Cross-border Economic

Cooperation

András Rákóczi Managing president

KIÚT Regional Development Association

(2)

STRATEGIC POSITION

IN THE NEW EUROPE

(3)

STRATÉGIAI PONTOK AZ ÚJ EURÓPÁBAN:

IMPORTANT BORDER CROSSING POINTS IN THE EUROPEAN UNION

(4)

PÁRATLAN ADOTTSÁGOK - STRATÉGIAI ELHELYEZKEDÉS

OUTSTANDING ADVANTAGES - STRATEGIC POSITION ELHELYEZKE-DÉS: EGYIK LEGFONTOSABB KELET-NYUGATI KÖZLEKEDÉSI FOLYOSÓ MENTÉN (V. sz. Transz-Európai Folyosó) LOCATED ON A MAJOR TRANSPORT CORRIDOR (No.5 Pan-European corridor

(5)

ZÁHONY ENSURES

EUROPEAN

C

ONDITIONS IN THE

NEIGHBOURHOOD OF

THE EASTERN

MARKETS

(6)

Railway on the border of HU-SK-UA

(7)

Vehicular heavy traffic in Záhony

(trucks/year) 0 20000 40000 60000 80000 100000 120000 140000 1998199 9 200 0 200 1 200 2 2003200420052006200720082009 belépő kilépő
(8)

Railway heavy traffic in Záhony

The volume of the railway transit in Záhony

0 1000 2000 3000 4000 5000 6000 ezer tonna Bejövő Kimenő

(9)
(10)

Trimodális logisztika

150 thousand trucks/ year

(11)

Logistic center

(12)

„KIÚT” REGIONAL DEVELOPMENT ASSOCIATION

Why was the KIÚT Regional Development

Association organized?

1990 – year of changes, Comecon broke

EU orientation in the economic connection.

The railway transit between Hungary-Ukraine

fell back

ƒ

1990 – 15 million tons, 7000 person

ƒ

2000 – 6 million tons, 2000 person

We are searching for expedient from this

(13)

„KIÚT” REGIONAL DEVELOPMENT ASSOCIATION

The Association was organized on 10th

of February 2000:

15 economic entity (

Co.’s & Ltd’s

)

3 Sub-regional association (31 local

government)

21 individual

Aims:

developing of vehicular, regional

development, logistic, economic,

(14)

A fejlesztési terület The development Area

(15)

MODERN, INTEGRATED LOGISTIC SERVICES BY THE PRIVATE COMPANIES

„ rail transport

„ rail-rail and rail-road transhipment „ storage „ customs warehouse „ packaging „ ROLA terminal „ Distribution centres „ Row material processing TRANSHIPMENT OF BULK GOODS LOADING BY CRANE LOADING BY SMALL EQUIPMENT HANDLING LIQUID CARGO CHANGING OF AXLES RAKTÁROZÁS WAREHOUSING SERVICES

(16)

The competitive Záhony

„ Geographical aptitude

„ Záhony and its area includes 94 km2

„ Functioning structure (wide gauge railway 150 km,

european gauge railway 300 km)

„ Qualified human resources „ Competitive transport fees „ Low lighterage

„ Customs

„ Other services (banks, insurance companies,

service stations)

(17)

FEJLETT ÜZLETI INFRASTRUKTÚRA ADVANCED BUSINESS INFRASTRUCTURE LOGISZTIKAI KÖZPONT LOGISTIC CENTRE IPARI PARK INDUSTRIAL PARK TERÜLET-FEJLESZTÉSI TÁRSASÁGOK REGIONAL DEVELOPMENT COMPANIES BANKI INFRASTRUKTÚRA BANKING INFRASTRUCTURE SZÁLLÍTMÁNYOZÓ CÉGEK TRANSPORTATION COMPANIES VÁMÜGYNÖK-SÉGEK CUSTOMS AGENT ACTIVITY

(18)

Configuration Plan

(19)

1. Establishment of an intermodal public industrial and logistical area

It is necessary to establish a 160ha industrial and logistical park in the area of Fényeslitke – Komoró in favor of the realization of the specific investor intentions

(24 MILLION EURO)

Goals of the project:

• Construction of wide-gauge and standard

European-gauge railway tracks until the border of the site

• Drinking water and municipal sewage network • Establishment of facilities to remove surface

water

• Establishment of telecommunications network • Construction of electricity and gas network

(20)

Industrial site

Actual stage of the project:

• The proprietary rights of the

RFH co. ltd. is registered

• The public procurement

procedure of the construction of municipal water supply

facilities, internal transport infrastructure and electricity is closed

Execution deadline: 29th August 2010

• The selection of the rail

infrastructure building contractor is in progress

Fullfilment deadline: 31st May 2010

(21)

2. a. Rail-tracks to be renewed

Renewing of 43 km wide gauge railway 30 million euro

(22)

2. b. Renewal of traffic way - 27 km 85 million EUR

(23)

Záhony and its Area flagship project

3. Supporting the small and medium enterprises operating

in the area

The elements of the project

Amount of state support: 3,1 billion Ft, the enterpreteneurs give 2 billion Ft own resources hereby 38 project were executed.

(24)

Záhony and its Area flagship

project

4. Development of secondary and high-level education helping

industrial-logistics and economic life, according to the needs of the measurable economic activities

(2 million Euro)

The elements of the project

(25)

Záhony and its Area flagship project

5. Complex international marketing, economic and

traffic-diplomatic programme (3 million EUR)

The elements of the project

(26)

Economic geography Worksla-Steel: Transport

Transporting steel block to Zahony By railway via Csop

By ship via Juzhnyi port forward to Duna-Tisza (Tisza is not shipped yet)

Южный

Чоп Комсомольск

Загонь

Poltava Ore processing Factory Worksla-Steel steel processing Factory Загонь Чоп Дунай Загонь

(27)

The sales markets of the products of the

companies

Eastern-southern-European countries,

Ukraine, Turkey, Greece and other states are the markets

of the products of the Worksla-Steel

Hungary

Using technological chain means

advantage in the car, machine and ship fabricated factory at

the Middle-east and the South-European

companies.

Загонь

(28)

Transportation ways and length of time

Szállítási útvonalak és id

ő

tartamok

(29)

Záhony

(30)

Further development plans

„

Establishing logistic center between Záhony and

Tiszabezdéd (private investment)

„

Variable gauge between Hungary-Ukraine

„

Creating joint industrial park on the

Hungarian-Ukrainian border

„

Development of transport links in the Baltic and

Black Sea regions

(31)
(32)
(33)
(34)
(35)
(36)
(37)
(38)

38 38

C

D

Effect of the study’s examination to clearway

of Záhony and its area

M34

M34 M34

M340 M340

The joint Hungarian-Slovakian-Ukrainian

Three border bridge variation is not Soluble economically (yellow line)

The „C” variation got into the development plans

(39)

Köszönöm megtisztel

ő

figyelmüket!

KIÚT Regional Development

Association

Address: 4625 Záhony, Európa square 20.

Tel.: +36-45-525-633 Fax: +36-45-525-634

E-mail: [email protected]

Web: www.kiut.hu

THANK YOU FOR YOUR

ATTENTION!

References

Related documents

We apply the hedonic price analysis to the Indian desi ghee to understand consumers’ perception and valuation of various quality attributes of ghee.. Results show that consumers put

Students needing 15 semester credit hours or less to gain equivalency (72 semester hours) may enroll in the DMin program under a provisional status. Students must complete

* limiting access to storage areas for hazardous chemicals (e.g., using key cards or cypher locks [remember to consult any relevant federal, state or local

The whole project process, from the curriculum development phase to the pilot implementation started in winter 2006 and the ongoing efforts to accredit the full programme

You can make it even more agile with the optional DYNAMIC BODY CONTROL suspension, which lets you individualise the vehicle’s damping and handling characteristics.. At the touch

The primary purpose of the Visiting Committee is to provide advice and support to the Maxine Goodman Levin College of Urban Affairs in its mission as a major academic, research,

The operative language in Section 1061(d) that modifies the general application of Section 1061(a) describes the gain that is subject to recharacterization as follows: “so

In addition to translating neuroscience discoveries to the clinic, we are also in a phase of using clinical findings (e.g., genetic or brain imaging data) from those with