Data Center Efficiency 101

What Sustainability Managers

Should Know

Mike Walker, President, AlterAction Inc. (An ENERGY STAR Technical Support Contractor)

(2)

Second Nature and the ACUPCC

W

HO

A

RE

W

E

?

Second Nature is a Boston-based non-profit with the mission to proactively build a sustainable and positive global future through initiating bold

commitments, scaling successful actions, and accelerating innovative solutions among leadership networks in higher education.

The American College & University Presidents’ Climate Commitment (ACUPCC) is a signature program of Second Nature.

•  High-visibility effort to address global climate disruption

•  Network of +680 Colleges and Universities

•  Commitment to eliminate net GHG and embed sustainability in their

(3)

Data Center Efficiency 101

What Sustainability Managers Should Know

Gabriela Boscio

Manager, Communications and Education Second Nature

Mike Walker

President, AlterAction Inc.

(An ENERGY STAR Technical Support Contractor)

(4)

Who are we?

Work on behalf of EPA’s ENERGY STAR

program as “technical support contractors”

3 core areas of expertise:

–  Large scale “human behavior change”

–  IT management & consulting

–  Energy efficiency, sustainability

Vendor/product/solution neutral

(5)

We are here today because

data centers...

1.

Consume a lot of energy

–  Energy consumption grew:

•  200% from 2000-5

•  36% from 2006-10

–  2% of electricity in US

2.

Can be made far more

efficient

–  Efficient data centers can use up to 80% less power

(6)

Server rooms/closets in

commercial buildings

Typical office building:

23%

of annual energy costs

High efficiency office building:

40-50%

(7)

Savings remain untapped

ü

Split incentives

ü

Risk aversion

ü

Some solutions require new

(8)

Presentation Goals

1.

Identify drivers of energy costs

2.

Provide non-technical overview of measures

3.

Empower managers to spot opportunities

(9)

Server rack vs. barbecue grill

•  Industrial Light & Magic deployed 84 blade servers/rack. Just 1 rack…

–  Uses 28 kW

–  Requires 8 tons of cooling

–  Generates heat = 4 Weber Spirit gas grills

(10)
(11)

Data center energy savings: 3

areas of opportunity

1.

IT equipment

2.

Airflow management

(12)
(13)

Eliminating unused servers &

systems

•  Opportunity: –  8-10% of servers performing no useful function •  Why?

–  Good at provisioning, not so much at decommissioning

•  Solution?

–  Take inventory

–  Identify, remove comatose servers

•  Eliminating one server can save

$2500/year in energy, software

(14)

Consolidating lightly utilized

servers

•  Due to traditional one workload, one box approach

–  More than 90% of all x86 servers run at <12% utilization

–  Typical server runs at < 6% utilization •  Four smarter approaches:

–  Combine apps onto a single server/operating system instance

–  Reduce redundancy by clustering servers

–  Downsize application portfolio

(15)

What is a “virtual machine?”

Software that simulates

server hardware & OS

Allows for multiple

concurrent OS instances

on a single “box”

Improves scalability,

reduces downtime, and

enables faster

(16)

Virtualization, cont.

•  Cuts energy consumption by 10-40% •  Ubiquitous: –  92% of large data centers –  37% of small data centers
(17)

Virtualization reduces total

cost of ownership

•  SWIC had 35 physical servers •  Virtualization effort led to 35 virtual machines on 4 virtual hosts (physical servers)
(18)

Right-size new servers

Are you fully utilizing what’s already deployed?

Avoid “oversizing”

–  Don’t buy a tour bus when the workload calls for golf cart

(19)

Data storage – more efficient

technology

Lower speed disk drives, smaller drive

platters

Massive array of idle disks (MAID)

–  Only those disk drives in active use are spinning at any given time

Solid state storage (SSDs)

–  No mechanical parts

–  Startup (OS) disks are good candidates

(20)

Data Storage Resource

Management (SRM) tools

•  Deduplication removes duplicate files

•  Automated provisioning improves storage utilization

•  Thin provisioning provides just-enough, just-in-time storage

•  Tiered Storage matches storage technology to access

(21)

What is a Uninterruptable

Power Supply (UPS) system?

•  Provides power until emergency generators come on line •  Corrects for power surges, voltage drops, and frequency distortions

(22)

Exelon: UPS Change Improves

Efficiency & Redundancy

•  Increasing “load factor” boosts efficiency

•  Example: Exelon

–  Before: two 1000 kVA UPSs in parallel run at low load

–  After: four smaller

(750 kVA) UPSs run at higher load

(23)

Save energy with ENERGY

STAR qualified UPSs

Cut energy losses by 33-55%

Variety of types available:

–  Traditional “double conversion” UPSs

–  Modular UPSs (pictured) maximize the “load factor”

(24)

ENERGY STAR UPSs made by

leading manufacturers

(25)

ENERGY STAR certified data

center products

Large network equipment

Storage Uninterruptible Power Supplies (UPS)

(26)

New ES servers can consume

54% less power

(27)

ENERGY STAR qualified

servers

Eligible servers:

–  Blade, multi-node, rack-mounted, and pedestal

–  ≤ 4 processor sockets per server (or blade/node)

Requires:

–  Efficient power supplies

–  Low power draws when server is at “idle”

–  Advanced power management features

–  Server Efficiency Rating Tool (SERT) test results

(28)

ES servers made by leading

manufacturers

(29)

Data center energy savings: 3

areas of opportunity

1.

IT equipment

2.

Airflow management

(30)

Raised floor environment

(31)

Proper hot aisle/cold aisle

orientation can save 5-12%

(32)

Cold aisle

containment

further

reduces mixing

•  Some hot air is still mixing with cold air

•  Containment can save:

(33)

Airflow management

strategies

Grommets minimize air Variable Speed fan Drives (VSDs) in CRACs Adequately sized return plenum or ceiling height Adequately sized supply Appropriate pressure in Rigid enclosures (“containment”)

eliminate mixing Hot aisle / cold aisle layout

(34)

Airflow management devices:

blanking panels

Maintain the

separation of hot

and cold air in a

rack

A single 12”

blanking panel

can yield 1-2%

energy savings

(35)

Airflow management devices:

floor grommets

Improve cooling

efficiency by sealing

areas where cables

enter & exit plenums

(e.g., a raised floor)

Less leakage helps

direct more cold air to

the equipment that

(36)

Airflow management devices:

structured cabling

(37)

QTS conducted an extensive

air flow assessment

Removed obstructions to vented tiles, (e.g.,

cabling)

Closed vented tiles that were not in use

Installed self–sealing grommets

Used vinyl covers to seal gaps in doors, pipes

(38)

Variable Speed Drives (VSDs)

CRAC fans use 5-10%

total data center energy

Fan/pump power varies

with the cube of speed

–  Translation: 1/2 the speed

uses 1/8 the power!

Other EE measures

(39)

VSD considerations

Reduced fan speed in retrofits can cause

condensation and freezing on the coils

–  New CRACs with VSDs have digital compressors that slow

down with fan speed

VSDs can affect

power quality w/

harmonics

–  eBay needed 16 225-KVA harmonic

(40)

eBay installed VSDs on 83

CRAH units

(41)

Data center energy savings: 3

areas of opportunity

1.

IT equipment

2.

Airflow management

(42)

Turn up the heat!

Server inlet temps as low

as 55°F??? That’s old

school!

In 2008, ASHRAE

recommended 64 to 81°F

Save 3% to 5% in energy

costs for every 1°F

(43)

Today’s servers can stand the

heat. Safe operating ranges:

Sun Blade (40° to 90°F)

Dell Blade (50° to 95°F)

IBM Blade (50° to 95°F)

(44)

Raising server inlet temps:

considerations

•  Can produce hot spots if not monitored properly

•  Internal server fans may automatically turn on, raising energy costs

•  Data centers with VSDs benefit the most

•  Uncomfortable working conditions?

(45)

Humidity control in the past

Tight relative humidity (RH)

tolerances leads to:

–  CRAC #1 reads RH as too high:

•  Over-cools air to remove moisture and then reheats to bring temp back up

–  Results in CRAC #2 reading RH as too low:

•  Adds moisture by generating steam and cools air to bring temp back down

(46)

Solving humidity issues

Use dew point (DP) instead of RH to

measure humidity

Maintain broader ASHRAE recommended

humidity range (42 to 59 degrees °F DP)

Use adiabatic humidification technologies

Misters, foggers, ultrasonic

(47)

eBay:

½

year payback with

ultrasonic humidification

(48)

Free cooling with a water-side

economizer

•  Evaporative cooling of tower produces chilled water •  Heat exchanger used to bypass mechanical chiller •  Downside: high capital costs •  Added security
(49)

Free cooling with an air-side

economizer

Exhaust Air 85°F Outside Air 65°F
(50)

Hours of air-side economizer

use per year

(51)

Info available on

energystar.gov/lowcarbonit

Non-technical

descriptions

Impartial

information about

–  Costs –  Savings –  Implementation considerations Top 12 Data Center Opportunities

1.  Virtualization of Servers

2.  Decommissioning of Unused

Servers

3.  Consolidation of Lightly Utilized

Servers

4.  Data Storage Opportunities

5.  Efficient Equipment Purchase

6.  Hot Aisle/Cold Aisle Arrangement

7.  Containment/Enclosures

8.  Variable Speed Drives

9.  Housekeeping: Blanking Panels,

Cabling and Gaps

10. Server Inlet Temperature and

(52)

Utilities often help pay for

energy saving measures

Utility Programs Vir tu ali za tio n EN ER GY S TA R Se rv er M as siv e A rra y o f Id le D is ks Un in te rru pt ib le Po we r S up ply Ch ille rs / C oo lin g Tow er s Th er m al En er gy St or ag e St or ag e Co ns oli da tio n Air flo w Va ria ble Fr eq ue nc y D riv e Air -S id e Ec on om ize r W at er -S id e Ec on om ize r Pu m ps /M ot or s HV AC / C RA C DC P ow er

Arizona Public Service Company (APS) C C C C/P C P P C P P

Austin Energy C C C C C P P C/P

AVISTA Utilities C P P C/P

British Colombia Hydro (BC Hydro) C C C C C C C C C C C C

Commonwealth Edison C C C C C C C C P C

Duke Energy (NC, SC, OH) C C C/P C C C C/P C C P P C

Efficiency Vermont C C C P C C P P

Energy Trust of Oregon P C C C C C C/P

Focus on Energy (WI) C/P C C P C C C P C C P C

Idaho Power P P P

Nevada Power P P

New York State Energy Research and Development Authority

(NYSERDA) C C C C C C/P C C C/P C/P C

Pacific Gas & Electric Company (PG&E) C C C C C C P C C P P C

Puget Sound Energy (PSE) C C C C C

Sacrament Municipal Utility District (SMUD) C C/P C C/P C C P C/P

(53)

ENERGY STAR rating for data

centers

•  Allows you to compare your data center to others across the U.S.

•  Rewards data centers in the top 25 % of their peers in energy efficiency

–  Metric = Power Usage Effectiveness (PUE)

•  Limited to stand-alone data centers or buildings that house large data centers

NetApp Data Center in Research Triangle Park, NC

(54)

(or how NOT to proceed?)

(55)

Why do IT energy efficiency

projects run out of steam?

(56)

You need an IT expert on your

side

“You might be right!

–  Why don’t we ask an IT energy efficiency expert?”

and now you

(57)

Suggested next steps

1.  Schedule a walk-thru to look for potential savings opportunities

2.  Counter technical concerns/questions with…

–  “You might be right: why don’t we ask an expert?”

–  Schedule a (free) conference call with a vendor-neutral ENERGY STAR technical advisor

3.  Estimate project ROI

–  Emphasize increased reliability and redundancy as direct benefits

–  Don’t forget $ from utility incentive programs 4.  Build a coalition for change

(58)
(59)

Contact information

Additional info:

www.energystar.gov/lowcarbonit

Contact:

–  Mike Walker, AlterAction Inc.

(ENERGY STAR Technical Support Contractor)

@jmikewalker

[email protected]

References

Related documents