• No results found

Experimental technique for antiproton-nucleus annihilation cross section measurements at low energy

N/A
N/A
Protected

Academic year: 2020

Share "Experimental technique for antiproton-nucleus annihilation cross section measurements at low energy"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Experimental layout. A vacuum chamber contains the target held by a movable arm
Figure 2. Right top: detail of the edge of one scintillating bar used in the detector: a hole along the bar axis isgrooved to host the WLS fiber, while the one visible in the upper part is filled with glue once the fiber has beeninserted
Figure 3. Right: a photo of one of the front-end boards which have been designed for the detector
Figure 4. Details of the digital acquisition scheme. The output consists in a 512 bit string for each channelrepresenting its time-over-threshold status.
+2

References

Related documents

Factors, Practices, and Policies Influencing Students’ Upward Transfer to.. Baccalaureate-Degree Programs and

Berikut ini adalah grafik yang menunjukkan pengaruh h/d dan bentuk gelombang (H/gT 2 = wave steepness) terhadap koefisien transmisipada percobaan dapat dilihat pada

ACCA Accredited Employer status: In order to show that the employer and their training supervisor are competent to provide training towards the ACCA Accounting

likely to be handicapped than a child of like birth weight born to a mother without. such

According to the findings on objective three, the statutory protection to the right to privacy against mobile phone usage does not provide direct clue as majority of the

The PROMs questionnaire used in the national programme, contains several elements; the EQ-5D measure, which forms the basis for all individual procedure

The number output voltage levels of cascaded Full H-Bridge are given by 2n+1 and voltage step of each level is given by Vdc/n.. Where n is number of H-bridges connected

The summary resource report prepared by North Atlantic is based on a 43-101 Compliant Resource Report prepared by M. Holter, Consulting Professional Engineer,