Installation of smart meters
YOU CAN’T MANAGE WHAT YOU DON'T
MEASURE….
W. EDWARD DEMIN
Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF
Monitoring
Options
Product
Criteria
selection
Option 1
Currentcost
•
Lower cost
•
Lower cost
•
Best utilities
Option 2
Ecobox
Option 3
Efergy
Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF
Monitoring: devices
Main advantage:
discriminate consumption by services
Per
Per
electrical
circuits
Per each
equipment
or appliance
or appliance
(fridge, …)
Monitoring: Selection of WP6 experiment dwellings
Before installation
1
. Meeting to
RE from de latin “re” ,
it means repetition
1
. Meeting to
the Neighborhood
Representative Committee
(representing the
neighborhoods)
2
. Household survey
3
. Neighbourhood
volunteers
for monitoring
Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF
it means repetition
NATO from de latin “natus” ,
it means born
Mascot for the Awareness Campaign
for monitoring
4
. Signed Authorization
by homeowners
Monitoring: Household survey
500 surveys
In a regional level
40 household
survey (of 56)
71% participation
Results of the questionnaire to households participating in
WP5 to select the ones participating in WP6
SMS 80%
Internet 43%
None 20%
Usage of social and entertainment media by adult members of household
0% 20% 40% 60% 80% 100% Usage of social and
entertainment media by adult members of househol d
None Internet SM S
Household appliances in use
Programmabe controllers 0% High energy class appliances 33% Low energy class appliances 68%
Use of home automation
None 100%
Simple 0%
Sophisticated 0%
Use of energy saving lightning
NO 25%
YES 75%
Heating, cooling and DHW
0% 20% 40% 60% 80% 100% Household appliances in
use
Hig h energy class appli ances Low energy class appli ances
0% 20% 40% 60% 80% 100%
Use of energ y saving lightning NO
YES
Gas natural
Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF
Heating, cooling and DHW
Stand-alone electric heating 28% Air-conditionaing 73% Electric bolier DHW 20% Gas natural 63% Central heating 0%
0% 20% 40% 60% 80% Heating, cooling and
DH W
Gas natural
Electric bolier DH W
Monitoring: basic modul
CE Approvals:
ETSI EN 300 220-2 V2.1.1(2006-04), EN 50371 2002, EN 301489-3
v1.4.1 2002-08, EN 60215:1989+A1:1992+A2:1994, IEC
60950-1:2001(1st Edition) and/or EN 60950-1:2001+A11:2004
Monitoring: NET SMART
Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF
Steps: monitoring
Date
Apartament
block
Number of
dwellings
monitorization
July/August
2012
Fontanares
8
Pio XII
7
Total
15
Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF
Devices installed
EACH DWELLING
1 monitor- interface
A general monitoring of the dwelling
6 DWELLINGs
1 Transmitter
Or more (2)
Monitor per electrical circuits
kitchen appliances, lighting,…)
5 IAMS (INDIVIDUAL APPLIANCE
1 net smart
5 IAMS (INDIVIDUAL APPLIANCE
MONITOR)
Monitor or per each equipment
or appliance (fridge, every light…)
Manual and
verbal instructions
Personalization
Instructions, more simple
Instructions, more simple
Time clock
Chanels for equipment
or appliance
Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF
Identification
And contact (email, tel.)
Template for
data collection
Identification
devices and services
Monitoring PIO XII: install process
Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF
Monitoring + audit
Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF
Monitoring: input Consumption bills
1. Collecting consumption
bills of the household
monitorized.
2. Analyse utility bills
3. Compare to data of
monitoring
Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF
Monitoring: Manage the information
Conection
Download by
Number
Frecuency
USB
VISITE
10
DWELLINGS
Once every
2 months
INTERNET
REMOTE CONTROL
6
DWELLINGS
2 fontanares
2 fontanares
4 PIO XII
Consumption for month,year:
total, washing machine,
Personalized report
Bulletin on
energy efficiency
total, washing machine,
refrigerator, air
conditioning,…
Evolution energy
consumption in a day,
month,…
Projet financé par le Fonds Européen de Développement Régional - FEDER Project co-financed by European Regional Development Fund - ERDF