• No results found

Building an innovation based supplier portfolio: the use of patent analysis in strategic supplier selection in the automotive sector

N/A
N/A
Protected

Academic year: 2020

Share "Building an innovation based supplier portfolio: the use of patent analysis in strategic supplier selection in the automotive sector"

Copied!
32
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1: Kraljic purchasing portfolio (from Cox, 2015)
Figure 2: Generic patent analysis workflow (from Abbas et al., 2014)
Table 1: Body technology summary 2004-2014
Figure 3: Patent filings for body technology 2008-2014
+6

References

Related documents

growing with the addition of the Dallas Area Rapid Transit (DART) Blue Line Station and the Village of Rowlett Apartments/Commercial Center (a $35 M project that includes

Vents for horizontal stack offsets required by Section 711.3 shall not be required where the stack and its offset are one pipe size larger than required for a building drain [see

The bidder who submits the highest bid amount and /or win in the inter-se bidding (not below the Reserve Price) shall be declared as Successful Bidder and a communication to

One of the initial aims of segmentation is for speed calculation. The reason is that many of the significant features of native-to-native speech are reflected by delivery speed. By

4.5 Statement on the estimated measurement uncertainty relating to the test result where appropriate; measurement uncertainty information is provided if important for the validity

Since the external energy source is radiative and because of high working temperatures, it is particularly important to model radiative heat transfer to later predict the

ASI Business 22:00 Night at Hotel in Rome Hotel Boscolo: aleph-roma.boscolohotels.com ASI for DAMA crew. ESA for MagISStra

Traditional directions of space activities are: global satellite communications and television, high-accuracy satellite navigation, weather and ecological monitoring, Earth