• No results found

Quality Management using Key Performance Indicators at MTU Aero Engines

N/A
N/A
Protected

Academic year: 2021

Share "Quality Management using Key Performance Indicators at MTU Aero Engines"

Copied!
15
0
0

Loading.... (view fulltext now)

Full text

(1)

Quality Management using

Key Performance Indicators

at MTU Aero Engines

Egon Behle,

CEO, MTU Aero Engines

(2)

• Risk- and revenue-sharing partner in programs of all major OEMs

• Focus on low-pressure turbines and high-pressure compressors

• Approx. 30% of the active engine fleet flies with MTU components on board

OEM business

Commercial engine business Military engine business Commercial MRO

1.146 m€ (42%) 497 m€ (18%) 1.113 m€ (40%) Revenues*

MTU and its business model

• Capability to develop and manufacture complete propulsion systems

• R&D is frequently financed by the customer

• MTU has significant stakes in the major European military programs

• Largest independent provider of commercial engine MRO

(Maintenance, Repair and Overhaul)

services

• Stakes in engines with high growth rates (V2500, CFM56, CF34)

• Strong presence in Asia

*)FY2008 MRO business GP7000 EJ200 2,724.3 m€ ∑ Revenues* 331 m€ EBIT * 7537 Headcount *

(3)

The major market players in the

engine business Overview of the engine industry

Engine component suppliers Engine sub-system (module) providers OEMs

• Players specialize in specific engine modules and technologies

• Oligopolistic market structures

• High market entry barriers:

• High technological expertise required

• Substantial up-front investments required (R&D, royalty payments)

• Long-term agreements

• In part captive spare parts market

• Acceptance and certification requirements and approval by authorities

Increasing Partnership

(4)

0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 1980 1985 1990 1995 2000 2005 2010 2015 2020 2025 0 500 1000 1500 2000 2500 3000 3500

Passenger traffic forecast Passenger traffic 1980-2008 Aircraft deliveries

Aircraft firm orders

W orld r ev enue pas se nger K ilometers ( bn) Number of

civil transport jet aircraft

( Airliners , F reigh te rs & RJ s)

Forecast (4.7% p.a. growth) History

Source: MTU/ASM September 2009, Airclaims‘ CASE

Remark: Western-manufactured jet powered commercial transport aircraft are considered (Airliners, Freighters & RJs; turboprops, business jets, military and general aviation excluded)

(5)

Strategic pillars Strategic target fields

To shape our future, the MTU strategy is targeting profitable growth

in all business segments

Customers /

Partners Products Branding Shareholders Employees Locations

First-class technology Successful programs Growth via acquisitions Competitive cost structure Competence enhancement in market niches Strategic basement

Quality, Reliability, Speed, Productivity and Intercultural Expertise

~ 6 Bn.€ Sales 2018

EBIT > 12%

(6)

Quality, a management task

Mindset of organization MTU Board follows up KPIs Focus on selected KPIs

Monitor development of trends Quality audits and initiatives

(7)

CIP as an ongoing process throughout the complete organization

Improve price/ performance ratio

Dedicated projects to improve KPIs examples:

• strong improvement of TAT and OTD in MTU’s MRO locations • to become benchmark

• to win new contracts on the basis of best quality

(8)

MTU's Integrated Management System (IMS)

• Safety is a prime concern in aviation.

• The smallest of mistakes may have catastrophic

consequences. Therefore MTU insists on the finest quality of its products and services.

Quality and safety are the first priority in whatever we do.

MTU's Integrated Management System (IMS)

Quality Environmental

protection Occupational

health & safety

A world-class, efficient Integrated Management System (quality, occupational health & safety, environmental protection) that ensures that principles, objectives and

(9)

Production quality Process quality

Development quality

The key quality data / indicators have been continuously improved

1995 2005 Customer complaints (components) Scrap costs Rework costs

First pass yield (components/engines) DPM RPM Supplier performance Statistical process control (SPC) Compliance with development milestones Passed reviews

(design / production readiness)

First pass yield (Design)

Number of component mods Process maturity levels

EFQM result

(10)

MTU's system allows the key performance indicator information to

be viewed from different perspectives

A complete and consistent database for the generation of key indicators for different perspectives

Organization Product / program Process

GP 7000 GP 7000 • Management perspectiveCenter perspectiveTeam perspectiveEngineModuleDetail partBusiness processesMain processesPart processes

(11)

Highest priority on customer needs

Strong focus on on-time and on-quality delivery Implementation of best-practice processes in production and quality management

Intense oversight and training of our suppliers

Continuous improvements through people, processes and tools Highly qualified and trained personnel

Participation in national and international initiatives and working groups to develop internationally accepted standards

Cost optimization and quality do not have to contradict each other

Aviation safety is the first priority in whatever we do!

(12)

"Good is not good enough where better is expected."

(Thomas Fuller – English historian)

(13)
(14)

The relevant key performance indicators are consistently

reported 2

We use key performance indicators (KPIs) to continuously

improve our operational performance

The company's objectives are broken down into the operational units' objectives

In the event of deviations, corrective actions and failure analyses are initiated without

delay 1 Company Center Team Employee 3

Our Continuous Improvement Program (CIP) supports sustained process optimization 4

5 productive efficiency is The organization's improved, the objectives are adjusted

(15)

External consultants help with the optimization of selected KPIs

Result: TAT reduction by 26% achieved

(average out of

54 components)

-26%

Example: Project for the

reduction of turnaround time (TAT) in parts manufacturing

References

Related documents

Surgical versus non-operative treatment for lumbar degenerative spondylolisthesis: four-year results of the Spine Patient Outcomes Research Trial (SPORT) randomized and observa-

statin therapy on the risk for incident heart failure in patients with breast cancer receiving anthracycline chemotherapy: an observa- tional clinical cohort study. Bosch X, Rovira

In case of Banyumas Regency, with limitation in personnel number and local budget, basically the new performance appraisal system has not reach its objectives in

Physicians who participated in the online survey estimated that 18 –32% of patients diagnosed with non-IPF ILDs will develop a progressive fibrosing phenotype, defined as evi- dence

• Who has access to insider information • Difficulties in identifying insider trading Difficulties in identifying insider trading • Reasons for trading by insiders.. I id t di

a) The value of any cash on hand or on deposit, bills and demand notes and accounts receivable, prepaid expenses, cash dividends and interest declared or accrued as

Programs in the ACC inventory support activities in a wide variety of areas, including STEM curriculum development; teacher professional development, recruitment, and retention;