'0-40. -",& -£Ê- 7 ,Ê - ,6 Ê,
CSD-1 Service Area
CSD-1 serves the unincorporated areas of Sacramento, the cities of Citrus Heights, Rancho Cordova and Elk Grove, and portions of the cities of Folsom and Sacramento.Organizational Chart . . . .4
Board of Directors . . . .5
From the District Engineer . . . .6
Overview . . . .7
CSD-1 Budget Summary . . . .8
CSD-1 Budget Schedule, Operating Fund . . . . 10
Top 10 Accounts . . . . 12
Service Charge History . . . . 13
Fee Schedule History . . . . 13
CSD-1 Budget Schedule, Trunk Fund . . . . 14
CSD-1 Budget Schedule, Rehabilitation-Capital Outlay Fund . . . . 16
Detail of Provisions for Reserves/Designations . . . . 18
Capital Improvement Program . . . . 19
CSD-1 Organizational Chart
District Engineer
Mary Snyder
Collection System Christoph Dobson Communications & Media Claudia Goss FinanceMarcia Maurer Policy & PlanningWendell Kido
Administration
Lynn Wynn Customer LiaisonRick Leibold Safety & TrainingBuck Sanders CSD-1 EngineeringRosemary Clark
Operations & Maintenance
Scott Miller
CSD-1 Board of Directors
Asset Management
County of Sacramento
Roger Dickinson, District 1
Jimmie Yee, District 2
Susan Peters, District 3
Roberta MacGlashan, District 4
Don Nottoli, District 5
City of Citrus Heights
Jeannie Bruins
City of Elk Grove
Sophia Scherman
City of Folsom
Kerri Howell
City of Rancho Cordova
Dan Skoglund
City of Sacramento
Kevin McCarty
From the District Engineer
County Sanitation District 1 (CSD-1) is proud to present its
2007-08 Final Budget . This budget book has been created for
ratepayers, stakeholders, elected officials and staff as a summary of the District’s
financial plan for providing its customers with vital wastewater collection
services in a safe, efficient and innovative manner .
The Final Budget represents normal operating costs, as well as funding for the
2007-08 portion of the District’s Capital Improvement Program (CIP) . This fiscal
year, the CIP includes scheduled projects such as the Oak Avenue Relief, the Watt
Avenue Replacement and the Old Auburn Road Relief Project . The District Board
reviews and approves both the proposed District budget in June and the final
District budget in September of each year .
I would like to thank the CSD-1 staff for the time and effort involved in compiling
all of the budget information into a single, comprehensive document . The
Final Budget book requires a great deal of work on many levels, both by small
individual working groups organized to prioritize needs, and by larger
inter-collaborations needed for the actual compilation of the budget information .
In order to provide accountability to our ratepayers and customers, the
CSD-1 Final Budget is available to the public on the District’s Web site at
www .csd-1 .com .
About County Sanitation District 1
County Sanitation District 1 (CSD-1) is a local
sewer district responsible for building and
maintaining the system that collects wastewater
from homes and businesses . CSD-1’s services
focus on protecting the health and environment
of a growing Sacramento community by
carrying out wastewater collection services in
a safe, efficient and innovative manner . CSD-1
provides sewer services for the unincorporated
areas of Sacramento, the cities of Citrus Heights,
Rancho Cordova and Elk Grove, and for portions
of the cities of Folsom and Sacramento .
CSD-1 is governed by
a 10-member board of
directors made up of
five members of the
Sacramento County
Board of Supervisors, as
well as representatives
from the cities of Citrus
Heights, Elk Grove,
Folsom, Rancho Cordova
and Sacramento . CSD-1
staff, totaling 310
full-time employees, is provided by the County of
Sacramento’s Department of Water Quality,
and maintains and operates a network of more
than 2,900 miles of sanitary sewer pipes . The
2007-08 operating budget is $105 .5 million . In
addition, CSD-1’s 20-year Capital Improvement
Program (CIP) includes $411 million in major
rehabilitation and relief project construction .
CSD-1 Budget Summary
Operations
The 2007-08 Operating Fund budget request is
$105,515,513 . Highlights of the budget are as
follows:
• Since CSD-1 was formed, labor and benefit
costs have been budgeted under the
Sacramento County Department of Water
Quality and shown in the District budget
within the services and supplies category .
Beginning July 1, 2007, all labor costs are
budgeted directly in the Operations Fund
and are shown in the salaries and benefits
category on the budget schedule .
• Labor costs have remained the same as last
year at $31 million due to the change in
budgeting practices . This is 29% of the total
operating budget .
• CSD-1 began the process of
converting to an enterprise
fund basis of budgeting
in July 2006 . Last year
depreciation was included in
the budget . For 2007-08 the
District is using a new budget
schedule that shows the use
of working capital rather than
fund balances to fund the
budget . Due to administrative
issues, CSD-1 will use a
transitional method this year
to budget for fixed assets and
debt service payments .
• The total reserve for all funds will remain the
same as in 2006-07 at $44 .9 million .
• The use of a contingency account has
been re-established for this fiscal year . An
allowance for increased operating costs due
to weather or other abnormal operating
conditions will be shown in this account . The
use of contingencies will be authorized as
needed by the District Engineer .
Financing for this fund is primarily funded by
customer service charges and interest earnings
on cash balances . The budget is based on a rate
of $14 per month per ESD (equivalent
single-family dwelling), which became effective
July 1, 2007 .
Monthly Service Charge−$14
Labor
Consulting
Contracts
Services &
Supplies
Major Components of $14 Monthly Service Charge
Billing
Capital
Projects
Equipment
Bad Debt
Expense
$4.62
$4.20
$2.89
$0.67
$0.55
$0.44
$0.43
Insurance
$0.20
CSD-1 Budget Summary
Capital Funds
The CSD-1 Trunk Fund budget request of
$55,859,753 reflects the continued use of the
2005 Revenue Bond proceeds . The process
for budgeting multi-year consultant contracts
has changed . Only the current year’s planned
expenditures will be encumbered, instead of the
entire contract amount . This change will impact
the amount of working capital of this fund .
The trunk construction program is
financed by impact fees, revenue bond
proceeds, interest earnings on cash
balances and a portion of the monthly
service charge for projects benefiting
existing users .
The CSD-1 Rehabilitation-Capital
Outlay Fund budget request is
$31,322,228 . As with the Trunk Fund,
this budget reflects the continued use
of proceeds from the 2005 Revenue
Bonds . The Rehabilitation Fund is
financed by a portion of the monthly
service charge for projects benefiting
existing users and revenue bond
proceeds .
Debt service for the District’s
outstanding 2005 Revenue Bonds is
$10 .6 million and is allocated between
both capital funds .
CSD-1 Debt Service Fund
Debt service funds are typically used in general
fund accounting . All debt service payments for
the authority have been budgeted in the Trunk
Fund and Rehabilitation Fund, and this fund will
be closed .
Budget
Total District Budget $192.7 million
Major fund components in millions ($)
Trunk
Operations
Rehabilitation
$105.5
$55.9
$31.3
CSD-1 Budget Schedule
Operating Fund
Fiscal Year 2007-08
FUND # 2A
BUDGET UNIT # 00000
Operating Details Actual
200-0 Actual 200-0 Adopted 200-0 Requested & Recommended 200-0
Charges for Services 46,926,157 49,471,000 44,360,600 46,459,400
Other Revenues 494,184 1,546,142 5,538,000 13,079,402
Total Operating Revenues ,20,1 1,01,12 ,,00 ,,02
OPERATING EXPENSES
Salaries/Benefits 37,874 28,470 50,000 31,018,539
Services & Supplies 35,892,264 39,835,451 48,452,077 28,421,808
Depreciation 0 21,709,674 18,000,000 30,000,000 Other Charges 3,788,131 8,058,239 12,395,900 14,835,828 Fixed Assets (*) Land 0 0 0 0 Improvements 0 0 0 0 Equipment 107,532 198,022 456,300 327,000 Interfund Charges/Reimb 5,900,000 0 0 0 Contingency 0 0 0 500,000
Total Operating Expenses ,2,01 ,2, ,,2 10,10,1
Net Operating Income (Loss) 1,694,540 (18,812,714) (29,455,677) (45,564,373)
NONOPERATING REVENUES (EXPENSES)
Interest Income 892,483 1,285,741 800,000 900,000
Interest Expense 0 (287,314) (1,000,000) (412,338)
Depreciation Offset - MEMO ONLY 0 0 18,000,000 0
Total Nonoperating
Revenues (Expenses) 2, ,2 1,00,000 ,2
FUND # 2A (continued) BUDGET UNIT # 00000
Operating Details Actual
200-0 Actual 200-0 Adopted 200-0 Requested & Recommended 200-0
Sources of Working Capital
Net Income 2,587,023 (17,814,287) (11,655,677) (45,076,711)
Depreciation 0 21,709,674 0 30,000,000
Total Sources 2,,02 ,, (11,,) (1,0,11)
Uses of Working Capital
Fixed Asset Acquisitions (*) 0 0 0 0
Bond Principal Payment (*) 0 0 0 0
Reserve Contribution 1,872,213 0 0 0
Total Uses 1,2,21 0 0 0
Increase (Decrease) in Working
Capital 714,810 3,895,387 (11,655,677) (15,076,711)
Beginning Working Capital 11,414,218 11,655,677 11,655,677 15,551,064
Ending Working Capital 12,129,028 15,551,064 0 474,353
(*) Formal enterprise budgeting does not include budgeting for acquisition of fixed assets or the principal portion of debt service . As FY 2007-08 is a transition year between governmental budgeting and enterprise budgeting, these categories of expenses are included in Operating Expenses .
CSD-1 Operations Top 10 Accounts*
Fiscal Year 2007-08
Contributions to Other Agencies $,0,000 This account is for contributions to other agencies, which include a $6 million loan repayment for the Bond-Waterman property to the Sacramento Regional County Sanitation District (SRCSD), $10,000 to the Business Environmental Resource Center (BERC), $5,000 to the Effie Yeaw Nature Center and $40,000 for a sponsorship at the Safety Center . This is a decrease of $45,000 from the 2006-07 budget .
Contributions to Other Funds $,0,0
This account is for contributions to other county funds, including $1,207,100 for the purchase of six pieces of heavy equipment, $200,000 to develop a plan to facilitate septic tank conversions and $2,232,890 for developer reimburse-ment projects for which CSD-1 Operations is advancing funds . The developer projects will be offset by trunk reim-bursements from the CSD-1 Trunk Fund and other revenue sources at a later date . This is an increase of $913,590 from the 2006-07 budget .
Bad Debt Expense $,00,000
This account is for the write-off of uncollectible customer accounts . A majority of the debt is offset by revenue received when the bad debts are transferred to the Teeter Tax Program . No change from the 2006-07 budget .
Municipal Services Agency MIS Support $2,, This account is for MIS contractor support for projects and computer maintenance costs provided by the Municipal Services Agency . This is an increase of $575,026 from the 2006-07 budget due to increased needs for contractor sup-port for MIS projects .
Utility Billing Services $2,2,12
This account is for the allocated cost of Consolidated Utility Billing Services to provide customer billing for CSD-1 and SRCSD monthly sewer service customers . This is a decrease of $384,147 due to a new cost-sharing plan between Water Resources, Waste Management and Code Enforcement .
County Facility Use Charges $2,111,2
This account is for costs paid to the County of Sacramento for the Ecology Lane and North County office buildings, corpora-tion yards and the South Warehouse on Conservacorpora-tion Way . This account is partially offset by rental payments received from SRCSD, Water Resources and Fleet Services . This is an increase of $43,178 from the 2006-07 budget .
Equipment Rental – Heavy $2,0,
This account is for costs paid to the General Services Fleet Division for fuel, maintenance and replacement costs of the fleet of heavy equipment . This is an increase of $452,463 from the 2006-07 budget due to higher fuel costs .
Chemical Supplies $1,0,000
These are the projected chemical costs to operate and maintain the collection system pump stations, lift stations and pipeline facilities . This is an increase of $600,000 from the 2006-07 budget due to CSD-1 converting from chlorine to bioxide at some facilities, which is more expensive . Bioxide is easier to administer by maintenance and operations staff, and safer than chlorine for the environment .
Insurance Liability $1,0,10
This account is for the allocated cost paid to the County Department of Risk Management for liability insurance for the district’s pipeline and facility pump stations . This is an increase of $40,470 from the 2006-07 budget .
Water Quality Services $1,2,000
This account is for costs paid to the Sacramento Regional County Sanitation District for administrative support services, assistance during sanitary sewer overflows, operating the Walnut Grove and Courtland treatment plants, and monitor-ing the SCADA alarm system for CSD-1 facilities on swmonitor-ing, graveyard and weekend shifts .
Date Monthly Charge July 1, 1995 $4 .50 July 1, 1996 $4 .50 October 1, 1997 $5 .00 October 1, 1998 $5 .00 October 1, 1999 $5 .50 October 1, 2000 $5 .50 October 1, 2001 $6 .90 October 1, 2002 $7 .90 October 1, 2003 $9 .70 October 1, 2004 $11 .50 July 1, 2006 $13 .00 July 1, 2007 $14 .00
CSD-1 Monthly
Service Charge History
Year Fee Per ESD*
March 1, 1995 $379 March 1, 1996 $382 March 1, 1997 $390 March 1, 1998 $460 March 1, 1999 $470 March 1, 2000 $473 April 28, 2001 $600 April 1, 2002 $720 April 1, 2003 $720
Two-Tier Fee (Effective July 1, 200)**
Relief Expansion
CSD-1 Budget Schedule
Trunk Fund
Fiscal Year 2007-08
FUND # 2A
BUDGET UNIT # 00000
Operating Details Actual
200-0 Actual 200-0 Adopted 200-0 Requested & Recommended 200-0
Charges for Services 12,472,046 17,751,711 20,032,400 23,765,600
Other Revenues 720,882 154,564 694,791 0
Total Operating Revenues 1,12,2 1,0,2 20,2,11 2,,00
OPERATING EXPENSES
Services & Supplies 7,755,614 7,494,172 18,571,187 12,022,920
Other Charges 6,590,356 5,729,328 15,395,000 14,842,000
Debt Service (*) 5,888,323 6,243,877 6,365,884 1,764,000
Fixed Assets (*) 0 0 0 0
Improvements 6,113,518 5,180,930 18,235,415 22,662,800
Interfund Charges/Reimb (5,900,000) 0 0 0
Total Operating Expenses 20,,11 2,,0 ,, 1,21,20
Net Operating Income (Loss) (7,254,883) (6,742,032) (37,840,295) (27,526,120)
NONOPERATING REVENUES (EXPENSES)
Interest Income 1,147,757 3,114,513 500,000 675,000
Interest Expense (375,535) 225,321 0 (4,568,033)
Debt Issue Financing (32,003,192) 0 0 0
Total Nonoperating
Revenues (Expenses) (1,20,0) ,, 00,000 (,,0)
FUND # 2A (continued) BUDGET UNIT # 00000
Operating Details Actual
200-0 Actual 200-0 Adopted 200-0 Requested & Recommended 200-0
Sources of Working Capital
Net Income (38,485,853) (3,402,198) (37,340,295) (31,419,153)
Total Sources (,,) (,02,1) (,0,2) (1,1,1)
Uses of Working Capital
Fixed Asset Acquisitions (*) 0 0 0 0
Bond Principal Payment (*) 0 0 0 0
Reserve Contribution 6,000,000 0 0 0
Total Uses ,000,000 0 0 0
Increase (Decrease) in Working
Capital (44,485,853) (3,402,198) (37,340,295) (31,419,153)
Beginning Working Capital 60,437,529 37,340,295 37,340,295 33,938,097
Ending Working Capital 15,951,676 33,938,097 0 2,518,944
(*) Formal enterprise budgeting does not include budgeting for acquisition of fixed assets or the principal portion of debt service . As FY 2007-08 is a transition year between governmental budgeting and enterprise budgeting, these
CSD-1 Budget Schedule
Rehabilitation-Capital Outlay Fund
Fiscal Year 2007-08
FUND # 2B
BUDGET UNIT # 00000
Operating Details Actual
200-0 Actual 200-0 Adopted 200-0 Requested & Recommended 200-0
Charges for Services 6,895,466 6,990,938 6,948,000 7,092,000
Other Revenues 1,763 84 0 0
Total Operating Revenues ,,22 ,1,022 ,,000 ,02,000
OPERATING EXPENSES
Services & Supplies 3,900,413 3,152,919 13,172,755 4,475,873
Other Charges 4,087 99,889 10,000 5,000
Debt Service (*) 3,925,548 4,162,584 4,243,922 1,176,000
Fixed Assets (*)
Improvements 6,195,284 5,991,201 32,873,719 22,620,000
Total Operating Expenses 1,02,2 1,0, 0,00, 2,2,
Net Operating Income (Loss) (7,128,103) (6,415,571) (43,352,396) (21,184,873)
NONOPERATING REVENUES (EXPENSES)
Interest Income 3,167,188 2,818,910 1,600,000 675,000
Interest Expense 0 150,214 0 (3,045,355)
Debt Issue Financing (21,335,461) 0 0 0
Total Nonoperating
Revenues (Expenses) (1,1,2) 2,,12 1,00,000 (2,0,)
FUND # 2B (continued) BUDGET UNIT # 00000
Operating Details Actual
200-0 Actual 200-0 Adopted 200-0 Requested & Recommended 200-0
Sources of Working Capital
Net Income (25,296,376) (3,446,447) (41,752,396) (23,555,228)
Total Sources (2,2,) (,,) (1,2,) (2,,22)
Uses of Working Capital
Fixed Asset Acquisitions (*) 0 0 0 0
Bond Principal Payment (*) 0 0 0 0
Total Uses 0 0 0 0
Increase (Decrease) in Working
Capital (25,296,376) (3,446,447) (41,752,396) (23,555,228)
Beginning Working Capital 68,651,503 41,752,396 41,752,396 38,305,949
Ending Working Capital 43,355,127 38,305,949 0 14,750,721
(*) Formal enterprise budgeting does not include budgeting for acquisition of fixed assets or the principal portion of debt service . As FY 2007-08 is a transition year between governmental budgeting and enterprise budgeting, these categories of expenses are included in Operating Expenses .
Detail Of Provisions For Reserves/Designations
Schedule 15
Fiscal Year 2007-08
Reserves/ Designations Amount Made Available for Financing by CancellationIncrease or New Reserves/ Designations to be Provided in Budget Year Total Reserves/ Designation Fund
No. CSD-1 Fund June 30, 2006Balance as of mended
Recom-Approved/ Adopted by the Board of Directors Recom-mended Approved/ Adopted by the Board of Directors Budget Year 240 2000 Revenue Bonds Fund General Reserve 51,123 0 0 0 0 51,123 20 TOTAL 1,12 0 0 0 0 1,12 267 Operating Fund General Reserve 5,372,213 0 0 0 0 5,372,213 Reserve for Replacement 4,800,000 0 0 0 0 4,800,000
Reserve for NCCY
Repayment 12,000,000 0 0 0 0 12,000,000 2 TOTAL 22,12,21 0 0 0 0 22,12,21 268 Trunk Fund Trunk Improvements Reserve for Construction 15,743,336 0 0 0 0 15,743,336 Rate Stabilization Reserve 7,000,000 0 0 0 0 7,000,000 2 TOTAL 22,, 0 0 0 0 22,, GRAND TOTAL ,,2 0 0 0 0 ,,2
CSD-1 2007-12 Capital Improvement Program*
As approved by the District Board of Directors in November 2006
Project Name Description Total Project2007
Cost * Start Date End Date Other Factors
Rio Linda/Dry Creek
Relief Project New replacement sewer along 5
th
Street, K Street, and 6th Street; new
replacement sewer along L Street, 6th
Avenue and K Street in Rio Linda .
$6 .1 million 2004/05 2008/09
Watt Avenue Sewer
Replacement New replacement sewer along Watt Avenue between Bainbridge Drive and
Owens Way, and new parallel sewer along Watt Avenue between Owens Way and Elkhorn Boulevard .
$1 .6 million 2005/06 2007/08
Larry Way Pump
Station Upsizing New pump station to replace existing station S-16 . $5 .0 million 2004/05 2008/09
Don Julio Boulevard
Sewer Replacement Diversion sewer to the future Upper Northwest Interceptor at the
intersection of Don Julio Boulevard and Elkhorn Boulevard .
$5 .1 million 2006/07 2010/11
Random/Arden Creek Sewer Replacement
New replacement sewer along Random Lane, Arden Creek Road and
Watt Avenue . $8 .0 million 2004/05 2007/08
Arden Way/Bell
Street Diversion Diversion sewer to the existing Interceptor along Bell Street . $0 .7 million 2005/06 2007/08
Berkshire/Sun Maiden Replacement
New replacement sewer along Berkshire Way, Maison Way, Rowena
Way and Hurley Way . $4 .5 million 2004/05 2007/08
Rollingwood Boulevard Sewer Replacement
Upsize existing 12” sewer in
Rollingwood Boulevard from Antelope
Avenue to Oakberry Way . $2 .4 million 2007/08 2010/11
Pasadena Avenue
Relief Sewer Parallel existing sewer in Pasadena Avenue from Spencer Way to Cypress
Avenue . $3 .7 million 2005/06 2010/11
International Drive
Sewer Diversion New sewer along International Drive between Capital Center Drive and
Reserve Drive to divert flow to a new 72” Bradshaw Interceptor . Abandon Capital Center pump station and force main along International Drive between Reserve Drive and Zinfandel Drive .
CSD-1 2007-12 Capital Improvement Program*
Project Name Description
2007 Total Project
Cost * Start Date End Date Other Factors
Old Auburn Pump Station and Relief Sewer
Diversion to a new pump station; force main in Old Auburn Road from Robert Creek Court to Daffodil Way; new sewer in Old Auburn Road from Daffodil Way to Fair Oaks Boulevard, connecting to the Upper Northwest Interceptor .
$11 .2 million 2004/05 2009/10
Sunrise/Penn Pump Station and Relief Sewer
Diversion to a new pump station; force main in Sunrise Boulevard, Sunhill Drive, Birdcage Street and Uplands Way from Arcade Creek to Primrose Drive; new sewer in Primrose Drive and Pennsylvania Avenue from Birdcage Street to Sunset Avenue, con-necting to the Sunrise Interceptor .
$19 .5 million 2004/05 2008/09
Beech Oak Sewer
Diversion Oak Avenue from Beech Avenue to Hazel Avenue (divert flow from 6”
sewer in Beech Avenue to new Oak Avenue pump station) .
$0 .9 million 2004/05 2008/09
Mariposa Avenue Pump Station and Force Main
Divert to a new pump station on Mariposa Avenue at Pleides Avenue; force main in Mariposa Avenue and Madison Avenue to Primrose Drive .
$3 .7 million 2004/05 2007/08
Center Parkway Pump Station Improvement
Upsize existing pumps; new
replace-ment sewer along same alignreplace-ment . $1 .1 million 2008/09 2010/11
Walnut Grove Pump Station and Force Main
In response to a more stringent operating permit, the treatment plant will be closed and a pump station and force main constructed .
$15 .3 million 2004/05 2008/09
Courtland Pump Station and Force Main
In response to a cease and desist order, the treatment plant will be closed and a pump station and 15 miles of force main constructed .
$11 .8 million 2004/05 2007/08
Trunk Projects –
Category 2 A number of master plans identified trunk relief projects to provide sewer
capacity for existing customers and future growth .
$80 .0 million 2011/12 2020/21
Marconi/Bell Sewer
Replacement Upsize sewers along Marconi Avenue between Watt Avenue and Bell Street . $3 .9 million 2007/08 2010/11
Maryal Easement
Sewer Replacement Upsize sewer between Eastern Avenue and Watt Avenue parallel to Maryal
Drive and Ione Street . $1 .4 million 2007/08 2010/11
Saybrook Sewer
Replacement Upsize existing sewers in Saybrook Drive between Stonehand Avenue and
Biglow Drive $1 .8 million 2007/08 2010/11
Pecan/Madison
Sewer Replacement Upsize existing sewers from the inter-section of Pershing Avenue and Pecan
Avenue to Madison Avenue . $1 .3 million 2007/08 2010/11
Main/Arden Gold
Sewer Replacement Upsize existing sewers in easements east of Main Avenue north of the
CSD-1 2007-12 Capital Improvement Program*
Project Name Description Total Project2007
Cost *
Start Date End Date Other Factors
Templeton/Madison
Sewer Replacement Upsize existing sewers in Templeton Drive, Edgerly Way and Madison
Avenue from Millburn Street to east of Garfield Avenue .
$3 .1 million 2007/08 2010/11
Aerojet Sewer
Replacement Upsize existing sewer along Aerojet Drive between Baltimore Street and
Folsom Boulevard . $1 .4 million 2007/08 2010/11
Lower Center Parkway Sewer Replacement
Upsize existing sewer along Center
Parkway . $1 .0 million 2007/08 2010/11
Miscellaneous Sewer Diversion Projects
Includes Scotland Drive ($0 .1), But-terball Way ($0 .1), Old Auburn Road ($0 .1), Fair Oaks Boulevard ($0 .1), Sunset Avenue ($0 .1) and Orange Avenue ($0 .1) .
$0 .6 million 2006/07 2010/11
Condition
Assess-ment Assess existing condition of collection system to identify additional
rehabili-tation projects . $6 .0 million 2002/03 2007/08
Central Trunk Line severely corroded pipe from
Fruit-ridge Road to the SRWTP to extend its
useful life . $30 .0 million 2004/05 2009/10
Annual
Rehabilita-tion Projects A number of high-priority rehabilita-tion projects identified and prioritized
each year for immediate rehabilitation . $50 .1 million 2010/11 2020/21
$5 .0 million per year
SCADA Supervisory Control and Data
Acquisi-tion (SCADA) provides central moni-toring of all facilities, enabling staff to respond to emergencies and failures .
$5 .2 million 2005/06 2007/08
RCP Trunk
Rehabili-tation Rehabilitate reinforced concrete pipe showing corrosion . $40 .0 million 2007/08 2011/12
Small Pipeline
Rehabilitation Annual rehabilitation of various small pipelines in the service area . $28 .0 million 2007/08 2020/21 $2 .0 million per year
Pump Station
Rehabilitation Annual rehabilitation of various pump stations . $12 .5 million 2007/08 2011/12 $2 .5 million per year
Five-Year Project Cost Total $11. million * Total Project Costs extend beyond the 2007-08 fiscal year and are in Year 2005 dollars.