• No results found

CROSSRAIL MOVING LONDON FORWARD

N/A
N/A
Protected

Academic year: 2021

Share "CROSSRAIL MOVING LONDON FORWARD"

Copied!
34
0
0

Loading.... (view fulltext now)

Full text

(1)

CROSSRAIL

MOVING

 

LONDON

 

FORWARD

Simon

 

Pain

Principal

 

Programme

 

Supply

 

Chain

 

Manager

Zena

 

Christie

(2)
(3)

Project

 

70%

 

complete

Tunnelling

 

is

 

now

 

complete

Focus

 

on

 

fitting

out

 

stations

 

and

 

tunnels

(4)

Laing

 

O’Rourke

(5)

C422

 

– Upcoming

 

Packages

C422

 

2015

Lighting

 

Control

 

(Framework)

UPS

 

(Framework)

Thermal

 

Insulation

 

&Trace

 

Heating

A/C

 

Splits

LV

 

Switchgear

 

(Includes

 

ATSs

 

&

 

Busbar)

BMS

 

Controls

 

(Non

Framework)

Air

 

Handling

 

Units

 

(AHUs)

Lightning

 

Protection

 

&

 

Earthing

Distribution

 

Boards

Chillers

Luminaries

 

(Includes

 

connections

 

&

 

drums)

Dampers

 ‐

Smoke

(6)

C422

 

– Upcoming

 

Packages

C422

 

2015

(Continued)

Armoured

 

&

 

Sub

mains Cables

Fans

 

(Extract

 

&

 

Supply)

Attenuators

Grilles/Diffusers/Louvres

Small

 

Transformers

AV

 

Mountings

Heaters

 

(Electric panel

 

&

 

Water)

2016

Cable

 

Pulling/installation

Water

 

Treatment

Plant

 

(Shift

 

&

 

lift

 

)

Sanitary

 

ware

Various Pumps

 

(Water/foul/sewage)

Peter Martin - [email protected]

(7)

C435

 ‐

Farringdon

BFK

(8)
(9)

C435

 

– Upcoming

 

Packages

(10)

C512

 ‐

Whitechapel

(11)

C512

 

– Upcoming

 

Packages

Subcontract

 

packages

 

will

 

be

 

sought

 

for

 

the

 

following:

Fire

 

Systems

 

– Detection

 

and

 

Suppression

Busbar Installation

Rainwater

 

Harvesting

PV

 

Array

LV

 

Switch

 

gear

Lightning

 

Protection

Water

 

Treatment

Mechanical

 

Commissioning

Sub

main

 

cable

 

installation

(12)

C512

 

– Upcoming

 

Packages

Supply

 

Only

 

contract

 

will

 

be

 

sought

 

for

 

the

 

following:

Luminaires

Automatic

 

Transfer

 

Switches

Pressurisation

 

Units

Water

 

Treatment

 

Plant

Chillers

Pumps

 

– Chilled

 

water,

 

foul

 

water

 

&

 

sump

 

pumps

Air

 

Handling

 

Units

(13)

C512

 ‐

Timing

MEP

 

Procurement

 

for

 

the

 

main

 

station

 

does

 

not

 

begin

 

in

 

earnest

 

until

 

the

 

design

 

is

 

complete.

  

This

 

is

 

substantially

 

finished

 

and

 

is

 

now

 

in

 

the

 

final

 

stages

 

of

 

sign

off.

  

BBMV

 

will

 

then

 

be

 

procuring

 

these

 

packages

 

over

 

an

 

8

 

month

 

period

 

with

 

the

 

majority

 

being

 

procured

 

in

 

the

 

first

 

4

 

months.

(14)

Women

 

into

 

Construction

Funded by the CITB

to support

gender diversity in construction.

Support for women:

• Outreach, advice and guidance,

training, work-placements and

brokerage into jobs.

Support for contractors:

• Assisting them to engage with

trained women wishing to enter

the construction industry

• Free supported work-placements

and jobs brokerage.

• Help with meeting CSR targets

and addressing skills gaps.

• Recognition of their

achievements

(15)

Women

 

into

 

Construction

Contact

 

us:

Kath

 

Moore

0791874088

[email protected]

[email protected]

(16)

C610

 ‐

Systemwide

(17)

C610

 

– Current

 

Status

70%

 

of

 

packages

 

awarded

 

so

 

far,

 

worth

 

c£48m,

 

based

 

on

 

current

 

instructed

 

scope

Remaining

 

business

 

opportunities

 

worth

 

c£5

 

(18)

C610

 

– Upcoming

 

Packages

 Tunnel walkways

 Tunnel Ventilation Steelwork  Attenuators

 Tunnel drainage pumping system  Tunnel lighting & Power Panels  Tunnel Ventilation System  Ventilation Control Systems  Variable Speed Drives

 Cable Management Systems  Cross passages doors

 M&E Labour Supply

 Lighting and LV Cables Supply  Transitions and TVS Installation

 Signage, labelling, asset tagging  Hit and Miss dampers

 Tunnel Fire Mains brackets  Tunnel Fire Mains fire protection  Trace heating and thermal insulation  TVS Environmental Sensors

 MCC’s for Pumps

 Cross-passage sump lifting and access

equipment

 Points heating system  Accelerated Life Testing

Done

(19)

CompeteFor

Opening the supply chain for Local and

SME Suppliers

Adam Compton

Key Accounts Manager

www.competefor.com

(20)

Introduction

• CompeteFor is an online portal designed to publicise contract opportunities for capital buying programmes

• Service created for the London 2012 Olympic and Paralympic Games, to match buyers and suppliers, encouraging equality and transparency of opportunities

• Commitment from Major Buying Programmes to procure responsibly

• CompeteFor has expanded beyond its original remit, to incorporate additional supply chains:

– Crossrail

– TfL’s Northern Line Extension – Thames Tideway Tunnel

– Transport for London – HS2

(21)

Service Delivery

• The CompeteFor service is operated on behalf of the Mayor of London through Transport for London

• The service is provided by a partnership between BiP Solutions and London Business Network (LBN).

(22)

CompeteFor - What we do

• UK wide supply chain development portal, designed to open up major supply chains

• Deliver sustainable and measurable economic growth

• Community benefits, via visibility of opportunities

(23)
(24)
(25)

Supplier Features

• FREE to register AND respond to CompeteFor supply chain opportunities

• Additionally, FREE geographical area of ‘Researched Opportunities’

• More business categories based on CPV codes

• Alert and Business Profiles – Promote your business

Register

Self Certified

Supply Chain Opportunities

(26)

CompeteFor

(27)

Crossrail and CompeteFor

• Crossrail have adopted CompeteFor to help ensure that these opportunities are opened up to the widest possible market

• Crossrail’s contractors are required to advertise all appropriate

opportunities on CompeteFor, to drive innovation in the supply chain

• Over 2,250 Crossrail Supply Chain opportunities posted to date on CompeteFor

(28)

Crossrail and CompeteFor

Example: Live Opportunities

Opportunity Tier 1 CompeteFor Response

Deadline

C512 Whitechapel Station - Copper and Brass Cladding Works

BBMV joint venture 12/12/15

C610 - Trace Heating, Lagging and Fire

Stopping

ATC joint venture 27/11/15

C512 Whitechapel Station – Station

Architectural Metalwork

(29)
(30)
(31)

Tips / Hints

Business Profile and Alert Profile

The alert profile sets up the automated email alerts,

providing you business relevant leads and opportunities on a daily basis.

Business profile enables buyers to see your

business details when sourcing companies

(32)

CompeteFor

0845 217 7804 - Helpdesk

Adam Compton

Tel: 07904995679

[email protected]

Key Accounts Manager

(33)

Contacts

[email protected]

Crossrail

[email protected]

Crossrail

[email protected]

CompeteFor

[email protected]

C512 Whitechapel

[email protected]

C435 Farringdon

[email protected]

C530 Woolwich

[email protected]

– C610 Systemwide

[email protected]

– C502 Liverpool Street

[email protected]

– C422 Tottenham Court Road

[email protected]

– C405 Paddington

[email protected]

– C412 Bond Street

(34)

www.crossrail.co.uk/suppliers

www.competefor.com

Webinar

 

will

 

be

 

made

 

available

 

on

 

the

 

Crossrail

 

website

 

References

Related documents

necessary to protect an equally important right or objective, which in the case of libel proceedings is the reputation or private life of others. In doing so this

The definition of ICE on the ASTM website (http://www.astm.org/Standards/F2761. htm) is “a medical system designed to safely provide data acquisition, and integration

The stochastic model presented here is the fi rst analytical solution to a transient probability distribution that can be applied to forecast pesti- cide concentrations in

According to the IDC report “Worldwide Bluetooth Semiconductor 2008-2012 Forecast,” published November 2008, a forthcoming radio frequency communication (“wireless

Early discharged hospital patients using mobile services (20% of total): 3.3 m Average costs for one hospital day: € 150* Average number of hospital days saved through early

This document estimates functions and creates projections for land-use related greenhouse gas emissions per unit of economic activity that are simple; are based on readily

Section 111 Stationary sources USEPA shall promulgate standards of performance for stationary sources to control emissions of air pollution that may reasonably

The configuration can be transferred to the BXxxxx or BCxx50 via fieldbus ADS protocol or with the serial ADS protocol.. The TwinCAT configuration can be used to link variables,