Affordable Innovations for
SAP ERP on SAP HANA for
the Midsize Enterprise
Xiaohua Wang SAP
KJ Min IBM
Learn how to setup your own SAP ERP on HANA
with Simple Finance demonstration and
evaluation landscape within few hours.
Learn the IBM service offering for your
personalized proof-of-concept project.
Learn SAP and IBM best practices to onboard
you to the latest innovation, be net new or be
install based implementation.
SAP preconfigured Simple Finance system provides you the
fastest access to your own evaluation landscape.
BEST PRACTICES -- Experience
Preinstalled SAP S/4HANA, on
premise enterprise edition landscape
80 + preconfigures E2E SAP ERP
business scenarios, empowered with
Simple Finance 2.0 function and
feature
Renewed UX with Fiori Apps for
transactions, for analytics and more
SAP S/4HANA, on premise enterprise edition
software appliance
User Experience & Analytics (preinstalled Fiori)
SAP ERP + Simple Finance 2.0 Add-on (preinstalled Best Practices Add-on
for localized ERP preconfiguration) SAP HANA Platform
Available as 30-day Trial within SAP Cloud Appliance Library
Available as blu-ray for own data center/on premise deployment
BEST PRACTICES -- Experience
30 – day trial in the cloud /AWS
hosted, deployable within 45 minutes
30 – day trial accessible via
http://try.saphana.com/erp
Order blu-ray via your
implementation partner via SAP note
2041140, deployable within few
SAP certified 1 TB
1IBM HANA Appliance (on premise, on cloud hosting with IBM)
Business Scenario Recommendations with SAP
IBM will take your sandbox environment
2, upgrade to SAP ECC 6.0 EhP 7 (or equivalent
for CRM, SRM and SCM) and then migrate to SAP ECC 6.0 EhP 7 powered by HANA
3
Upgrade Impact Analysis
Migration Impact Analysis
Activation of HANA Optimized T-codes
Rapid Deployment Solution Recommendations
POC Optimization and Business Value Proposition
4
Access to POC environment for 4 weeks
5BEST PRACTICES
– Proof-of-Concept
* POC offering is extended with incremental time and effort outside the Standard Offering
1Covers about 2 TB of Production Data before compression. Capacities bigger than 1 TB will have longer lead time and effort
2 IBM can take the copy of your production data, and stand up a hosted sandbox environment for upgrade. The timeline for POC will be extended to prepare for the environment 3The complexity increases for any upgrade from SAP ECC 5.0 and lower. JAVA stack separation will also require additional time and effort.
4Optional service requiring different skillsets
5POC environment can be purchased with all the contents beyond 5 weeks
BEST PRACTICES
– Proof-of-Concept
Engagement Preparation
1) Plan the engagement with IBM 2) Copy Production Data to Sandbox and mask confidential data 3) Sign Non-disclosure Agreement and give IBM access to your sandbox environment
4) Target HANA environment setup in IBM DST, Lexington, KY
Upgrade to HANA compatible ECC 6.0 EhP 7 – week 1 to 2
– IBM will upgrade your sandbox to ECC 6.0 EhP 7
Migrate to ECC 6.0 EhP 7 powered by HANA – week 3
– Export from your Sandbox and import to IBM provided ECC 6.0 EhP 7 powered by HANA
Post Migration Activities, Upgrade and Migration Impact Analysis – week 4
Turn-on Optimized T-codes vs. Baseline Analysis – week 5
Access to POC environment – week 5 to 8 which can be extended
Week
Days 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 SOH H/W environment ready
Upgrade Pre-requisites Migration Pre-requisites Engagement Prep Upgrade to ECC EhP 7 Migration to HANA Database Post Migration Activities Post Migration Analysis Optimization Analysis Cutomer Access to POC
7 8
Planning 1 2 3 4 5 6
BEST PRACTICES
– on premise Install Based Implementation
Rapid Database Migration of SAP Business Suite to SAP HANA
Use the Database Migration Option tool to upgrade and migrate in one step from the existing
DB to HANA
Use the dedicated engineered service for the technical implementation of Simple Finance.
DMO = Database Migration Option tool SUM = Software Update Manager
SAP NetWeaver Application Server for ABAP 6.40 / 7.0x
SAP ECC 5.0, SAP ERP 6.0x SAP CRM, SAP SCM, SAP SRM
7.0x
SAP NetWeaver Application Server for ABAP 7.40
SAP ERP 6.0 EhP 7
SAP CRM, SAP SCM, SAP SRM 7.0 EhP 3 SAP HANA 1.0 SPS09 or higher Any DB
1.
DMO for
SUM
Simple
Finance
SAP NetWeaver Application Server for ABAP 7.40 S/4 HANA(sFIN)
SAP HANA 1.0 SPS09 or higher
BEST PRACTICES
– on premise Install Based Implementation
RDS Configuration Project plan Efforts Economical estimate Deliverables Delivery model Resources Architecture …ICC & Custom Code Mgmt.
Data Volume Optimization
Unicode Conversion
Operations Control Center
Installation of SAP HANA
Technical Upgrade
Database Migration
Strategy and Technical Design for SAP Business
Suite powered by SAP HANA
ERP/CRM/SCM/SRM version
# of add-ons
Size of the database
Unicode readiness
…
RDS Scope Options
Additional Services
SAP Simple Finance Add-On
Installation and Data Transition of SAP Simple Finance Add-on
Rapid Database Migration of SAP Business Suite to SAP HANA
BEST PRACTICES
– Net New Implementation
IBM Express for SAP Suite on HANA
• IBM Express for SAP combines the following sets of industry Best
Practices in a single instance: • Industrial Machinery and
Components
• Discrete Manufacturing • Fabricated Metals
• Consumer Packaged Goods • Wholesale Distribution
• High Tech – Electronics and Semiconductor/Photovoltaic • Human Capital Management • HANA Live, RDS and SAP Fiori
Apps enabled
• IBM developed SOH Business Use Cases