• No results found

DESIGNING ONLINE SUPPORT GUIDES FOR LIBRARIANS MANAGING STEM MAKER ACTIVITIES

N/A
N/A
Protected

Academic year: 2020

Share "DESIGNING ONLINE SUPPORT GUIDES FOR LIBRARIANS MANAGING STEM MAKER ACTIVITIES"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

FIG. 2: Paper circuit do-it-yourself (DIY) guide for youth
FIG. 3: Leave it on the table, librarian-run activity examples, and “learn, make, share” model
FIG. 4: Various resources included in a tips and tricks instructional guide for the Osmo, an interactive augmented reality digital tool for the iPad that converts the user-facing camera into an instrument for detecting action that takes place on a surface in front of the iPad (see playosmo.com for more information)
FIG. 5: Librarian feedback form, with responses
+2

References

Related documents

Using stereoscopic format which encodes the color and depth image by the Content Adaptive Binary Arithmetic Coding (CABAC) scheme in the Joint Scalable Video Model (JSVM)

Transfer videos/pictures to your computer using the USB cable or an optional card reader.. Then format the card in the camera or

Policy recommendations included: reduce the number of sales tax rates, impose tax on all food purchases, eliminate the sales tax holiday, broaden the base, reduce taxes

Piezoelectric actuators are more and more common in testing machines, but they still reach limitations in terms of maximum displacement, cycling frequency or power..

Substitute acres have a positive effect on corn yield (an extra corn acre planted on acreage under other crop in the previous year in a county increases the average corn yield of

Risk or liquidity premium changes are changes in the rate at which expected corporate bond cash flows are discounted (expected return premium) that result from changes in the

Príklad: Predpokladajme, že VSPS podľa špecifikácie 4-prvkovej množiny paralelne realizovaných úloh (manažovaných pomocou VPÚ) skonštruuje 2 pracovné programové

Depending on your requirements, you will have to conduct a load check to verify that your potential office can sustain the equipment you’ll need for the operation of your