Goal of the Course
2011-9-23 2
n
after complete the course, you will
n
Understand hardware architecture of ZXSDR
B8200&R8860
n
Understand ZXSDR B8200&R8860 Device
installation specification
Internal Only?
Contents of the course
ZXSDR B8200&R8860 hardware introduction (4 -26)
ZXSDR B8200&R8860 installation specification (28 – 115)
Cable layout & labeling specification (115 – 134)
B8200+R8860 installation sketch map (135 – 143)
Site Swap Scenario (145 – 160)
Internal Only?
ZXSDR Series Integrated Base Station
n ZXSDR Series Integrated Base Station is a new generation of ZTE SDR-based
software platform for multi-mode base station products It include core unit
B8200, the indoor RF modules RSU40/RSU60, remote radio unit R8860 together constitute .Through the flexible combination of modules, to build indoor BS8800, outdoor S8900, distributed base station D-B8200, outdoor micro base stations, BS8906, to meet the requirements of the whole scene coverage, build GSM / UMTS-dimensional overlay network.
Internal Only?
BTS Overview
BS8200(BBU INDOOR) + R8840/8860(RRU OUTDOOR) = 8700 BTS
8700 BTS 8700 BTS
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Baseband UnitB8200
Site Alarm board Power Module
Control&Clock board
Fabric switch Baseband Processing board(GSM&UMTS)
Fan Module
Module Name Module Function Description
CC Control & Clock board FS Fabric Switch board
UBPG Universal Baseband Processing board for GSM BPC Base band Processing type C for UMTS
SA Site Alarm board
NIS Network Interface of STM-1 PM Power Module
FAM FAN Module
n B8200 Size 88.4mm × 482.6mm × 197mm (H×W×D) The weight of a fully configured cabinet is less than 8.75 kg
n B8200 adopts -48V DC power supply(-57DC~-40V DC) . If AC power should be adopted need to additional AC/DC rectifier module.
Gnd Point
Internal Only?
RRU Overview
RRU CLAMP RRU CLAMP
RRU Supporting Plate RRU Supporting Plate
Bolt with using all type Washer Bolt with using all type Washer
RRU Back side total assembly RRU Back side total assembly RRU Heat Sink RRU Heat Sink RRU Interfaces RRU Interfaces
Internal Only?
RRU Different interfaces
Internal Only?
B8200 Power Cable Introduction
n The especial power cable should be used to connect B8200 to DC cabinet, the
Internal Only?
B8200 SA Cable Introduction
n
B8200 SA cable
as show in nether figure
B1: Grounding Connector B2: E1/T1 transmission Connector B4: Alarm signal connector B3:RS232/RS485 connector
Internal Only?
B8200 RS232 Cable Introduction
n
RS232 cable connector is DB9 type
it should be connected to B2
connector of SA cable. The inverse terminal of RS232 cable should be
connector to DC cabinet. As show in nether figure 3.
Internal Only?
75Ω E1 cable introduction
1
n There are 2 types E1 cable: 75ohm and 120 ohm. Commonly, The 75ohm E1 cable should be used internal, the one terminal type of this cable is DB44 The inverse terminal should be separated to 2 cables(the terminal connector need to processed in site ),there are 8 slender cables to support 4 pairs E1 signal in each E1 cable , as show nether figure
Internal Only?
75Ω E1 cable introduction
2
Internal Only?
R8860
160mm 3 7 0 m m 320mm 1 2 3 4 5 6 7 8 9 1 0Number marker Interface
1 LC1 BBU RRU /RRU
2 LC2 RRU 3 AISG AISG 4 MON 5 PWR 6 RX 7 TX/RX / 8 RXout 9 RXin 10 GND n R8860 size 370mm × 320mm × 160mm (H×W×D) Weight:16.5KG n R8860 adopts -48V DC
power supply and
110/220 AC power supply
Internal Only?
R8860 cable introduction
Power connector
Alarm cable connector n The especial aviation
connector should be use in R8860 power cable, the connecter should be
connected to RRU power interface , the inverse
terminal are 4 core-cable(2 blue &2 black), the 2 blue to -48 port in OLP and the 2 black to -48 RTN port. As show in figure 1.
n The R8860 alarm cable
should be connected
between RRU and OLP , as show in figure 2.
Internal Only?
R8860 cable introduction
n The RRU AISG interface is 8 core aviation connector, The AISG cable
should be used to connected between RRU and ALPD or NSBT or RCU interface in antenna. As show in nether figure 3. The are 3 kinds AISG cable: 3m, 6m, 10m.
Internal Only?
Contents of the course
ZXSDR B8200&R8860 hardware introduction
ZXSDR B8200&R8860 installation specification
Cable layout & labeling specification
B8200+R8860 installation sketch map
Site Swap Scenario
Internal Only?
B8200 installation method
n
Having equipment room
•
Installed in existing 19’inch cabinet
•
Installed in facility rack on the wall
•
Installed in new 19’inch cabinet
•
Installed in especial 19’inch cabinet
n
Don’t having equipment room
•
Installed in BC8180 indoor
Internal Only?
Internal Only?
BBU Installation Method
n Installation at 19’ Rack Ø New Rack
Ø Existing Rack Ø Special Rack
n Wall Mount Installation.
n Installation at BBU Hub at Wall. n Installation at outdoor W121
Internal Only?
B8200 installation method 1A
Installed in existing 19’inch cabinet
n Installation requirement
•
The empty space is more than 5U in existing cabinet.n Strongpoint
•
Use existing cabinet, and save installation space.•
Save the grounding cable•
It is convenient and easy.n Attention
•
The power cable and signal cable should have different routing.Internal Only?
B8200 installation method 1B
Installed in new 19’inch rack
n Installation requirement
•
Before the rack , the operation space is more the 400mm. The space are more the 100mm in the both of rack flank, and convenient for aerationn Strongpoint
•
Supply new space for other transmission equipments.•
It is convenient and easy.n Attention
•
Have a right curving degree and nylon ties should be used for optical cable.•
The power cable and signal cable should have different routing.Internal Only?
B8200 installation method 1C
Installed in especial 19’inch cabinet
n
Installation requirement
•
Install support
accessory, board,
bracket to the right
position, as show in
figure 1
nStrongpoint
•
Same to in 19’inch
cabinet
nAttention
•
Credible grounding.
Internal Only?
Internal Only?
B8200 installation method 2
Installed in facility rack on the wall
n Installation requirement
•
Before the rack , the operation space is more the 400mm. The space are more the 100mm in the both of rack flank, and convenient for aerationn Strongpoint
•
No need space on the floor.•
PVC groove can be used on the wall•
It is convenient and easy.n Attention
•
Must insulated between rack and wall•
Have a right curving degree and nylon ties should be used for optical cable.•
The power cable and signal cable should have different routing.Cable laying
Internal Only?
Internal Only?
Internal Only?
B8200 installation method 3: Installed in BC8180 cabinet
n Installation requirement
•
When there is not enough space in BTS room, the BBU can be installed on the wall in narrow alleyway. The BC8180 cabinet can guard against thief and dustproof. But can’t be waterproof.n Strongpoint
•
Normal installation•
Easy to protect the equipment.n Attention
•
Must install it in waterproof place.•
The space are enough in the both of rack flank, and convenient foraeration.
BC8180 Cabinet BC8180 installation
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Internal Only?
B8200 installation method 4
Installed in W121 cabinet
n Installation requirement
•
This installation method can be action for no roomcondition.
n Strongpoint
•
It is easy to get thepower,W121 can support AC 220V and AC 380V.
n
Attention
•
Must take out dummy board before B8200 installation, if there are not equipment in cabinet, then the dummy board must be used at right slot.•
In cabinet, grounding point must be connected togrounding earth with 16mm2 cable.
W121 M02
Internal Only?
Installed in W121 cabinet –The requirement of cable routing
n The cable routing is extend down in M02 cabinet , as show in figure 1, there are three extending holes in the front of cabinet:
•
hole 1) : for cabinet grounding cable, transmission cable, and optical•
hole 2) : standby channel•
hole 3) : for power cablen there are two extending holes in the back of cabinet:
•
hole 1) : AC 220V power cable•
hole 2) : When battery should be used, the hole is for power cable and signal cable of temperature sensor. otherwise it is standby channel.figure1 extending holes in the front of cabinet:
Internal Only?
Installed in W121 cabinet –The requirement of sensor & cable
n The temperature sensor should be put in the back of M02 cabinet, “environment temperature”is showed on the sensor cable, before installation, the protection paper must be took out from sensor, as show in figure 1
n There is red cap on the smoking in M02, it must be took out before installation, in order to normal work. As show in figure 1.
Internal Only?
n The water sensor should be
installed in the bottom of M02 cabinet, and redundant cable must be tied orderly, as show in figure.
n B8200special power cable is
threaded in left hole, and connected to sixth port of W121. as show in figure 3.
Figure 2 . Water sensor in W121
Figure 3 . Special power cable connection
Internal Only?
Installed in W121 cabinet –The requirement of sensor & cable
n The one terminal of
RS232 cable is
connected to LPU, and inverse terminal is
connected to
surveillance interface of M02 through back hole. As show in figure 4.
Internal Only?
W121 M02 cabinet introduction
n DC W121 M02 cabinet just have
power cabinet and don’t have
battery cabinet, as show in figure 1.
n The inbreak, hot convection, LP
module alarm should be sent to
BBU through alarm jumper. Figure 1. M02 power cabinet
Figure 2. DC M02 cabinet Figure3. AC M02 cabinet
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Ponder
Question
n How to install the BBU on the wall when the wall is very weak
method
n The big wood board can be used and fix the board on the wall first, then fix
the BBU rack on the wood board, as show in figure 1.
n Make a support rack and install the BBU on the rack, as show in figure 2.
Internal Only?
R8860 installation method
n
Installed on the pole
•
Single RRU installation on the same pole
•
Double RRU installation on the same pole
•
Three RRU installation on the same pole
n
Installed on the wall
n
Installed on the rack
R8860 installation Attention:
•
Must shoes win convection place. And it is better
that put the RRU in shadow
•
The R8860 must be far away form the chimney
and rain dropping.
Internal Only?
Internal Only?
Internal Only?
R8860 installation method 1: installed on the pole
3 2 1
n The requirement of pole: the pole’s diameter must be 60mm 120mm
n R8860 installation position must be under ½ of pole. Because there are not any metallic equipments(except antenna) in the back of antenna, the R8860 and OLP must be put under the antenna on the same pole.
n The 16mm2 grounding cable must be connected to earthing system for R8860 and OLP. The cable length is less than 1m, and must keep within 2m, can’t connect OLP to R8860 and then R8860 to busbar with grounding cable.
Figure1. Single RRU installation on pole
i
Figure2 . Double RRU
Internal Only?
RRU assembling material
•Pic 1 is showing the assembly for RRU installation. 1. RRU Supporting plate.
2. Insulation bar. 3. Nut bolt assembly.
• Pic 2 is showing the set of nut bolts along with all washer.
Internal Only?
• Fixing Bracket assembly for pole mount installation.
• Total assembling of 1. Supporting plate, 2. clamp,
3. insulation pad and 4. nut bolt
RRU assembling material
1
2
3
Internal Only?
RRU installation Procedure
• First unpacked all the material from the box. And check whether the material are in good condition.
• Verify the material with the packing list. • Fix the supporting plate and clamp together with using the nut/bolt and use the washer in proper manner.
Internal Only?
Final assembly of supporting plate and clamp
• The complete assembly of supporting plate from front side
• The complete assembly of supporting plate from back side.
• The proper manner of nut/bolt and washer shown in the figure.
Internal Only?
Internal Only?
Ø 1.Perform the following steps to install the anchor ears.
1.M8×40 hexagon head bolt 2. Standard spring washer 3. Big washer 8
4. Insulation flange 5. Supporting panel
6. Insulation board 7. Long anchor clamp 8. M10×120 hexagon head bolt (full
thread) 9. Pole
10. Short anchor clamp 11. Flat washer10
12. Standard spring washer 10
13. I-type common M10 hexagonal nut
Internal Only? 2.Mount the ZXSDR R8841 C804 on the supporting panels and fasten the
cabinets with M6 safeguard screws as shown in the following:
Ø M6 safeguard screw Ø Supporting panel Ø Retaining board
Internal Only?
Internal Only?
Internal Only?
R8860 installation method 2: installed on the wall
n
R8860 can be installed on the wall, it is include indoor and out door wall.
Figure 1 . Installed on the outdoor wall
Figure 2. installed on the indoor wall
Internal Only?
Internal Only?
Internal Only?
R8860 installation method 3: installed on the rack
Figure 1. installed on the indoor rack
n
RRU can be installed on the indoor rack
One rack can support 4
RRU or 3 RRU& 1 B8200
But B8200 must be put in the facility
rack (box) then fix it on the rack. as show in figure 1
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Internal Only?
OLP installation procedure
Internal Only?
OLP assembling
Fix the OLP accessories like clamp on then back side of the OLP and tighten the screw
Internal Only?
OLP assembling(Outdoor Lightening Protection)
• Put the long nut bolt and support clamp and make for fixing the OLP on the pole.
• Be sure that all the washer has been used in correct sequence.
Internal Only?
OLP(Outdoor Lightening Protection) assembling
• Fix the OLP box on pole using the clamp and tighten all the nut bolt.
• The minimum distance between RRU and OLP should be 300mm.
Internal Only?
Power cable connection in OLP
• P1 port –For power cable
connection from OLP to DC PWR •P2 Port –For Power cable
connection from RRU to OLP
•ALM Port –For RRU MON cable connection.
•GND Port –For OLP grounding.
ALM
GND
P1
Internal Only?
Cable connection port at RRU.
• Connect 1 end of Power cable
connector to PWR port at RRU end, connect another end power cable to OLP. •For alarm cable connect one end of cable connector to RRU at MON port and another end to OLP at ALM port. •Same procedure we have to do for 2nd
Internal Only?
OFC Cable installation Procedure
OFC cable connection at RRU end
STEP1
• The OFC cable is very delicate cable handle it carefully.
• First take out one end of OFC cable from the role.
• First open the outer cap of OFC connector.
Internal Only?
STEP2
•Take out the softer part of OFC from outer cover by just lightly pulling.
Internal Only?
STEP3
•Remove the dust cover(white cap) from the OFC cable.
•Be aware don’t touch the top point OFC.
Internal Only?
STEP4
•Connect the OFC connector safely to the LC1 connector at RRU end. • Don’t bend the OFC cable at connector end.
Internal Only?
STEP 5
•Fix the outer cap and fasten it properly to the RRU.
• Make sure that OFC cable not getting bend more then its specified radius.
•Weatherproofing above the cap as per weatherproofing process.
Note:- Same procedure we have to follow for all sector RRU as well as for cascading.
Internal Only?
OFC Cable installation Procedure at BBU
OFC cable connection at BBU end
• Connect the OFC cable to BBU at FS board from right to left.
• First sector OFC cable should be connect in the right most optical port.(Marked as RX0 and TX0)
Internal Only?
Cable lugs making
1 2
4 1. Cut the outer coat the cable. 2. Wearing lugs.
3. Crimp the lugs properly.
4. Use Proper crimping tool for crimping the lugs 5. Paste the protected sleeves with the hot gun.
6. Same process follow for All power & grounding cables
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Page 96
Preparation and Specifications of Antenna Feeder Connector —
7/8 DIN Feeder Connector
2. Straighten the feeder to be installed with the connector and strip off a section of sheath of the feeder with a guarded knife. Keep the notch flat when stripping the feeder.
3. At the place about 28 mm away from the stripped point, cut off the feeder with a Andrew Cutter or other Feeder cutter tools. The section must be flat and on the wave crest of the feeder.
Internal Only?
Page 97
Preparation and Specifications of Antenna
Feeder Connector — 7/8 DIN Feeder Connector
4. Use the expansion tool to expand the external conductor of the feeder. If the inner or external conductor of the section of the feeder has burrs, use the file to remove the burrs.
Internal Only?
Page 98
Preparation and Specifications of Antenna
Feeder Connector — 7/8 DIN Feeder Connector
5. Use a brush or tape to remove the debris of the connector. Before
installing the connector, unscrew the connector first.
Internal Only?
Page 99
Preparation and Specifications of Antenna
Feeder Connector — 7/8 DIN Feeder Connector
6. Manually screw the connector on to the feeder. Use one spanner on the connector cap and remain steady, and use another spanner to fasten the screw.
Internal Only?
Page 100
Preparation and Specifications of Antenna
Feeder Connector — 7/8 DIN Feeder Connector
7. By now, installation of the feeder connector is completed. Before
connecting the jumper, use a plastic bag or tape to cover the feeder
Internal Only?
Weather proofing on connectors
• All the outdoor connectors like RRU, Antenna etc connectors need to do the weather proofing as per standard.
• The procedure for weather proofing is
1-Three layer of insulation tape.(down to top>top to down)
2- Three layer of weather proof. (down to top>top to down)
3- Three layer of insulation tape. (down to top>top to down)
After completion of process need to put three ties.
Internal Only?
Internal Only?
Outdoor Lightning Protection Box(OLP)
n The OLP support DC -48V and AC 110/220V, the two kinds of OLP: DC
OLP and AC OLP.
n R8860 surveillance cable should be connected to OLP with one pairs(white
and brown), other cable can be put it , as show in nether figure 1 & 2.
Figure 1. OLP outside configuration
Internal Only?
Question
n
Can we install the RRU on the back of antenna when pole is very
short
Answer
n
Can’t do it
reason
n
Because antenna is a radiation equipment, the metallic equipment
can’t be put on back of antenna, otherwise the metallic equipment
shall affect antenna eradiation wave,.
Internal Only?
Ponder
Question
n
How to connect the power cable when AC RRU is installed in
building
Answer
n
No need the LP when RRU is installed in building.
n
W hen RRU is near the ACDB, we can connect it to ACDB with
special power cable.
n
If the distance is long between RRU and ACDB, we can add a new
air-break or ACDB near RRU, first connect the air-break & ACDB
to main ACDB with ordinary AC power cable, then connect RRU to
air-break & new ACDB with special power cable.
Internal Only?
The fiber cable between BBU & RRU
n
Fiber cable connector is form factory LC/PC-LC/PC) , at the end of
the RRU, the connector have waterproof function .
n
W hen fiber cable connect to BBU, the cable order must be right, the
cable must be connected to TX0/RX0 on FS board form sector A
others are one by one.
Internal Only?
Jumper and feeder installation
n ½ jumper have 3 kinds 2m? 3m? 5m).
n commonly ,R8860 should be installed near the antenna the feeder choice and
grounding standard is showed in nether frame :
L type grounding
L<=5M ½ jumper No grounding 5M<L<=1
0M 1/2” feeder One grounding 10M<L<=
20M
1/2” feeder
Two grounding 20M<L<=
60M 7/8”feeder Three grounding
Internal Only?
Antenna installation
Antenna installation
Antenna azimuth, down tilt angle shall accord with the engineering design requirements.
The feeders shall be connected correctly to the correct sectors.
nThe vertical isolation of 2 G and 3G antennas could not less than 0.2m.
Internal Only?
R8860+RET installation Scenario 1
n
When R8860 is near the
antenna, and the distance is
less than 10m,the installation
plan is
•
When RRU and RET are
installed on the top of the
building, the feeder system
include RET antenna,
ALPD,RCU, AISG control
cable, AISG power cable and
feeder.
•
If the antenna is installed in
the building or low position,
the ALPD don’t be used,
antenna can be connected to
RRU with AISG cable
directly, as show in figure 2
1 RRU+ +RCU+ALPD
2 RRU+ +RCU
BBUB RRU
RCU
AI SG cabl e
Internal Only?
R8860+RET installation Scenario 2
n
W hen 3 antenna are near each other, as tower site, we can hold this
plan, as show in figure 3.
Internal Only?
R8860+RET installation Scenario 3
n
W hen RRU is installed far
from antenna, and the
distance is more than
10m, the feeder system
include ret antenna? RCU
? NSBT? ASBT? AISG
control cable? AISG
power cable and feeder.
According to the standard,
it is required that NSBT
and ASBT should be both
installed on the master
channel (TX/RX) of the
antenna.
Internal Only?
R8860+RET installation Scenario 4
When 3 antenna
are near each
other, as tower site,
we can hold this
plan, as show in
figure 3.
Internal Only?
R8860+RET installation Scenario 5
n When the distance is more than
60m, The feeder system include RET antenna, RCU? NSBT? ADTMA? AISG control cable? AISG power cable and feeder, as show in figure 3. R8860 RF
interface should be connected to feeder with NSBT, R8860 AISG interface is connected to NSBT with AISG cable. ADTMA AISG interface is connected to RCU with AISG power cable.
Internal Only?
The air-break requirement for B8200&R8860
For Your Information
n
B8200
10A or 16A air-break
n
Just 1 R8860 10A or 16A air-break
n
Two R8860
32A air-break
Internal Only?
Ponder
Question
n
W hen antennas were installed on the mono pole or three leg
tower, How to install the RRU?
Answer
n
Suggest to add new pole(60mm=D=120mm) at foot of tower, or
add especial support rack
3 R8860 and OLP can be installed on
the pole or rack. when the distance is less than 20m, RRU can be
connected to antenna with ½ feeder directly.
Internal Only?
Contents of the course
ZXSDR B8200&R8860 hardware introduction
ZXSDR B8200&R8860 installation specification
Cable layout & labeling specification
B8200+R8860 installation sketch map
Site Swap Scenario.
Internal Only?
Cables bundling requirement
扎带
n Cables must be bundled neatly and close to each other.
n To avoid core breaking, the ties shall be bond at the two sides near the bundle bend rather than at the bend.
n The cables shall not loosen in the ties. The cable ties shall face a consistent direction. The intervals between the ties shall be even and tidy (usually 300mm~1000mm).
n The surplus part of the tie shall be cut off. For the tie inside the cabinet, the surplus part shall be completely cut off from the buckle. For the tie outside the cabinet, the surplus part shall be neatly cut, with 2mm left from the buckle.
White ties shall be used inside the cabinet while black ties used outside the cabinet.
n Power cables, ground cables and signal cables shall be laid separately along the two sides of the cable tray.
n The cable surface shall be clean, without engineer marks. The insulating layers of protective tubes shall have no scratches or signs of damage.
Internal Only?
Waterproof method
n In the feeder system, some
position must be Waterproof disposal, that include the
connector with antenna & jumper cable, connector with jumper & feeder cable, grounding points on feeder, RRU connector. Outdoor waterproof treatment: The connection between 1/2 inch jumper & 7/8 inch feeder shall have reliable waterproof
treatment: they shall be wrapped in the mode of “1 layer of vinyl electrical tape - 3 layers of rubber mastic tape - 3 layer of vinyl
electrical tape”, And finally, both ends of the connectors should be bound with black ties.
n No need waterproof disposal for
Internal Only?
Labeling
ZTE Special Sticker
Listed On Label
n There are two types of label, indoor label & outdoor plastic tag.
The indoor labels should be standard ZTE private stickers, and should be printed on site, as Figure 1, outdoor plastic tag as figure 2;
n Indoor labels be used to mark indoor equipments, include cabinet, Ethernet cables, indoor fiber tails ,and digital trunk cables. plastic tag be used to mark outdoor cables, include outdoor power
cables, outdoor fiber tails, feeder, and outdoor grounding cables and so on.
n The labels should be pasted in the same direction, with the side indicating the cable direction upward or facing the maintenance and operation plane for the convenience of reading.
n About the content of ZTE private label please refer to section
BS8800/BS8900 of <<SDR base station engineering cable labeling>>,if needed according to actual situation to do some modification? addition? deletion.
n More detail specification about label paste please refer to<<GSM engineering cable label specification>>
Internal Only?
Internal Only?
Internal Only?
Internal Only?
Continued….
DG Labeling on BBU
Internal Only?
Distance between DCDP4 & BBU
Min/Max gap should be 4 hole between DCDP4 & BBU for future maintenance. At pic shown 2 gap
Internal Only?
BBU Power cable labeling
BBU DC -48V Power
Internal Only?
Internal Only?
Internal Only?
RRU & OLP Labeling
PGND
S2-PWR
ALM
Internal Only?
Internal Only?
Extra Optical Fiber
Extra Optical Fiber cable have to be
kept inside shelter & should not kept with other cables.
Internal Only?
BBU cable routing
Power cable direction upward
E1 cable routing direction downward
Internal Only?
Contents of the course
ZXSDR B8200&R8860 hardware introduction
ZXSDR B8200&R8860 installation specification
Cable layout & labeling specification
B8200+R8860 installation sketch map
Internal Only?
B8200+R8860 installation sketch(1)
Explain
n
Installation location
3 pole the top of the
building; on the tower
n
R8860 is outdoor and
near antenna(D=5m),
and DC power
support.
nR8860 is connected
to antenna with ½
jumper or feeder.
n
The OLP is near
R8860
R8860 have
special power cable
and that is less than
2m.
Internal Only?
B8200+R8860 installation sketch(2)
Explain
n Installation location just for
1 pole the top of the building for 3 antenna.
n R8860 is installed at the foot
of the tower 3 R8860 is at the same position and the distance is far from RRU to antenna(D= ), and DC
support.
n From antenna to RRU,
“1/2jumper+feeder+1/2jump er” is used.
n Just 1 busbar for all of the
equipments outdoor.
n The OLP is near R8860
R8860 have special power cable and that is less than 2m.
Internal Only?
B8200+R8860 installation sketch(3)
Explain
n
Installation location
3 pole are different position each other on the top of the building for 3 antenna. On the towern R8860 is installed near antenna (D=5m), and AC support.
n R8860 is connected to
antenna with ½ jumper or feeder.
n The AC OLP is near R8860
R8860 have special
power cable and that is less than 2m.
n No need the AC ILP, the
cable connect to ACDB directly.
Internal Only?
B8200+R8860 installation sketch(4)
Explain
n Installation location indoor and outdoor site
n R8860 is installed indoor and near BBU and DCDB.
n From antenna to RRU,
“1/2jumper+feeder+1/2jumpe r” is used.
n R8860 is in door, and no need LP, if multi-RRU are installed at same place, need to add a DCDB.
n Sometimes, ILP can be used to replace DCDB, but the ILP must be connected to busbar with 16mm2 cable.
Internal Only?
B8200+R8860 installation sketch(5)
Explain
nInstallation location
indoor site n R8860 is installed indoorand near BBU and ACDB. AC support
n R8860 is connected to
indoor distributing signal-cover system with feeder.
n R8860 is in door, and no
need LP, need to add a ACDB.
Internal Only?
B8200+R8860 installation sketch(6)
Explain n Installation location indoor distributing signal-cover system site n R8860 is installedindoor and near BBU and DCDB. DC support
n R8860 is connected to
indoor distributing
signal-cover system with feeder.
n R8860 is in door, and no need LP, need to add a DCDB.
Internal Only?
B8200+R8860 installation sketch(6)
Explain
n Ordinary 2-core DC cable have 3 kinds 4mm2? 6mm2 and 10mm2 choice
standard is showed in nether frame:
R8860 amount Length Category
1 R8860 0<L<=120m 4mm2 120<L<=180m 6mm2 180m<L<=310m 10mm2 2 R8860 0<L<=60m 4mm2 60<L<=90m 6mm2 90m<L<=150m 10mm2
Internal Only?
B8200+R8860 installation sketch(6)
The existing optical
cable should be used for BBU and RRU
a
% 5 2 ' ) 2 ' ) $ % % % 5
n
If the some BBUs are installed at the same place, and RRU is far from
BBU, we can use existing backbone fiber network to connecting BBU and
RRU. As show in Figure 1 and 2.
Internal Only?
B8200+R8860 installation sketch(6)
The existing optical
cable should be used for BBU and RRU
b
n
we can use existing backbone fiber network to connecting a RRU series
network. As show in Figure 3
Internal Only?
Contents of the course
ZXSDR B8200&R8860 hardware introduction
ZXSDR B8200&R8860 installation specification
Cable layout & labeling specification
B8200+R8860 installation sketch map
Internal Only?
Course Review
review
n
ZXSDR B8200&R8860 hardware
configuration
n