• No results found

Proceedings of the 2019 Workshop on Widening NLP

N/A
N/A
Protected

Academic year: 2020

Share "Proceedings of the 2019 Workshop on Widening NLP"

Copied!
18
0
0

Loading.... (view fulltext now)

Full text

Loading

References

Related documents

CONCEPTUAL DESIGN OF WATER SYSTEM AND PROPOSED OPERATING PLAN CESI has developed a conceptual design for a proposed water system for the Ryan Park area

Social Welfare Maximization (Market Clearing) Trade Maximization subject to Lines built Upper-Level

Although some threshold proxy signature schemes, such as the Kim’s scheme (Kim, 1997), are nonrepudiable, they suffer a severe limitation; that the verifier cannot identity the

pertaining a variety of factors that might assist organizations to reduce employee turnover through increased retention strategies.. This section consists of two

JUN 12, 2014 The GA passes state budget, excluding Medicaid expansion and including sufficient barriers to Medicaid expansion. McAuliffe vetoes portion of the state budget that

STATEMENT OF INCOME — SCHOOL DEPARTMENT FOR THE YEAR ENDED DECEMBER 31,

Besides some small defect fixes it was only altered during Change 1: Common functionalities shared with other Main Processes were moved to the Business Function processes

To catch all benefits of chlorophyll and continue our research on multicomponent reactions [26-30], we introduce a green catalyst for the synthesis of