RailTel Corporation of India Limited
Purchasing
Author: Ajay Kummar Singh
Creation Date: 12-Jan-2013
Last Updated: 22-March-2013
Document Ref: RCIL-BP080-PO
Version: 1.0
Disclaimer:
This document is a confidential document between Wipro Ltd. and RailTel Corporation Of India Limited. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, whether electronic, mechanical, photocopying, recording or otherwise, without the written permission of Wipro / RCIL. This document includes confidential information related to Wipro and RCIL and shall not be distributed to any persons other than those mentioned in the distribution list herein. All product names referenced herein are trademarks of their respective companies
Document Control
Change Record
4
Date Author Version Change Reference
12-Jan-2013 Ajay Singh 0.1 Base Document 22-Mar-2013 Ajay Singh 1.0 Final Version
Reviewers
Name Position
Prithwish Chatterjee Wipro Project Manager
Swarup Ghosal Chaudhary Wipro Program Manager
Approver
Name Position Signature
Sh. Kamal Kant Kaushaik Manager - Projects Sh. Kumar Bachchan Sr. Manager - DNM Sh. A K Sablania GGM – DNM Sh. Ashutosh Vasant GM - Projects Sh. Puran Singh GGM - Infrastructure Sh. Suresh Kumar GGM – NTP
Distribution
Copy No. Name Location
1 RailTel Project Parivartan Steering Committee Gurgaon 2 RailTel Project Parivartan Core Working Group Gurgaon
3 RailTel Project Parivartan Regional CWG New Delhi/Mumbai/Secunderabad/Kolkata
4 Wipro Onsite Team Gurgaon
5 Wipro Technical Team Gurgaon
Note to Holders:
If you receive an electronic copy of this document and print it out, please write your name on the equivalent of the cover page, for document control purposes.
Contents
Document Control ... ii
Introduction ... 1
About this Document... 1
How this document is organized ... 2
Generic Assumptions ... 3
Overall Project & Procurement Flow ... 4
PO 01 - On Line Purchase Indent Process ... 6
PO 02 - Purchase Indent Process ... 9
PO 03 - Indent Preparation & Approval ... 11
PO 04 - Overall Procurement Tender Process (Supply Item) ... 13
PO 05 - Overall Project Tender Process (Works/Service/Item) ... 17
PO 06 - Open/Global Tender Process – Single Packet ... 21
PO 07 - Open/Global Tender Process – Two Packet ... 24
PO 08 - Limited Tender Process ... 27
PO 09 - Single Tender Process ... 30
PO 10 - Dispensation of Tender Process for Material ... 33
PO 11 - Dispensation of Tender Process for Works Contract & Execution ... 35
PO 12 - Procurement Process for Material (Supply Item) ... 38
PO 13 - Procurement Process for Works Contract (Supply, Installation & Commissioning) ... 41
PO 14 - Procurement Process for Execution ... 44
PO 15 - Procurement Process for AMC (Equipments, Sections, Miscellaneous) ... 47
PO 16 - Procurement Process for Inspection (Material, Works Contract & Execution) ... 49
PO 17 - Imprest/Advance Procurement Process ... 52
PO 18 - Bank Guarantee Process ... 54
PO 19 - Site Readiness Process-For Material and Service ... 56
PO 20 - Inspection Process... 59
PO 21 - Standard Purchase Order Process ... 62
PO 22- Rate Contract for Material (Supply Item) ... 65
PO 23 - Rate Contract Releases of Material (Sub PO) ... 68
PO 24 - Rate Contract for Service & Works Contract ... 71
PO 25 - Rate Contract Releases of Service & Works Contract (Sub PO) ... 75
PO 26 - Advance Purchase Order ... 78
PO 28 - Global Purchase Agreement... 83
PO 29 - Maintain Purchase Order Process (Variation/Enhancement in Quantities) ... 86
PO 30 - RFI- Request for Information (Tender Process) ... 89
PO 31 - Request for Quotation and Quotations (Tender Process)... 92
PO 32 - Supplier Registration (iSupplier Module) ... 96
PO 33 – PO/LOA Acknowledgement (iSupplier Module) ... 98
PO 34 - ASN Creation and Online Submission (iSupplier Module) ... 101
PO 35 - Contracting Process (Procurement Contract) ... 104
PO 36 - Contracting Amendment Process (Procurement Contract) ... 107
PO 37 - Approved Supplier List (ASL) ... 110
PO 38 – Spot Purchase Process ... 113
PO 39 – Inspection Waiver Process ... 116
PO 40 – Delivery Period/Date of Completion - Extension ... 119
Open and Closed Issues for this Deliverable ... 121
Open Issues ... 121
Introduction
About this Document
RAILTEL has appointed Wipro Limited to implement Oracle E-Business Suite. The implementation spans Financials and Supply Chain Management processes. This document describes the Procurement Process for RAILTEL.
The project is divided into Five Stages – viz. Plan, Analyse, Design, Develop and Go-Live. The Analyse Stage covers identifying the gaps in the ‘As-Is’ processes and re-designing them in order to adopt leading processes as also to harness the capability of the chosen technology.
This document contains the RAILTEL Procurement process flow that would be configured onto the Oracle E-Business Suite.
How this document is organized
This document forms deliverable of the operation analysis phase of the ERP implementation project for RailTel. The purpose of this document is to compile a comprehensive list of requirements against which to map Application features. The scenarios listed in the subsequent sections are reusable templates and are created once for each business process.
Each of the following sections consists of the following sub sections:
Assumptions
Any assumptions that are specific to the process being detailed are recorded in this sub section.
Process Scenario
The Event initiates the corresponding process.
Process Solution:
1. Complete process flow
2. Process Id #: Unique number for the sub-processes within the main process.
Description
1. Process Title & Description: The bold letters gives the process title followed by the detailed description of the process in normal font. 2. Key Requirements from the above process
Requirement Fulfillment using ERP Approach
1. Solution Type & Description: Used to designate type of solution. The types mentioned here are Screen, Manual and System. The Screen refers to the type where the data is to be entered in the screen or can be viewed in the screen. Manual type is the manual way of doing the process whether the user would be performing the process in the system or otherwise. The System type of solution is referred to when the system performs the step through automation or sub-automation. The following keys can be used for the process in the system.
i. S – Standard ii. W - Workaround
iii. C – Extension/Customization
2. Navigation Path: The path to navigate to the relevant functionality in Applications. The following acronyms have been used for navigation type:
i. (T) – Tab ii. (B) – Button iii. (CB) – Check Box iv. (F) – Field
Leading Practices
Note: The texts in grey shade are optional activities.
Generic Assumptions
Any additional information captured in ERP through external systems will be highly dependent on the external systems. Wipro will not be responsible for the functioning or the implementation of the external systems.
Customizations identified in the requirement definition document will be developed subject to the scope defined in the approved project charter.
Railtel End to End Project Flow and Integration with other Modules
General Ledger Payables Fixed Assets Receivables
Fi
na
nc
e
Pr
oj
ec
ts
Pr
oc
ur
em
en
t
M
ar
ke
tin
g
&
Sa
le
s
Bu
si
ne
ss
Business Plan General Ledger Budget Definition as per theBusiness Plan Transaction posted form other
Modules
Sources of the Projects Railways – Pink Book
Railtel – Law Book Others – Marketing START Project Creation & Approval Project Budget Creation, Revision & Approval Workplan Creation, Versioning and Progress Management Project Status Inquiry Project Asset Creation & Transfer to FA Transfer to Inventory/ Project Vice Versa Inspection & Recieving Purchase Orders/APO/ Rate Contracts Commercial & Technical Analysis Tender Creation & Floating Purchase Indent/ Creation & Approval Invoicing related to Project in Payables Asset Posting in Fixed Assets Invoice to the Customer in Recievables Note:
The Business plan is conceptualized by the Railtel Directors
Business Plan prepared by Railtel Team / Consultants Projects are created as per the Business plan decided.
Project Closure
END Demand Note
Creation & Customer Acceptance
Sales Order
Booking Contract Creation Billing Note :
The Approval related to the projects is further elaborated in the next flow. The Project Planning team will do the estimation and enter the budget in the system.
The details estimate will be done and Indent / Requisitions will be raised with reference to the project.
Detail processes related to the project are further elaborated in the document.
Manual ERP
On Line Purchase Indent Process
A
ll
D
ep
ar
tm
en
ts
Log in to I Procurement Enter indent online usingweb forms and catalogs
Find Items Add Items & Quantity
Edit Shopping Cart Add Items , Quantity and delivery location
detail
Review/Modify Indent Submit Indent
Proceed to Check Out
Proceed to Check Out Check Out Workflow based purchase indent approval Procurement Process PO12 Supplier notified and deliver the goods Record receipt
in to the web End ERP Manual Email
Start No Yes
F
in
an
ce
Finance Vetting O & M activities Projects (Railway/ RailTel/LMC etc) Others (General Admin etc.)Control Number: PO 01 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 01 Description: This step explains the On Line Purchase Indent Process.
Event Description: This process is triggered to raise the online purchase indent.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
Procurement POM_PO_PI_1 PO 01.01 On line Indent will be created using web forms and catalogs. System Y
Procurement POM_PO_PI_1 PO 01.02 Find Items online and add quantity and delivery details. System Y
Procurement POM_PO_PI_1 PO 01.03 Edit, modify and review indent online. System Y
Procurement POM_PO_PI_1 PO 01.04 Online Indent will be submitted. System Y
Procurement POM_PO_PI_1 PO 01.05 Purchase Indent will be approved as per defined approval hierarchy. System Y
Procurement POM_PO_PI_1 PO 01.06 After approval of Online Indent, Procurement process is initiated. System Y
PO 02 - Purchase Indent Process
Purchase Indent Process
A
ll
D
ep
ar
tm
en
ts
ERP Manual Email Start
User to enter the Indent Header details
Enter the Line details Item code, Qty, Need by date,
Etc Select the Organization, Location and Supplier(Optional) Save the Document and submit for Approval Purchase Indent Approved Automatic notification to Requestor Yes Approved Purchase Indent becomes the input for Purchase Order to be created by the Purchasing department Procurement Process PO12 End
Capture the Charge Account, If any
consumables items(without Item Code)
No
F
in
an
ce
Finance Vetting O & M activities Projects (Railway/ RailTel/LMC etc) Others (General Admin etc.)RAILTEL Process: Purchase Indent Process Business Function: RAILTEL – Project Date: 12-01-2013
Control Number: PO 02 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 02 Description: This step explains the Purchase Indent Process.
Event Description: This process is triggered to raise the purchase indent.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
Procurement POM_PO_PI_1 PO 02.01 User will create the Indent by mentioning the PR headers details like the PR type ,
Description
System Y
Procurement POM_PO_PI_1 PO 02.02 Create Purchase Indent with information like item or description, quantity and
(Approx) purchase price. When item not available the user should choose purchasing category and write a description.
System Y
Procurement POM_PO_PI_1 PO 02.03 Indent preparers should select the inventory organization name, location and
Supplier details (options).
System Y
Procurement POM_PO_PI_1 PO 02.04 Select the Charge Account Number in case of Expense or Consumables items. System Y
Procurement POM_PO_PI_1 PO 02.05 Generate a Purchase Indent with automatic document number. System Y
Procurement POM_PO_PI_1 PO 02.06 Submit the purchase Indent for approval through the delegation of authority. System Y
Procurement POM_PO_PI_1 PO 02.07 Requester will not be able to approve Indent. Indent approval will be a workflow
based process based on approval limits. Approved Purchase Indent is the input for Purchase Order Creation.
PO 03 - Indent Preparation & Approval
Indent Preparation & ApprovalP ro je c t & P ro c u re m e n t ERP Manual Start Indent/ Estimates raised at territory level Submit for approval & Finance Concurrence F in a n c e Approval as per SOP Approval from TM as per SOP Yes More Info M o re In fo N o
RO collates all Indent/ Estimates of territory level and prepares consolidated
proposal Or Indent/Estimate raised at regional level Yes Finance concurrence as per SOP Submit for approval & Finance Concurrence Approval from RGM as per SOP Yes More Info No More Info
CO collates all Indent/ Estimates of regional level and prepares consolidated
proposal Or Indent/Estimate raised at corporate level Yes Submit for approval & Finance Concurrence Corporate finance concurrence as per SOP Approval from MD/Director as per SOP End Yes More Info oN More Info Tender Process at Territory Level If applicable PO04-PO05 Tender Process at Regional Level PO04-PO05
Territory Level Regional Level Corporate Level
Tender Process at Corporate
Level PO04-PO05
RAILTEL Process: Indent Preparation & Approval Business Function: RAILTEL – Project Date: 12-01-2013
Control Number: PO 03 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 03 Description: This step explains the Indent preparation and approval.
Event Description: This process is triggered whenever an Indent is prepared and approved.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
Procurement POM_RP_EP_2 PO 03.01 Indent/Estimates are raised at territory level System Y
Procurement POM_RP_EP_2 PO 03.02 Indent is submitted for approval System Y
Procurement POM_RP_EP_2 PO 03.03 Approval is done as per SOP System Y
Procurement POM_RP_EP_2 PO 03.04 Final approval is done from TM as per SOP System Y
Procurement POM_RP_EP_2 PO 03.05 RO collates all indent/estimates of territory level and prepares consolidated
proposal then it is put up for approval
System Y
Procurement POM_RP_EP_2 PO 03.06 Approval from finance for concurrence is done as per SOP System Y
Procurement POM_RP_EP_2 PO 03.07 Final approval is done from RGM as per SOP System Y
Procurement POM_RP_EP_2 PO 03.08 CO collates all indent/estimates of regional level and prepares consolidated proposal
then it is put up for approval
System Y
Procurement POM_RP_EP_2 PO 03.09 Approval from finance for concurrence is done as per SOP System Y
Start P ro c u re m e n t F in a n c e Business Plan Railways OFC Section Works Other Railways Project Other Customer Project O&M Activities Govt. Projects Global Tender Open Tender Limited Tender Special Limited Tender Single Tender Quotation Tender Document Floated Receive response from bidder Tender document is opened by nominated TOC Comparative sheet and Briefing note are prepared by executive B C Vetted comparative sheet
and Briefing note put up to TC
TC prepares final observation
Comparative sheet & final minutes sent to TAA for
approval
Successful bidder deposit various documents like PBG,
Security Deposit
EMD handed over to finance
Comparative sheet & Briefing note vetted
by finance
B C
Purchase Indent/ Estimates raised at Territory Level.(Project budget will be revised if indent estimate increases more than project budget)
Purchase Indent/ Estimates raised at regional Level
RO collates all requisitions from territories & Prepares
consolidated proposal
CO collates all requisitions from regions & Prepares
consolidated proposal
EMD Return to unsuccessful bidder & EMD returns to successful bidder or adjusted with Invoice Purchase Order Issued to successful bidder. Tender estimate will be revised if PO estimate increases more than tender estimate. Tender processing officer is nominated Project Budgeting Process PRJ05
Tender cost Estimation prepared and Put up to Finance for Finance Vetting & approval as per
SOP along with PAC issued by Region/ Corporate and approved
by Director
A
Tender cost Estimation prepared and Put up to Finance for Finance
Vetting A
Prebid meeting and change/modification Tender document accordingly Acceptance from Supplier Supplier Registration Process PO32 TC nomination as per SOP Purchase Indent raised at corporate level
Overall Procurement Tender Process ERP Manual Email
Discharge Counter offer/LOI Acceptance NIT Published in News Paper (Online) Negotiation may done with supplier Approved Supplier List or Fresh approved supplier
list via approval PO37
End Non-Acceptance
NIT and Tender Document uploaded on
website PR Process
Control Number: PO 04 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 04 Description: This step explains the Overall Procurement Tender process for material.
Event Description: This process is triggered Whenever a Tender is created for material.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
Requirement Generation
POM_TP_ RG_1
PO 04.1 Requirement for floating the tender is triggered from the various sources.
Business Plan (Long Term & Short Term) Railway Project OFC section works Other Railway Projects
Other Customer projects O&M activities Customer Lead Government Project Manual Y Indent/Estimates POM_RP_ EP_2
PO 04.2 Purchase Indent/Estimates raised at territory and regional level
RO & CO collates all the indent and prepares consolidated proposal
Estimates and Tender document prepared and put up to finance for finance vetting.
System Y
Tender Document POM_TP_
TD_2
PO 04.3 Tender Processing officer is nominated.
Tender are of various types, open tender, limited tender, special limited tender, Global tender, single tender and quotation. Respective tender document is created.
System Y
Tender Document Execution
POM_TP_ TE_3
PO 04.4 As per SOP and schedule of work, Tender process is followed and floated;
Simultaneously It is published in news paper and on RailTel website also. As required tender is floated to selected supplier from approved supplier list.
Prebid meeting is done and tender document is changed accordingly Response is received from various vendors.
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
Tender document is opened by nominated TOC
Comparative sheet and Briefing note are prepared by executive
EMD is hand over to finance and Comparative sheet and briefing note are vetted by finance.
TC nomination is done.
Vetted comparative sheet put up to TC and TC prepares the final observation.
Comparative sheet and final minutes sent to competent authority approval. Negotiation is done if required and Discharge can also be happen
Counter offer process is done for final price.
Purchase Order is issued to successful bidder and acknowledgment is received.
Successful bidder deposit various document like PBG, Security deposit. Simultaneously EMD is returned to unsuccessful bidder.
Start P ro je c t F in a n c e Business Plan Railways OFC Section Works Other Railways Project Other Customer Project O&M Activities Govt. Projects Global Tender Open Tender Limited Tender Special Limited Tender Single Tender Quotation Tender Document Floated Receive response from bidder Tender document is opened by nominated TOC Comparative sheet and Briefing note are prepared by executive B C Vetted comparative sheet
and Briefing note put up to TC
TC prepares final observation
Comparative sheet & final minutes sent to TAA for
approval
Successful bidder deposit various documents like PBG,
Security Deposit
EMD handed over to finance
Comparative sheet & Briefing note vetted
by finance
B C
Purchase Indent/ Estimates raised at Territory Level.(Project budget will be revised if indent estimate increases more than
project budget) Purchase Indent/ Estimates raised at regional Level RO collates all requisitions from territories & Prepares
consolidated proposal
CO collates all requisitions from regions & Prepares
consolidated proposal
EMD Return to unsuccessful bidder & EMD returns to successful bidder or adjusted with Invoice LOA Issued to successful bidder. Tender estimate will be revised if LOA estimate increases more than tender estimate. Tender processing officer is nominated Project Budgeting Process PRJ05
Tender cost Estimation prepared and Put up to Finance for Finance Vetting & approval as per
SOP along with PAC issued by Region/ Corporate and approved
by Director
A
Tender cost Estimation prepared and Put up to Finance for Finance
Vetting A
Prebid meeting and change/modification Tender document accordingly Acceptance from Supplier Supplier Registration Process PO32 TC nomination as per SOP Purchase Indent raised at corporate level
Overall Project Tender Process ERP Manual Email
Discharge Counter offer/LOI Acceptance NIT Published in News Paper (Online) Negotiation may done with supplier Approved Supplier List or Fresh approved supplier
list via approval PO37
End Non-Acceptance
NIT and Tender Document uploaded on
website PR Process
Control Number: PO 05 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 05 Description: This step explains the Overall Project Tender process for Service and Work Contract.
Event Description: This process is triggered Whenever a Tender is created for service and works contract.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
Requirement Generation
POM_TP_ RG_1
PO 05.1 Requirement for floating the tender is triggered from the various sources.
Business Plan (Long Term & Short Term) Railway Project OFC section works Other Railway Projects
Other Customer projects O&M activities Customer Lead Government Project Manual Y Indent/Estimates POM_RP_ EP_2
PO 05.2 Purchase Indent/Estimates raised at territory and regional level
RO & CO collates all the indent and prepares consolidated proposal
Estimates and Tender document prepared and put up to finance for finance vetting.
System Y
Tender Document POM_TP_
TD_2
PO 05.3 Tender Processing officer is nominated.
Tender are of various types, open tender, limited tender, special limited tender, Global tender, single tender and quotation. Respective tender document is created.
System Y
Tender Document Execution
POM_TP_ TE_3
PO 05.4 As per SOP and schedule of work, Tender process is followed and floated;
Simultaneously It is published in news paper and on RailTel website also. As required tender is floated to selected supplier from approved supplier list.
Prebid meeting is done and tender document is changed accordingly Response is received from various vendors.
Tender document is opened by nominated TOC
Comparative sheet and Briefing note are prepared by executive
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
EMD is hand over to finance and Comparative sheet and briefing note are vetted by finance.
TC nomination is done.
Vetted comparative sheet put up to TC and TC prepares the final observation.
Comparative sheet and final minutes sent to competent authority approval. Negotiation is done if required and Discharge can also be happen
Counter offer process is done for final price.
LOA is issued to successful bidder and acknowledgment is received. Successful bidder deposit various document like PBG, Security deposit. Simultaneously EMD is returned to unsuccessful bidder.
PO 06 - Open/Global Tender Process – Single Packet
Start P ro je c t & P ro c u re m e n t F in a n c e Open/Global Tender document floated Receive response from bidder Tender document is opened by nominated TOC Comparative sheet and Briefing note are prepared by executive B C Vetted comparative sheetand Briefing note put up to TC
TC prepares final observation
Comparative sheet & final minutes sent to TAA for
approval
Successful bidder deposit various documents like PBG,
Security Deposit
EMD handed over to finance
Comparative sheet & Briefing note vetted
by finance
B C
Purchase Indent/ Estimates raised at Territory Level.(Project budget will be revised if indent estimate increases more than project
budget) Purchase Indent/ Estimates raised at regional Level RO collates all requisitions from territories & Prepares
consolidated proposal
CO collates all requisitions from regions & Prepares
consolidated proposal
EMD Return to unsuccessful bidder & EMD returns to successful bidder or adjusted with Invoice Purchase Order/LOA Issued to successful bidder. Tender estimate will be
revised if LOA/PO estimate increases more
than tender estimate. Tender processing officer is nominated Project Budgeting Process PRJ05
Tender cost Estimation prepared and Put up to Finance for Finance Vetting & approval as per
SOP
A
Tender cost Estimation prepared and Put up to Finance for Finance
Vetting A Acceptance from Supplier Supplier Registration Process PO32 End TC nomination as per SOP Purchase Indent raised at corporate level
Open/Global Tender Process – Single Packet ERP Manual Email
Discharge Counter offer/LOI NIT Published in News Paper (Online) Negotiation may done with supplier Acceptance Non-Acceptance
NIT and Tender Document uploaded on
website PR Process
RAILTEL Process: Open/Global Tender Process – Single Packet
Business Function: RAILTEL – Tender Date: 12-01-2013
Control Number: PO 06 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 06 Description: This step explains the Open/Global Tender process for Single Packet.
Event Description: This process is triggered Whenever an Open Tender is created.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
Indent/Estimates POM_RP_
EP_2
PO 06.1 Purchase Indent/Estimates raised at territory and regional level
RO & CO collates all the indent and prepares consolidated proposal
Estimates and Tender document prepared and put up to finance for finance vetting.
Tender Document POM_TP_
TD_2
PO 06.2 Tender Processing officer is nominated for Open/Global Tender – Single Packet. System Y
Tender Document Execution
POM_TP_ TE_3
PO 06.3 As per SOP and schedule of work, Tender process is followed and floated;
Simultaneously It is published in news paper and on RailTel website also. Response is received from various vendors.
Tender document is opened by nominated TOC
Comparative sheet and Briefing note are prepared by executive
EMD is hand over to finance and Comparative sheet and briefing note are vetted by finance.
TC nomination is done.
Vetted comparative sheet put up to TC and TC prepares the final observation.
Comparative sheet and final minutes sent to competent authority approval. Negotiation is done if required and Discharge can also be happen
Counter offer process is done for final price.
PO/LOA is issued to successful bidder and acknowledgment is received. Successful bidder deposit various document like PBG, Security deposit.
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
PO 07 - Open/Global Tender Process – Two Packet
Start P ro je c t & P ro c u re m e n t F in a n c e Open/Global Tender document floated Receive response from bidder Tender document(Technical) is opened by nominated TOCBriefing note are prepared by executive B C Vetted Briefing note put up to TC TC prepares final observation
Final minutes sent to TAA for approval
EMD handed over to finance
Comparative sheet & Briefing note vetted
by finance
B C
Purchase Indent/ Estimates raised at Territory Level.(Project budget will be revised if indent estimate increases more than
project budget) Purchase Indent/ Estimates raised at regional Level RO collates all requisitions from territories & Prepares
consolidated proposal
CO collates all requisitions from regions & Prepares
consolidated proposal Tender processing officer is nominated Project Budgeting Process PRJ05
Tender cost Estimation prepared and Put up to Finance for Finance Vetting and approval as
per SOP
A
Tender cost Estimation prepared and Put up to Finance for Finance
Vetting A TC nomination as per SOP Purchase Indent raised at corporate level
Open/Global Tender Process – Two Packet ERP Manual Email
NIT Published in News Paper
(Online)
Prebid Meeting & Change/Modify Tender document Prebid queries
Publish on Website
Price bid kept in seal packet with executive along with seal of RCIL and sign. of TOC and all bidders EMD and Unopened Price bid returns to unsuccessful bidders Price TC opened by nominated TOC Notification to all successful bidder of Price bid Comparative sheet are prepared by executive C B Vetted comparative sheet put up to TC TC prepares final observation
Comparative sheet & final minutes sent to TAA for
approval Successful bidder deposit various documents like PBG, Security Deposit EMD Return to unsuccessful bidder & EMD returns to successful bidder or adjusted with Invoice Purchase Order/LOA Issued to successful bidder. Tender estimate will be
revised if LOA/PO estimate increases more
than tender estimate.
Acceptance from Supplier Supplier Registration Process PO32 Discharge Counter Offer/LOI Negotiation may done with supplier End Acceptance Non-Acceptance NIT and Tender
Document uploaded on
website PR Process
RAILTEL Process: Open/Global Tender Process – Two Packet
Business Function: RAILTEL – Tender Date: 12-01-2013
Control Number: PO 07 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 07 Description: This step explains the Open/Global Tender process for Two Packet.
Event Description: This process is triggered Whenever an Open Tender is created.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
Indent/Estimates POM_RP_
EP_2
PO 07.1 Purchase Indent/Estimates raised at territory and regional level
RO & CO collates all the indent and prepares consolidated proposal
Estimates and Tender document prepared and put up to finance for finance vetting.
Manual N
Tender Document POM_TP_
TD_2
PO 07.2 Tender Processing officer is nominated for Open/Global Tender – Two Packet. System Y
Tender Document Execution
POM_TP_ TE_3
PO 07.4 As per SOP and schedule of work, Tender process is followed and floated;
Simultaneously It is published in news paper and on RailTel website also. Prebid meeting is done and tender document is changed /modified accordingly. Prebid queries are published on website also.
Response is received from various vendors.
Tender document (Technical) is opened by nominated TOC
Price bid kept in seal packet with executive along with seal of RCIL and sign. of TOC and all bidders
Briefing note is prepared by executive.
EMD is hand over to finance and briefing note is vetted by finance. TC nomination is done.
Vetted Briefing note put up to TC and TC prepares the technical observation.
Technical minutes sent to competent authority for approval. EMD and unopened price bid returned to unsuccessful bidder
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
Price TC opened by nominated TOC
Notification is sent to all successful bidders of price bid for opening. Comparative sheet and Briefing note are prepared by executive Comparative sheet and briefing note are vetted by finance. Vetted comparative sheet put up to TC and TC prepares the final observation.
Comparative sheet and final minutes sent to competent authority approval. Negotiation is done if required and Discharge can also be happen
Counter offer process is done for final price.
PO/LOA is issued to successful bidder and acknowledgment is received. Successful bidder deposit various document like PBG, Security deposit. Simultaneously EMD is returned to unsuccessful bidders.
PO 08 - Limited Tender Process
Start P ro je c t & P ro c u re m e n t F in a n c e Limited Tender floated to selected vendor Receive response from bidder Tender document is opened by nominated TOC Comparative sheet and Briefing noteare prepared by executive B C Vetted comparative sheet
and Briefing note put up to TC
TC prepares final observation
Comparative sheet & final minutes sent to TAA for
approval
Successful bidder deposit various documents like PBG,
Security Deposit
EMD handed over to finance
Comparative sheet & Briefing note vetted
by finance
B C
Purchase Indent/ Estimates raised at Territory Level.(Project budget will be revised if
indent estimate increases more than
project budget) Purchase Indent/ Estimates raised at regional Level RO collates all requisitions from territories & Prepares
consolidated proposal
CO collates all requisitions from regions & Prepares
consolidated proposal
EMD Return to unsuccessful bidder & EMD returns to successful bidder or adjusted with Invoice Purchase Order/ LOA Issued to successful bidder. Tender estimate will
be revised if LOA/ PO estimate increases more than
tender estimate. Tender processing officer is nominated Project Budgeting Process PRJ05
Tender cost Estimation prepared and Put up to Finance for Finance Vetting & approval as per
SOP
A
Tender cost Estimation prepared and Put up to Finance for Finance
Vetting A Acceptance from Supplier Supplier Registration Process PO32 End TC nomination as per SOP Purchase Indent raised at corporate level
Limited Tender ERP Manual Email
Discharge Counter offer/LOI Negotiation may done with supplier Approved Supplier List PO37 Fresh approved supplier list via
approval
Prebid Meeting & Change/Modify Tender document
Non-Acceptance
Acceptance NIT and Tender
Document uploaded on
website PR Process
RAILTEL Process: Limited Tender Process Business Function: RAILTEL – Tender Date: 12-01-2013
Control Number: PO 08 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 08 Description: This step explains the Limited Tender process.
Event Description: This process is triggered Whenever a Limited Tender is created.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
Indent/Estimates POM_RP_
EP_2
PO 08.1 Purchase Indent/Estimates raised at territory and regional level
RO & CO collates all the indent and prepares consolidated proposal
Estimates and Tender document prepared and put up to finance for finance vetting.
System Y
Tender Document POM_TP_
TD_2
PO 08.2 Tender Processing officer is nominated and Limited tender is floated to selected
vendors. System Y Tender Document Execution POM_TP_ TE_3
PO 08.3 As per SOP and schedule of work, Tender process is followed and floated;
Simultaneously It is published on RailTel website also.
As required tender is floated to selected supplier from approved supplier list or fresh approved supplier list can be created before floating the tender document.
Prebid meeting may be done and tender document is changed accordingly if required.
Response is received from various vendors. Tender document is opened by nominated TOC
Comparative sheet and Briefing note are prepared by executive
EMD is hand over to finance and Comparative sheet and briefing note are vetted by finance.
TC nomination is done.
Vetted comparative sheet put up to TC and TC prepares the final observation.
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
Comparative sheet and final minutes sent to competent authority approval. Negotiation is done if required and Discharge can also be happen
Counter offer process is done for final price.
LOA is issued to successful bidder and acknowledgment is received. Successful bidder deposit various document like PBG, Security deposit. Simultaneously EMD is returned to unsuccessful bidder.
PO 09 - Single Tender Process
Start P ro je c t & P ro c u re m e n t F in a n c e Single Tender floated to single vendor Receive response from bidder Tender document is opened by nominated TOC Comparative sheet and Briefing noteare prepared by executive B C Vetted comparative sheet
and Briefing note put up to TC
TC prepares final observation
Comparative sheet & final minutes sent to TAA for
approval
Successful bidder deposit various documents like PBG,
Security Deposit
EMD handed over to finance
Comparative sheet & Briefing note vetted
by finance
B C
Purchase Indent/ Estimates raised at Territory Level.(Project budget will be revised if indent estimate increases more than project
budget) Purchase Indent/ Estimates raised at regional Level RO collates all requisitions from territories & Prepares
consolidated proposal
CO collates all requisitions from regions & Prepares
consolidated proposal
EMD returns or adjusted with
Invoice Purchase Order/LOA Issued
to successful bidder. Tender estimate will be revised if LOA/PO estimate increases more than tender
estimate. Tender processing officer is nominated Project Budgeting Process PRJ05
Tender cost Estimation prepared and Put up to Finance for Finance Vetting & approval as per
SOP. Along with PAC issued by region/ Corporate (with vetting) and approval by director/
Corporate
A
Tender cost Estimation prepared and Put up to Finance for Finance
Vetting A Acceptance from Supplier Supplier Registration Process PO32 End TC nomination as per SOP Purchase Indent raised at corporate level
Single Tender ERP Manual Email
Discharge Counter offer/LOI Negotiation may done with supplier Approved Supplier List PO37 Fresh approved supplier list via
approval
RAILTEL Process: Single Tender Process Business Function: RAILTEL – Tender Date: 12-01-2013
Control Number: PO 09 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 09 Description: This step explains the Single Tender process.
Event Description: This process is triggered Whenever Single Tender is created.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
Indent/Estimates POM_RP_
EP_2
PO 09.1 Purchase Indent/Estimates raised at territory and regional level
RO & CO collates all the indent and prepares consolidated proposal
Estimates and Tender document prepared and put up to finance for finance vetting, along and with PAC issued by region (with vetting) and approval by director/corporate.
System Y
Tender Document POM_TP_
TD_2
PO 09.2 Tender Processing officer is nominated and Singe tender is floated to vendor. System Y
Tender Document Execution
POM_TP_ TE_3
PO 09.3 As per SOP and schedule of work, Tender process is followed and floated.
As required tender is floated to selected supplier from approved supplier list or fresh approved supplier list can be created before floating the tender document.
Tender document is opened by nominated TOC
Comparative sheet and Briefing note are prepared by executive
EMD is hand over to finance and Comparative sheet and briefing note are vetted by finance.
TC nomination is done.
Vetted comparative sheet put up to TC and TC prepares the final observation.
Comparative sheet and final minutes sent to competent authority approval. Negotiation is done if required and Discharge can also be happen
Counter offer process is done for final price.
LOA is issued to successful bidder and acknowledgment is received.
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N)
Successful bidder deposit various document like PBG, Security deposit. Simultaneously EMD is returned to unsuccessful bidder.
PO 10 - Dispensation of Tender Process for Material
Dispensation of Tender for Material
T
er
ri
to
ry
/R
eg
io
n
/
C
o
rp
o
ra
te
F
in
an
ce
P
ro
je
ct
&
P
ro
cu
re
m
en
t
Start Executive processes the dispensation of Tender RFQ will be created for quotation Quotation are called from various vendors (Minimum 3) PO31 Comparative statement is prepared by the executive and sent to finance for vetting Comparative sheet sent to competent authority approval Purchase Order is issued to successful bidder End RFQ Process PO31Executive sends the proposal Purchase Requisition/Indent to Manager (HQ/RO/CO) PO01-PO02 Purchase Indent Process PO01-PO02 Procurement Process PO12 Successful bidder deposit various documents like PBG, Security Deposit (Optional) A A Finance Vetting
RAILTEL Process: Dispensation of Tender Process for Material
Business Function: RAILTEL – Tender Date: 12-01-2013
Control Number: PO 10 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 10 Description: This step explains the Dispensation of Tender process for Material.
Event Description: This process is triggered Whenever Dispensation of Tender Process is done.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N) Dispensation of Tender/Quotation Process POM_TP _DT_4
PO 10.1 Dispensation of tender is requested on urgent basis for extension of maintenance
activity or last mile. Executive processes the dispensation of tender process.
System Y Dispensation of Tender/Quotation Process POM_TP _DT_4
PO 10.2 RFQ document is created and sent to approve suppliers or Fresh Suppliers.
Quotations are called from various suppliers.
System Y Dispensation of Tender/Quotation Process POM_TP _DT_4
PO 10.3 Comparative statement is prepared and sends to finance for vetting then it is sent to
competent authority for approval.
System Y Dispensation of Tender/Quotation Process POM_TP _DT_4
PO 10.4 Purchase Order is issued to successful bidder System Y
Dispensation of Tender/Quotation Process
POM_TP _DT_4
PO 10.5 Successful bidder deposits various documents like PBG, Security deposit. System Y
Dispensation of Tender/Quotation Process
POM_TP _DT_4
Dispensation of Tender for Works Contract & Execution
T
er
ri
to
ry
/R
eg
io
n
/
C
o
rp
o
ra
te
F
in
an
ce
P
ro
cu
re
m
en
t
Start Executive processes the dispensation of Tender RFQ will be created for quotation Quotation are called from various vendors (Minimum 3) PO31 Comparative statement is prepared by the executive and sent tofinance for vetting
Comparative sheet sent to competent authority approval LOA is issued to successful bidder End RFQ Process PO31
Executive sends the proposal Purchase Requisition/Indent to Manager (HQ/RO/CO) PO01-PO02 Purchase Indent Process PO01-PO02 Procurement Process PO13 Successful bidder deposit various documents like PBG, Security Deposit (Optional) A A Finance Vetting
ERP Manual Email
Service & Works Contract
Control Number: PO 11 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 11 Description: This step explains the Dispensation of Tender process for Service & Works Contract.
Event Description: This process is triggered Whenever Dispensation of Tender Process is done.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process AS IS ID # Process ID # Description
Mode
Requirement Fulfillment using ERP Approach (Y/N) Dispensation of Tender/Quotation Process POM_TP _DT_4
PO 11.1 Dispensation of tender is requested on urgent basis for extension of maintenance
activity or last mile. Executive processes the dispensation of tender process.
System Y Dispensation of Tender/Quotation Process POM_TP _DT_4
PO 11.2 RFQ document is created and sent to approve suppliers or Fresh Suppliers
Quotations are called from various suppliers.
System Y Dispensation of Tender/Quotation Process POM_TP _DT_4
PO 11.3 Comparative statement is prepared and sent to finance for vetting then it is sent to
competent authority for approval.
System Y Dispensation of Tender/Quotation Process POM_TP _DT_4
PO 11.4 LOA is issued to successful bidder System Y
Dispensation of Tender/Quotation Process
POM_TP _DT_4
PO 11.5 Successful bidder deposits various documents like PBG, Security deposit. System Y
Dispensation of Tender/Quotation Process
POM_TP _DT_4
PO 12 - Procurement Process for Material (Supply Item)
Standard Purchase Order APO/RC/SPO/Sub APO/Sub RC Sent for Finance VettingPurchase Order Issued to Successful bidder Sub PO are released against RC P ro c u re m e n t F in a n c e Supplier offer RailTel for carrying inspection Inspection from nominated agency either from ASL or by RailTel officials Confirmation of Change of consignee if any Item delivered at store Warranty as per PO conditions
Invoice Bills & Payments AP02-AP04
RailTel Uses the item to the site or RailTel deliver the item
to the site Start End Purchase Order Document Created Sub PO are released against APO Region wise Distribution
Procurement Process for Supply Item
Standing Bank Guarantee Submission from Supplier Advance Purchase Order Rate Contract PO will be amended to change the consignee detail with
executive approval Nomination of inspection authorized agency Approved Supplier List or New Supplier PO37 Payment to Outside Inspection authority ERP Manual Email
End Receiving Process INV02 Inspection report is entered in to the system Acceptance & BG submission from Supplier PO18 Inspection Outside RailTel
RAILTEL Process: Procurement Process for Material Business Function: RAILTEL-Project Date: 12-01-2013
Control Number: PO 12 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 12 Description: This step explains the procurement process of Material.
Event Description: This process is triggered Whenever a purchase order is raised for material procurement.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process
AS IS ID # Process ID #
Description Mode
Requirement Fulfillment using ERP Approach (Y/N)
Purchase Order Creation
POM_PO_PC_3 PO 12.1 Purchase Order is created as per the requirement in the tender with the
successful bidder.
System Y
Purchase Order
POM_PP_PO_4 PO12.2 Purchase Order can be of multiple types like Standard PO, APO and
RC.
Purchase Order is issued to successful bidder after finance vetting. Standing BG is submitted from supplier against APO and RC.
BG is submitted and accepted from supplier against Standard PO and Sub-Pos against APO & RC.
System Y
Inspection POM_PO_IP_4 PO 12.3 Supplier offer RailTel for carrying Inspection.
Inspection can be from nominated agency either from ASL or by RailTel officials.
If Inspection is from outside, nomination of inspection authorized agency is done from ASL and Payment to inspection authority is made. Inspection report is entered in to the system.
System Y
None None PO 12.4 PO will be amended to change the consignee detail with the executive
approval.
System Y
Receiving/D elivery
POM_PO_RD_5 PO 12.5 Item is delivered at store
RailTel uses the item to the site or RailTel deliver the item to the site.
System Y
AS IS Process
AS IS ID # Process ID #
Description Mode
Requirement Fulfillment using ERP Approach (Y/N)
PO 13 - Procurement Process for Works Contract (Supply, Installation & Commissioning)
LOA Sent for Finance Vetting LOA Issued to Successful bidder P ro je c t F in a n c e Contract agreement is prepared with successful bidder Contractor offer RailTel for carrying inspection Inspection from nominated agency either from ASL or by RailTel officials Confirmation of change in consignee if any Service/Item delivered & recorded Item delivered at site Vendor does I&C after site readiness SI Conducts AT in co-ordination with RailTel Executive PAC released after AT FAC as per
LOA T&C per LOA T&CWarranty as End
Invoice Bills & Payments AP02-AP04 Start LOA Document Created Region wise Distribution Contract agreement is sent for legal
vetting
Procurement Process for Works Contract
Nomination of inspection authorized agency Approved Supplier List PO37 Payment to Inspection authority End LOA will be amended
to change the consignee detail with
executive approval
Part PAC can also be released as per LOA T&C Acceptance &
BG Submission from Supplier
PO18
ERP Manual Email
Inspection Outside RailTel
RAILTEL Process: Procurement Process for Service & Works Contract
Business Function: RAILTEL-Project Date: 12-01-2013
Control Number: PO 13 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 13 Description: This step explains the procurement process for service & Works Contract.
Event Description: This process is triggered Whenever a LOA is created for service and Works Contract.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process AS IS ID # Process ID #
Description Mode
Requirement Fulfillment using ERP Approach (Y/N)
LOA Creation POM_PO_P
C_3
PO 13.1 LOA document is created and region wise distribution can also be happen. System Y
LOA Creation POM_PP_P
O_4
PO 13.2 LOA is issued to successful bidder after finance vetting. System Y
None None PO 13.3 LOA is accepted and Bank Guarantee is submitted from supplier.
None POM_RP_TP
_5
PO 13.4 Contract agreement is prepared with successful bidder and it is sent for legal
vetting.
System Y
Inspection POM_PO_IP
_4
PO 13.5 Contractor offer RailTel for carrying Inspection
Inspection can be from nominated agency either from ASL or RailTel officials. Fresh nomination of agency can also be done.
If inspection is from outside, nomination of inspection authorized agency is done from ASL and Payment to inspection authority is made.
System Y
None None PO 13.6 Consignee detail can be changed by amending the consignee detail in LOA. LOA will
go for executive approval.
System Y
Receiving/Delivery POM_PO_R
D_5
PO 13.7 Service/Item is delivered to site/Store.
Vendor does I&C at site after site readiness.
System Y
AS IS Process AS IS ID # Process ID #
Description Mode
Requirement Fulfillment using ERP Approach (Y/N)
_5/POM_RP _TS_4
PAC is released after AT, Part PAC can also be released as per LOA terms & condition
FAC will be issued after PAC release as per LOA terms & condition Warranty will be applicable after delivery as per LOA terms & condition
LOA Sent for Finance Vetting LOA Issued to Successful bidder
P
ro
je
ct
F
in
an
ce
Contract agreement is prepared with successful bidder Work Confirmation of Service deliveredInvoice Bills & Payments AP02-AP04 Start LOA Document Created Region wise Distribution Contract agreement is sent for legal vetting Optional for Execution
works at RO
Procurement Process for Execution
ERP Manual EmailPAC released after AT
FAC as per
LOA condition End Part PAC can also be released as per LOA condition Acceptance & BG, SD Submission from Supplier PO18 SI Conducts AT in co-ordination with RailTel Executive SI Conducts AT in co-ordination with RailTel Executive Stock Transfer from Store to Project Site INV04 On-hand quantity will get updated End Indent for Material requirement at sites PO01-PO02 Material required at site for other activity
Control Number: PO 14 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 14 Description: This step explains the procurement process for Execution.
Event Description: This process is triggered Whenever LOA is raised for execution activity.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process
AS IS ID # Process ID #
Description Mode
Requirement Fulfillment using ERP Approach (Y/N)
LOA Creation
POM_PO_ PC_3
PO 13.1 LOA document is created and region wise distribution can also be happen. System Y
LOA Creation
POM_PP_ PO_4
PO 13.2 LOA is issued to successful bidder after finance vetting. System Y
None None PO 13.3 LOA is accepted and Bank Guarantee, Security Deposit is submitted from supplier.
None POM_RP_
TP_5
PO 13.4 Contract agreement is prepared with successful bidder and it is sent for legal
vetting. System Y Receiving/D elivery POM_PO_ RD_5
PO 13.5 Work Confirmation of Service is entered for service receiving. System Y
None None PO 13.6 In case of Material requirement like Duct, Cable at site an Indent will be
raised to issue the material from store to site. Stock is transferred from store to site.
System Y Inspection/F AT POM_PP_ FT_5/PO M_RP_TS _4
PO 13.7 SI conducts AT in coordination with RailTel executive
PAC is released after AT, Part PAC can also be released as per LOA terms & condition
FAC will be issued after PAC release as per LOA terms & condition
PO 15 - Procurement Process for AMC (Equipments, Sections, Miscellaneous)
LOA Sent for Finance
Vetting
LOA Issued to Successful bidder for AMC
Work
P
ro
je
ct
F
in
an
ce
Contract agreement is prepared with successful bidder Service delivered & recorded Invoice Bills & Payments AP02-AP04 Start LOA Document Created Region wise Distribution Contract agreement is sent for legalvetting
Procurement Process for AMC Work (Equipment, Section)
Work Confirmation of Service End Email Manual ERP Acceptance & BG Submission from Supplier PO18 Work Order MNT04
RAILTEL Process: Procurement Process for AMC Business Function: RAILTEL-Project Date: 12-01-2013
Control Number: PO 15 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 15 Description: This step explains the procurement process for AMC work.
Event Description: This process is triggered Whenever LOA is raised for AMC work against Work Order and Purchase Indent.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process
AS IS ID # Process ID #
Description Mode
Requirement Fulfillment using ERP Approach (Y/N)
LOA Creation
POM_PO_ PC_3
PO 13.1 LOA document is created and region wise distribution can also be happen for AMC
work. System Y LOA Creation POM_PP_ PO_4
PO 13.2 LOA is issued to successful bidder after finance vetting. System Y
None None PO 13.3 LOA is accepted and Bank Guarantee is submitted from supplier.
None POM_RP_
TP_5
PO 13.4 Contract agreement is prepared with successful bidder and it is sent for legal
vetting. System Y Receiving/D elivery POM_PO_ RD_5
Procurement Process for Inspection Charges
P ro cu re m en tP
ro
cu
re
m
en
t
F
in
an
ce
StartService PO is created for Inspection Charges with Supplier Ship to and Bill to
details
Shipment detail is entered
Distribution detail is entered for service delivery/Inspection work/Inspection charges Service details, amount, need by date and promised date is entered Give Distribution detail location wise
and delivery schedule for item
delivery Approve PO PO approved No Automatic notification to buyer Yes PO sent for finance vetting Service Delivered/ Inspection completed Inspection report is submitted to Project Executive End
Invoice Bill & Payments to supplier for Inspection Work
AP02-AP04
ERP Manual Email
Work Confirmation
of Service INV03
Control Number: PO 16 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 16 Description: This step explains the procurement process for Inspection Charges.
Event Description: This process is triggered Whenever Payment for Inspection Charges is done.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process
AS IS ID # Process ID #
Description Mode
Requirement Fulfillment using ERP Approach (Y/N)
None None PO 16.1 Service Purchase Order is created for Inspection charges with supplier details. System Y
None None PO 16.2 Service amount/quantity, service fulfillment date is entered. System Y
None None PO 16.3 Shipment detail is entered System Y
None None PO 16.4 Distribution detail location wise is entered for service delivery information System Y
None None PO 16.5 Service Purchase Order is submitted for approval for finance vetting System Y
None None PO 16.6 Automatic notification will be sent to buyer for confirmation of LOA approval. System Y
PO 17 - Imprest/Advance Procurement Process
Imprest/Advance Procurement Process
P ro cu re m en t
O
p
er
at
io
n
&
M
ai
n
te
n
an
ce
F
in
an
ce
Start Service Purchase Order sent for finance vettingInvoice Bill & Payments to
supplier AP02-AP04 ERP Manual Email
Unorered receipt of Item/ Service detail is created Receipt of line detail is recorded Item/Service, Quantity, UOM and
receiving location for receipt line is
specified Generate new receipt or add unordered receipt lines to an existing receipt
P
ro
je
ct
s
&
P
ro
cu
re
m
en
t
Receipt header information is entered and transaction is submitted Search Unordered receipts to match Select receipt lines to match Purchase Order is created to match the receipt lines Select Purchase Order document number & Line details to matchSubmit Unordered receipt line for
matching Receiving of Item/Service is done in the system Final delivery of Item/Service End
RAILTEL Process: Imprest/Advance Procurement Process
Business Function: RAILTEL-Project Date: 12-01-2013
Control Number: PO 17 Mapping Team: Wipro Process Owner: RAILTEL – Project Team
Process Number: PO 17 Description: This step explains the Imprest/Advance Procurement Process.
Event Description: This process is triggered Whenever unordered receipt is made without valid Purchase Order.
Source: RAILTEL – Project Team/AS-IS Document
AS IS Process
AS IS ID # Process ID #
Description Mode
Requirement Fulfillment using ERP Approach (Y/N)
None None PO 17.1 Unordered receipt of Item/Service detail is created System Y
None None PO 17.2 Item/Service, Quantity, UOM and receiving location for receipt line is specified System Y
None None PO 17.3 Generate new receipt or add unordered receipt lines to an existing receipt System Y
None None PO 17.4 Receipt header information is entered and transaction is submitted System Y
None None PO 17.5 Purchase Order is created to match the receipt lines System Y
None None PO 17.6 Unordered receipt and receipt lines is searched to match with PO document number System Y
None None PO 17.7 Unordered receipt line is submitted for matching System Y
None None PO 17.8 Receiving of Item/Service is done in the system System Y