• No results found

Snow melting bias in microwave mapping of Antarctic snow accumulation

N/A
N/A
Protected

Academic year: 2020

Share "Snow melting bias in microwave mapping of Antarctic snow accumulation"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1. Mean relative differences (lated A06 SMB data set at M07 site measurements. Different inter-polation methods are Nearest Grid Point (A06-NGP) and averageof values within a radius of 20 (A06-20), 50 (A06-50) and 100 km±1σ) between various interpo-(
Table 2. Comparison between A06-100’s interpolated SMB data and different selections of corresponding observed SMB data (M07).a “Outliers” are discarded from the present statistics.b PF represent SMB data localized in areas characterized by Percolation Fac
Fig. 3. Comparison between observed SMB values from filteredobservational SMB data sets (M07) to interpolated SMB values av-eraged in 100 km resolution (A06-100) with distribution pattern ofobserved SMB points located in P ercolation Facies (PF∼meltingevent

References

Related documents

Systematic risk in homogeneous credit portfolios.. Bol, editor, Credit Risk; Measurement, Evaluation and Management; Contri- butions

Partial volume of high-grade tumour core with surrounding infiltrative tumour will lead to a continuum of spectral characteristics; hence with

Master of Arts Degree in IndustrialOrganizational Psychology THE CIRCULATORY SYSTEM Free Teacher Resources Tool Kit for Cultural Competence in Master’s and Doctoral The

We evaluated focused scores on three data sets of images of rodent liver sections exhibiting different amounts of dietary-induced steatosis.. The same evaluation was conducted with

 Chapter 3 describes a proposed method for facial expression recognition system with detailed process of face detection based on Bayesian discriminating feature

Given energy sources and sinks which will give the smart grid options for the flexible matching of energy supply and demand, a second class of technology is

The MSF for Capability Maturity Model Integration Process Improvement (MSF4CMMI) has more artifacts, more processes, more signoffs on milestones, more planning,

If central management decides upon the project centralization the project’s contribution will neither be observed by central management nor by the subordinate such that the decision