n or adjacent to

these zones

.

3

·

This does not apply to an intersection of a local street and an arterial

street

.

This intersection would be considered part of the arterial

street network.

(3)

Level of Service Standards cont'd.

• Impacts on Development if LOS Standards not

met-WMC 21.28.ogo - a development proposal which will have a

direct traffic impact... on a roadway or intersection which results

in a calculated LOS F shall not be approved

...

- Net Results - The Transportation Infrastructure needs to provide adequate roadways and intersections for planned land use (acceptable LOS), or development cannot occur, will not be

approved.

- Potential moratorium on new development and redevelopment within the City.

- With the selection of a Land Use/Zoning Alternate comes the selection/commitment to a list of future Capital Projects.

Draft Comprehensive Plan, Exhibit

3-26

New New Employment PM Peak

Housing Units (persons) Hour Trips

ALT 1 -No Action Current Plan 2,615 4.476 2,845

ALT 2 -Update with Mixed Use

2,682 to 3,097 5,028 to 5.433 3,485

Land Use Changes

ALT 3- Current Plan with Greater

Downtown Growth and 3,090 12,944 6,032

City lnfill

2009-TMP 2,136 8,139 3,610

EXHIBIT

II

(4)

111f18·1WO.t.t.ll,qilla

l

I \

--

---_,....,...._

.

_

..,

____

___

_

_

.,. ...

_

___

...

..

__

____

..

- . . . M

--

.

·

-

...

-

...

....

--

-

--

-

-

-~ ~ ~ ~ :; : : : :: .::

Land Use

Transportation Analysis

Zone (TAZ)

From PSRC Traffic Model

38 TAZ

'

s

4 Outside City in UGA

34 Inside City

I

...

..

..

...

.

~· .~·::-·

.

(5)

I

EXH

IBIT

17

\

PAGE

_2.

0F

J7

Project Common to All Alternatives

• Woodinville-Duvall Road Widening -

156th

Avenue NE

to

1715t

Avenue NE- under Construction

• NE

1715t

Street Urban Parkway Improvements-

in

Design

• Sammamish River Bridge Widening- in Design

(6)

Additional Projects needed for ALT

-1

• Intersection of

~32nd

Avenue NE

I

~33rd

Avenue NE

and NE

~75th

Street Traffic S

i

gnal

• Intersection on

~3oth

Avenue NE and NE

~95th

Street

New traffic signal (with City of Bothell)

• Roundabout at

~32nd

Avenue NE

I

NE

~43rd

Street intersection

• SR 202 Trestle Replacement Project

Lengthen railroad bridge and widen SR 202

(~3~st

Avenue NE)

to 81anes

EXH\B\T_

/7

PAGE

i-

OF

L

(7)

-Additional Projects needed for ALT-2

(In addition to

Alt-~

Projects)

• Woodinville-Snohomish Road

I

~4oth

Avenue NE Intersection

Improvements

• Downtown Grid Roads -

~35th

Avenue NE

1 ~38th

Avenue NE

1

NE

~73rd

Street

~4oth

Avenue NE

I

NE

~7~st

Street Intersection Improvements

~36th

Avenue NE

I

NE

~95th

Street- New traffic signal and/or

intersection improvements

• SR 522

I

SR 202

I

~3~st

Avenue NE - Overcrossing widening

1

road widening

1

and intersection improvements

• Mill Avenue

I

Woodinville-Snohomish Road

I

Little Bear Creek

Parkway- Remove signals and construct roundabout

• SR 522

I

NE

~95th

Street Interchange- Complete interchange

by constructing eastbound on and westbound off ramps

City of Woodinville --,~-~::~~~ .. ~ I/ - -·

----~

I

EXHIBfT

.

/7

"J

/

P

.

4GE

2

0F

fl

-'

-·-·-

-

--

(8)

-Additional Projects needed for ALT-3

( In addition to Alt-1. and Alt-2 Projects)

• CCRP - Crossing from Home Depot area in Bothell over

SR 522 to Woodinville Drive with other intersections and

access points.

• One way couplets on NE 1.71.

5

t Street and NE 1.75th

Street.

These projects are cost prohibitive for the City to

undertake (over

$100

Million)-

refer to earlier information

on meeting Adopted LOS Standards

.

Any Questions?

S

.

{H\BIT

_a_

l

References

Related documents

We designed the OPINION trial powered to evaluate the non-inferiority of OFDI-guided PCI compared with IVUS-guided PCI in terms of clinical outcomes.. Patients scheduled for PCI

7 Circulation layouts 37 7.1 Discussion 37 7.2 Dimensions used 37 7.3 User-friendly features 37 7.3.1 Discussion 37 7.3.2 Simplicity 37 7.3.3 Crossovers 38 7.3.4 Circulation

In GRIB2, Section 3 defines the grid which will be used, however the whole set of sections 3 to 7 can be repeated allowing for different types of grid in the message (same for 2 to

Our team will personally comment on the most relevant market updates so that Crisp Analytics is more than news aggregation – it is „Analyst Insights as-a-Service“..

Once registered, you can use this fully interactive site along with your product to enhance your learning experience, expand your knowledge, link with instructors, and connect with

Join this collaboration of current business incubator programs that strive to fulfill the economic promise that entrepreneurship offers, by providing entrepreneurs

Here, we used FE models in COMSOL to calculate the inductance and predict the sensor s response to conductive film The coil diameter is chosen to achieve a relatively

s making sure that laboratory personnel receive training in gen- eral chemical safety and security, especially how to work safely with COCs;.. s providing specific training