Observations

Hazards and Consequences

Control measures

Immediate and Longer-term actions

Timescale

1. Over speed of vehicles entering the premises of Borouge 3.

Risk of vehicular accident which may result serious injury or damage to property or may result early death.

Safety speed limit must implement inside premises by displaying the appropriate speed for light vehicles and for buses/trucks and heavy equipments.

Giving of training and awareness for safe driving to all sub-contractor drivers.

Regular maintenance conducted by a competent person and third party must approved.

Valid driver’s license with

authorisation of Borouge 3 and UAE Transportations.

Segregation of vehicular and pedestrian routes must in place.

Immediate

1 day

Weekly

weekly

Immediate

2. Uncontrolled waste such as papers, plastics, pieces of

Giving training and awareness on handling a proper disposal of waste

(2)

woods and other combustible materials are accumulated around premises of Borouge 3.

Risk of biological hazards on handling waste that may lead ill-health.

and may be recycle process may applicable to develop wider environment.

Upon handling of garbage

attendant must wear suitable PPE such as gloves (rubber), respiratory and proper hand wash of workers after handling of waste may

introduce to prevent ingestion from the waste.

Daily

3. Fire exit, Access and

egress have been obstructed. Due to poor housekeeping and poor stacking of

materials. i.e. pipes, debris, etc. near the assembly point.

Remove or clear all materials to ensure access/egress are free from obstruction to avoid trip, slip and fall of the operatives.

Supervisor review the working area to ensure redundant materials are promptly removed or must stack in the designated stacking area only. Educate operatives through Tool Box talk on housekeeping in the work place.

Immediate

1 week

(3)

4.Unsafe condition on the lifting gear (chain sling) the hook latches were missing.

Unsafe lifting operation. Foreman in charge assigned incompetent banks man to sling loads.

Monthly colour code inspection of the sling has not implemented.

Instructed to remove the chain sling from service.

Instructed to have a thorough inspection carries out in all the lifting gear prior to use.

Training plan for the month this is to include banks man training, hence to ensure that the Lifting activities should be carried out only under the supervision of competent supervisor and banks man. This is to ensure that all lifting accessories are thoroughly

examined by a competent person every 6 months. All lifting

accessories that have been thoroughly examined by a competent person.

Immediate

1 month

6 months

5. Lack of information on the hazardous substance (Diesel Oil) used in carpentry area.

All hazardous substances which are pose a risk to workers health( i.e. skin and eye irritation, etc.) must have a manufacturers safety data sheets (MSDS) available to be used as a guide inconducting risk

(4)

The copy of Material Safety Data sheets (MSDS) on the Hazardoussubstance is not available in the site safety office, site nurse office, Supervisor &operatives.

assessment and to ensure

Appropriate PPE, proper storage of the substance, etc.

MSDS should be known and

maintained a copy to Safety officer, Supervisor, Site Nurse and

Operatives.

Carry out COSHH Risk assessment of the chemical.

Management should plan a COSHH Training to be attended by Foreman and operatives. The training is to Highlights the acute and chronic adverse effects of the all hazardous substances.

1 week

(5)

6. Overloaded dump trucks carrying sand and soil which may cause falling of rocks from the load and may hitting other vehicles nearby. Risk of vehicular

accident/incident due to over loading.

Safety net to cover the load for dumps truck to prevent hitting other vehicles.

Training and awareness on loading and unloading of loads.

Traffic enforcer inside the site must visible and monitor the outgoing and incoming of vehicles and must follow safety speed limit.

Immediate

1 day

Daily

7. Hand tools inspection is not in place. Since we found unsafe hand tools (loose hammer head, chisel with a mushroom head and

makeshift hand tools at the carpentry area).

Remove defective and fabricated tools from service.

Daily inspection of hand tools prior to use.

Weekly tool box talk regarding hand tools on how they will use safely. Monthly inspection to be carried out at the designated quarantine area by competent person. This is to ensure only safe hand tools to be issued in the work place.

Immediate

Continuous Weekly

(6)

Enable to work with circular saw machine push stick should be provided.

Highlights in the Tool box talk regarding the importance of push stick whilst working with the machine.

Daily

8. Wearing of loose cloths and jewellery’s while using portable tools such as grinder.

Risk of entanglement at drawing in to rotating nip point which may cause cutting of fingers.

Giving training and awareness on how to handle portable tools. Adequate supervision is necessary. Routine inspection to all (PAT) portable power tools and put colour coding sticker as indication of inspection.

Using of adequate PPE such as respiratory (dust), gloves (cotton), hearing defender (ear plug),

goggles (clear).

1 day

Continuous Continuous

(7)

9. Open trenches alongside the road of workshop.

Risk of falling of person which may result fracture of bone after being fall and risk of vehicular accident.

Permit to work must imply.

Giving training and awareness with regards on excavation preparation such as access egress, caution signs (deep excavation) to warn people, hard barricade and competent person.

Segregation of vehicles and pedestrian routes.

Assign stationary traffic man to guide vehicle and people.

Emergency arrangement should in place. in every shift 1 day Immediate Immediate Immediate 10. Overloaded outlet as main sources of electricity supply.

Risk of electrocution may cause of short circuit and may result fire and early death.

Provision of Permit to work must imply.

Fire drill may introduce to familiar route and emergency procedure. Training and awareness and LOTO must require.

Immediate 1 day

1 day

(8)

Using of RCD for PAT to reduce the flow of electricity in the body after any short circuit occur or accident.

Isolation of the area to prevent person by coming into contact with it.

Supervision is necessary.

Immediate

Continuous 11. Unprotected temporary electrical

distribution boards and without warning sign at the engineers office.

Monthly Testing and maintenance of the distribution boards can only be undertaken by competent electrician.

1 week

12. Lack of adequate illumination in the store room.

Provide sufficient lighting in the room.

Train and educate every one regarding the insufficient light effects in work environment. Management in charge in maintenance of the office compound should review all defective lighting features in the office, store room and in the work place.

3 weeks

Immediate 1 week

13. Equipment daily and monthly inspection records are outdated.

Trained and educate operatives who are involved in refuelling of plants/equipment and

machineries.

(9)

14. PPE such as hard hat, hand gloves, eye protection are not stored

appropriately in the safe storage room found laying in the ground elsewhere in the site office

Risk of falling from height due to defective fall arrest system issued to worker.

Responsible person must Review records of PPE. Replacement of defective PPE should be done as per company policy.

Recorded equipment daily inspection report by operator prior to operate equipment and workers should report any damages or tampered PPE’s issued by the company or using of their co-worker.

Immediate

Continuous

15. One generator set behind the site office without proper containment wall.

Remove contaminated soil immediately.

Construct adequate containment wall underneath the generator to avoid soil contamination in the ground.

Trained and educate operatives who are involved in refuelling of plants/equipment and

machineries.

Immediate 1 month

Immediate

16. Smoking of workers at designated smoking area without the presence of fire extinguisher.

Risk of fire of any combustible materials around the place which may cause early death and damage to property.

Implement no smoking inside premises to prevent fire.

Implement penalty system so that workers

(10)

17. Demolition of temporary office of sub-contractor and warehouses inside the borouge 3 premises.

Risk of premature collapse of structure, falling object, noise, dust and the presence of flammable substances of hazardous material.

Giving training and awareness to educate operatives on handling equipment using in demolition. Demolition permit must approved by the relevant

authority/government.

Avoid of using explosive material to prevent damages of other facilities nearby.

All workers must wearing their personal protective equipment such as hearing defender (muffs or plug), respirator for dust, fitted jacket or cover all, PFAS or personal fall arrest system, hard hat, gloves, goggles.

Immediate

immediate

never

Continuous

18. Improperly arrange or not well organized equipments inside the warehouse. Risk of tripping with the unfolded cords of equipments that may cause scratches or serious personal injury may

Giving awareness to educate operatives with regards good housekeeping and neatly workplace to prevent trips and slips.

Regular lubrication and check up of equipment must in place to prevent sparks.

(11)

occur.

Organized of equipment to a place away from walkways and vehicles route.

19. Unventilated buses assigned as workers service for coming in and outgoing from work.

Risk of heat stroke or heat stress and discomfort may occur.

Provision of good ventilation to all transportation service of workers and would be better air-conditioned to prevent discomfort, heat stress and stroke.

Giving awareness on dealing with the hot or heat weather.

Advice workers must sleep atleast 8 hours every night and also by adding more salt to their food to avoid muscle crumps.

Conduct regular check up to workers to identify illnesses. 20. Risk of fall from height

when workers dismantling of scaffolding.

Permit to work must imply. Barricade the area to prevent unauthorised person by coming in.

(12)

Caution sign must in place to warn people.

Weather condition must observe. PPE must be wearing during work such as hard hat, cover all uniform, goggles, harness and gloves.

References

Related documents

(vi) Upon commencement of construction, the Contractor shall carry the trip ticket (Disposal Delivery Form) issued by the project officer for every vehicular trip transporting

The Asbestos Awareness Course is aimed at operatives whose work could foreseeably expose them to asbestos, such as those who work in the maintenance and demolition

I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his agent and we agree to

Consumers Want Someone That “Looks Like Me” • Many consumers resent bad celebrity behavior and feel duped:.  Michael Phelps (marijuana), Serena Williams (foul-mouthed, spoil

A motion was made by David Craycraft, seconded by Jamoya Cox that Certificate of Appropriateness #CA-21-016 be approved as presented, including the demolition permit for 29 and

 If Asbestos exists in the building, the report shall specify the location(s) of the asbestos. Prior to the issuance of the permit, a copy of the South Coast Air Quality Management