PPT Dutch offshore

wind sector

Een presentatie over een

presentatie…

Agnes Agterberg

RVO

(2)

Inhoud

• Aanleiding PPT Dutch offshore wind sector

• Betrokken partijen

• In vogelvlucht door de PPT

• Vervolg

(3)

Offshore wind farms in the world

(4)

>

>

(5)

Behoefte aan promotiemateriaal Dutch offshore

wind sector > PPT

(6)

Betrokken partijen

• RVO

– Onderdeel ministerie van Economische Zaken

– Ondersteunt offshore wind sector bij internationalisering, o.a.:

Postennetwerk

Missies

Regelingen (PIB)

• TKI Wind op Zee

• Holland Home of Wind Energy

• Externe adviseurs:

– Chris Westra

– Jos Beurskens

(7)

Why explore

the Netherlands

for offshore

(8)

Index

Introduction to the Dutch offshore wind energy sector

Realising offshore wind farms

Domains for building offshore wind farms

Dutch Champions

>

>

>

>

(9)

The 4 pillars of

Dutch offshore

wind energy

(10)

1. Impressive track record

(11)

2. In depth knowledge

(12)

3. Practical experience

Introduction to the Dutch offshore wind energy sector

(13)

4. A solid government policy

(14)

In Europe, UK, Germany and

the Netherlands expected to have largest

offshore wind capacity by 2022

Offshore wind in operation 2015

Offshore wind forecasted end 2022

Introduction to the Dutch offshore wind energy sector

(15)

The Dutch offshore wind farms

(in operation and in preparatory phase)

Gemini 600 MW (2016)

Luchterduinen 129 MW (2015)

Princes Amalia 120 MW (2007)

OWEZ 108 MW October (2006)

Hollandse Kust Noord 700 MW (2019)

Hollandse Kust Zuid 2 x 700 MW (2017-2018)

Borssele 2 x 700 MW (2017-2018)

www.noordzeeloket.nl

1

2

3

4

5

6

7

1

4

2

3

5

6

7

(16)

Development and project management 2%

Wind turbine supply 26%

Balance of Plant 19%

Dutch contribution to the supply chain

From supply to value

Operation, Maintenance & Service 35%

Installation and

Commissioning 14%

Operation,Maintenance&minorservice +++

Majorservice ++

O,M&S;other ++

Turbineinstallation + Foundationinstallation + Subseacableinstallation +++ Installation;other +

Subseaexportcables +

Subseaarraycables

Substations +

Foundations +++

BalanceofPlant;other

Turbineassembly 0

Blades +

Castings&Forgings 0

Drivetrain 0

Tower +++

Turbine;other

Windfarmdesign ++

Surveys +++

Project;other

Realising offshore wind farms

• % refers to share in costs of realising offshore wind farms

(17)

The supply chain of offshore wind energy

1. Development & Project management

2. Wind turbine supply

3. Balance of plant 4. Installation & Commissioning

5. Operation,

Maintenance & Services

6. End-of-life solution

• Wind farm design • Surveys

• Project; other

• Wind turbine assembly • Blades

• Castings & Forgings • Drive train

• Tower • Turbine; other

• Subsea export cables

• Subsea array cables • Substations • Foundations • Balance of plant; other • Turbine installation • Foundation installation • Subsea cable installation • Installation; other

• O&M & minor service • Major service • O, M & S; other

• Repowering • Recycling

• Restoration sea bed

In the following slides Dutch companies active in the domains of the supply chain are listed

(18)

Surveys

Environmental Impact assessment (EIA)

Morphology & Geophysical

Wind & Waves

Companies and institutions

BOC Metocean / BMO offshore / Fugro / Deltares / Grontmij / Dutch Drilling

Consultants / Pondera / Royal Haskoning DHV / Ecofys / Windminds / ECN / Imares

/ DNV GL – Energy / TNO

Domains for building an offshore wind farm in more detail

Photo: ENECO

1. Development & Project management 2. Wind turbine supply 3. Balance of plant 4. Installation & Commissioning 5. Operation, Maintenance & Services 6. End-of-life solution

(19)

Blades

Structural and aerodynamic design

Design of manufacturing processes

Repair and maintenance

3D structural testing

Companies and institutions

WMC / TRES4 B.V. / We4Ce / LM Wind Power * / Pontis Engineering BV / Bright

Composites / Suzlon *

We4Ce

1. Development & Project management 2. Wind turbine supply 3. Balance of plant 4. Installation & Commissioning 5. Operation, Maintenance & Services 6. End-of-life solution

(20)

Foundations

Monopiles & transition pieces

Floating structures

Gravity based foundations

Mooring

Companies and institutions

Sif Group / Smulders / Iemants / Marin / van Oord / MonoBase Wind Vrijhof Anchors

/ VDS Staalbouw

Domains for building an offshore wind farm in more detail

Photo: Smulders

1. Development & Project management 2. Wind turbine supply 3. Balance of plant 4. Installation & Commissioning 5. Operation, Maintenance & Services 6. End-of-life solution

(21)

Substation installation

Support structures for substations

Companies and institutions

Heerema / Strukton / Seaway Heavy Lifting / Jackup Barge

TenneT TSO Gmbh

1. Development & Project management 2. Wind turbine supply 3. Balance of plant 4. Installation & Commissioning 5. Operation, Maintenance & Services 6. End-of-life solution

(22)

O&M & Services

O&M optimisation

O&M planning

Condition monitoring

Access technology

Maintenance

Companies and institutions

Outsmart / BLIX / ECN / Ampelmann operations / Z-technologies / Van Aalst / TNO /

Bosman Inspecties / Damen / Niron Staal/ VDS Staalbouw / MME Group / Ned

Marine Services BV / Croon BV

Domains for building an offshore wind farm in more detail

1. Development & Project management 2. Wind turbine supply 3. Balance of plant 4. Installation & Commissioning 5. Operation, Maintenance & Services 6. End-of-life solution

(23)

The Netherlands ranks second in the offshore industry’s turnover

Top 5 players in each section of value chain (2010

-

2014)

1

2

3

4

5

Source: Roland Berger
(24)

Fugro Van Oord

VBMS

Cable laying

Van Oord / VBMS / Fugro

Experience in intertidal waters

(25)

Design of special vessels

Gusto-MSC / Damen

Designs used all over the world

(26)

Designing special handling tools

Royal IHC

Hammering of piles, noise mitigation

equipment

Dutch Champions

Royal IHC
(27)

Lifting of heavy foundations

and substations

Heerema / Seaway Heavy

Lifting

(28)

Education, Training and Research

TU Delft / ECN / TNO / Deltares /

Marin / IMARES

Research and developing activities

covering the entire supply chain.

From fundamental research to

engineering science Education

(PhD’s to technicians) and training

Photo: Jos Beurskens Photo: Jos Beurskens

(29)

Thank you

for your attention!

Contact: RVO +31 (0) 88 042 42 42

For details of the Dutch companies see:

https://sct.tki-windopzee.nl/sct

(30)

Vervolg

• Online beschikbaar:

– Nu:

http://english.rvo.nl/file/presentation-offshore-wind-energy-netherlands-2015pptx

– Vanaf 2016: http://www.hollandtrade&invest.com/

• Publiek, open

• Individuele partijen in Supply Chain Tool TKI Wind op Zee

– https://sct.tki-windopzee.nl/sct

(31)

http://english.rvo.nl/file/presentation-offshore-wind-energy-netherlands-2015pptx

(www.hollandtrade&invest.com)

(32)

https://sct.tki-windopzee.nl/sct

(33)

Vragen?

Contact:

References

Related documents

Continuing to Acquire Communication Skills 

Intensive inpatient treatment for adults and youth – Outpatient treatment - Youth Recovery House-Relapse specific group - Gender specific elders groups – Pregnant Post Partum group

After the war, sales of whisky increased virtually every year until 1980, but for the next few years, sales dropped dramatically, leaving a whisky surplus and, inevitably, this led

Workshop presented at the 2003 Utah State University Family and Consumer Science Extension Agents Annual Conference, February 20, 2003, Kayesville, UT.. The Impact of Business

Statistical results of a simple main effects test contrasting stage survival of Metacarcinus magister larvae given experimental diet treatments (unfed vs. algal-fed) at

Game Designers, Game Developers, Game Project Manager, Game Programmer, Level Designers, Game Testers, Web/Mobile Apps Developers, Multimedia Developers, Lead Tools

15 To date, this is the first systematic review of the evidence about the effects of novel psychoactive substances on the mental and physical health of people with severe