• No results found

Adjustment Manual Performance Test

N/A
N/A
Protected

Academic year: 2021

Share "Adjustment Manual Performance Test"

Copied!
17
0
0

Loading.... (view fulltext now)

Full text

(1)

Adjustment Manual

Performance Test

DWG No. 990 - 1 1 - 0 7 - 01 Date 97- 02

Europe Bill Acceptor

EBA - 10 - SD2

(2)

1 Adjustment Manual ... 990 - 13 - 01 2 Performance Test ... 990 - 13 - 01

(3)

Model

Approved by checked by person in charge

EBA - 10 - S D 2

(4)

1. Connect the EBA with the PC in the following manner.

Turn OFF the power and set both EBA-10/410 and VM-450 to the test mode.

Note: automatic adjustment can be performed while the stacker box is installed in the unit. When the guide block and mouthpiece are mounted on the insertion slot of the tray, remove them.

Tool required for adjustment

IFU- 001

Cable

Connect the cable to serial port

Automatic adjustment software

(5)

2 setting the EBA

(1) After confirming the VM-450 DIP switch setting EBA Dip switch setting. turn on Vm-450

(1) After confirming the VM-450 DIP switch setting and EBA DIP switch setting, turn on VM-450

(2) The BSY LED of VM-450 will light and "_000_ _00" will appear on the segment diplay. At this time. the LED next to the DIP switch of EBA will light.

This status is called the test mode. After the test mode, communications to the PC is enabled.

Requird PC: IBM PC/AT or compatible equipped with one or more PS-232C Communication ports

{D-sub 9 pins}.Communication port adress: 3F8 to 3FF (serial port 1)

OS: MS-DOS V6.0 (The oftware cannot be operated by windows and windows DOS prompt.)

4 starting up the PC adjustment Software

(1) Turn on the PC and start up MS-dos.

See the procedures in the relevant pc and MS-DOS manuals to turn on the PC and start up MS_DOS.

(2) When MS-DOS is started, set the floppy disk containing the adjustment software in the PC. (3) Change the current drive to the disk drive in which and djustment software floppy disk is inserted. For example ,when the floppy disk is set in drive A:, type "A:".

(6)

(1) When the adjustment software is started, the inital screen (screen 1)will appear. Confirm the model

name, type,and version (V*.**).

press "1" and enter key to select menu 1 (ADJUSTMENT).

1.ADJUSTMENT

2.END INPUT THE NUMBER

screen 1 (Inital Screen)

(2) set both EBA and VM-450 to the test mode, and turn on VM-450. Connect the

communication cable and confirm that EBA is put in the test mode. Then, press the Enter Key.

screen 2 Screen 2

(7)

(3) The intialization of the EEPROM is being

Screen 3

(4) The lever sensor is checked. (ON)

Screen 4

Open the EBA tray and set the paper to check the lever sensors at the following 3 locations

(150mm*70mm. copying paper, etc.

(8)

(5) The lever sensor is checked. (OFF)

Remove the paper from the tray and press Enter key. At this time , make sure to close the tray and close the knurls on both sides properly. (otherwise, the adjustment value will be incorrect.)

(6) Photo sensor adjustment 1

Screen 6

There is no need to open the tray. Insert the base paper

Make sure to place the base paper properly on the tray

(9)

(7) During photo sensor adjustment (approximately 15 seconds)

(8) Photo sensor adjustment 2

Place the base paper Ks-35 on the tray and the press the Enter key.

(9) During photo sensor adjustment (approximately 5 seconds) OPERATION

***********

*

************

Screen 7

Screen 8

(10)

(10) Photo sensor djustment 3

Remove the base paper and then press the Enter key.

(11)

(12) MAG sensor adjustment

Open the EBA tray and set the MAG board at the specified position

Set the portion marked "*A" at the MAG sensor position

After setting the MAG board, close the tray and the knurls on both sides propely.(Otherwise, the adjustment value will be incorrect

(12)

(13) MAG sensor adjustment

Move the MAG head test board forward and backward slowly to detect the peak value. the peak value is displayed on the MASSAGE screen.

(13)

(14) Feed speed check

Remove the MAG head test board from the tray and press the Enter key

(15) During the feed speed check

(14)

The adjustment has been completed . press the Enter key and then turn off VM-450. The program returns to the initial screen (screen1). To adjust another EBA, select menu 1 (ADJUSTMENT).

EBA is provided with a mode for confirming the bill receiving( identification) status. See the items in the attached " Test Mode " document for more information.

Do not use bills like the ones below to confirm the bill receiving operatin. If you insert such a bill, it will not be identified properly.

(a) Bills that are dirty, worn, wet, torn, and badly wrinkled. (b) Bills with folded and overlapped corners or edges.

(c) Bills that have cosiderably different cutting dimensions and printing displacement. (d) Bills that are stained or have iron particles on them.

(15)

6 Error Messages

When a trouble occurs during adjustment, an error message will appear on the OPERATION comment field or MESSAGE comment field and the adjustment will be interrupted. Repair or replace the parts in

accordance with the message.

You can also determine the trouble location from the error message displayed on the MESSAGE comment field.

(16)

MESSAGE-POSITION conversion diagram

You can determine the trouble location from the number of MESSAGE error list. The "UP" and DOWN indication in the figure are classifield based on the bill feed route

(17)

3 Description of Test Items

(1) Acceptor feed motor forward rotation test

Confirms the forward rotation speed of the acceptor feed unit. The feed speed is displayed on the VM-450

VEND1 and VEND2 turn on. Fast feed speed

VEND2 and VEND3 turn on. Correct feed speed

VEND2 and VEND3 turn on. Correct feed speed

(2) Acceptor feed motor reverse rotation test

The feed speed is displayed on VM-450 in the same manner a (1)."acceptor feed motor forward rotation test".

References

Related documents

In December 2013, the Texas Transportation Commission established Rule §25.27 of the Texas Administrative Code authorizing and requiring the Texas Department of Transportation TxDOT

The study was based on the following objectives: to establish the influence of funding on the implementation of rural electrification programme in Kieni East Sub County;

Eamples and the Thesis Statement: Thesis Statement: As long as your thesis statement doesn’t get too long, As long as your thesis statement doesn’t get too long, it’s a good

Matching geo-referenced data on the subnational allocation of Chinese development projects to Africa over the 2000-2012 period with 41,902 survey respondents across

The geology of layered gneisses in part of the Santa Catalina forerange, Pima County, Arizona Item Type text; Thesis-Reproduction (electronic); maps.. Authors Shakel, Douglas

Based on this new expression for Ca c , a three-regime theory is formulated to describe the interface (in)stability: (i) in Regime I, the growth rate is always negative, thus the

National Conference on Technical Vocational Education, Training and Skills Development: A Roadmap for Empowerment (Dec. 2008): Ministry of Human Resource Development, Department

Although the impact of marketing and/or operations capability on a firm’s financial performance has been studied (e.g. Song et al., 2005; Terjesena et al., 2011; Nath et al.,