• No results found

otlontic cittj electtic

N/A
N/A
Protected

Academic year: 2021

Share "otlontic cittj electtic"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

(1)

Philip J. Passanante Assistant General Counsel 92DC42 500 N. Wakefield Drive Newark, DE 19702 302.429.3105 - Telephone 302.429-3801 - Facsimile [email protected]

otlontic cittj

electtic

An Exelon Compa,qy P.O. Box 6066 Newark. DE 19714-6066

December 5,2018

CASE MANAGEMENT

, ILL, [.j ,t-.~

VIA FEDERAL EXPRESS

an~OARD OF PUBLIC UTILITIES

ELECTRONIC MAlL

aida.camacho .,bpu.ni.us

TRENTON, NJ

board.secretar~(&bpu.ni.~ov

Aida Camacho-Welch

Secretary of the Board

Board of Public Utilities

44 South Clinton Avenue, 3rd Floor, Suite 314

P.O. Box 350

Trenton, New Jersey 08625-0350

RE:

In the Matter of the Implementation of L.~. 2018, c_. 16 Regarding the

Establishment of a Zero Emission Certificate Program for Eligible

Nuclear Power Plants

BPU Docket No. EO 18080899

In

the Matter of the Application of Atlantic City Electric Company for Approval

to hnplement a Zero Emission Certificate ("ZEC") Charge and Tariff Page(s)

Related Thereto in Support of the ZEC Program Authorized by N.J.S.A. 48:3-87.3

et seq. and a Board Order Initiating the ZEC Program, Dated August 29, 2018

BPU Docket No. EO18091003

Dear Secretary Camacho-Welch:

The undersigned is Assistant General Counsel to Atlantic City Electric Company (the

"Company").

By way of follow up to, and in compliance with, the Board’s November 19, 2018 Order

Approving A Zero Emission Certificate Recovery Charge Tariff, attached are an original and ten

(I0) copies of a revised, proposed Tariff Sheet in connection with the above referenced matter(s).

The Company acknowledges that "[t]he tariff is not to be implelnented unless and until

the Board issues a final order authorizing the Company to implement the ZEC program."

Kindly return one date and time-stamped "Filed" copy of this communication and

attachment in the enclosed self-addressed, postage-prepaid envelope.

(2)

Aida Camacho-Welch

December 5,2018

Page 2

Thank you for your cooperation and courtesies.

questions.

Feel free to contact me with any

EncIosure

(3)

Propo

ed

(4)

ATLANTIC CITY ELECTRIC COMPANY

BPU NJ No. 11 Electric Service - Section IV Original Sheet No. 67 ZERO EMISSION CERTIFICATE ("ZEC")

RECOVERY CHARGE

APPLICABILITY: The Zero Emission Certificate Recovery Charge ("Rider ZEC" or "ZEC Charge") provides a charge for the recovery of costs associated with the Zero Emission Certificate Program directed by the Board of Public Utilities ("BPU" or"Board") as detailed below. The ZEC Charge is applicable to all kWh usage of any Full Service Customer or Delivery Service Customer.

Rate Component (¢ per kWh)

ZEC Charge

ZEC Reconciliation Charge Total ZEC Charge

Excluding SUT Including SUT

0.4000 0.4265

0.0000 0.0000

0.4000 0,4265

Pursuant to the BPU’s Zero Emission Certificate Charge Order dated November 19, 2018 in BPU Docket No. EO18091003, the Board approved the implementation of a non-bypassable, irrevocable ZEC Charge of $0.004000 per kWh for all customers. The ZEC Charge reflects the emission

avoidance benefits of the continued operation of selected nuclear plants as determined in L~ 2018, c~ 16 (the "ZEC Law"). The ZEC Charge has been set at the rate specified in the ZEC Law and may be adjusted periodically by the Board, in accordance with the methodology provided for in the ZEC Law. In accordance with the ZEC Law, the proceeds of the ZEC Charge will be placed in a separate, interest-bearing account and will be used solely to purchase ZECs and to reimburse the Board for its reasonable, verifiable costs incurred to implement the ZEC program. Refunds will be provided to the customers served under each of the Company’s rate schedules in proportion to the ZEC Charge revenues contributed by the rate schedule.

The ZEC Charge will become effective upon the issuance of the April 2019 Board Order in BPU Docket No. EO18080899.

Date of Issue: Effective Date: Issued by:

(5)

In the Matter of the Implementation of_L. 2018, _c. 16 Regarding the Establishment of a Zero Emission Certificate Program for Eligible Nuclear Power Plants Order Initiating the Zero Emission Certificate Program, Designating

Commissioner, Setting Manager of Service BPU Docket No. EO18080899

In the Matter of the Application of Atlantic City Electric Company for Approval to hnplement a Zero Emission Certificate ("ZEC") Charge and TariffPage(s) Related Thereto in Support of the ZEC

Program Authorized by N.J.S.A. 48:3-87.3 et seq. and a Board Order Initiating the ZEC Program, Dated August 29, 2018 BPU Docket No. EO 18091003

Service List

BP____V.~

Aida Camacho-Welch Secretary of the Board Board of Public Utilities

44 South Clinton Avenue, Suite 314 P.O. Box 350 Trenton, NJ 08625-0350 [email protected] ..,2o v [email protected] Paul Flanagan Executive Director [email protected] Benjamin Witherell Chief Economist [email protected]~ov Noreen M. Giblin, Esquire Chief Counsel

noreen.~iblin@bpt,.ni.~ov Grace Strom Power, Esquire Chief of Staff

[email protected] Thomas Walker

Director State Energy Services thomas.walker~bpu.ni.gov Stacy Peterson

Director, Division of Energy [email protected]

DIVISION OF LAW

Caroline Vachier, Esquire Deputy Attorney General Division of Law

124 Halsey Street P.O. Box 45029

Newark, NJ 07101-45029 caroline.vachier~law.nioa,a.gov Joseph Snow, Esqnire

Assistant Attorney General [email protected] Geoffrey Oersten, Esquire Deputy Attorney General ~eo ffrev.,[email protected] ioa e,.e, ov Alex Moreau, Esqtfire

Deputy Attorney Geueral

alex.moreau(fi~law.nioag.gov

Carolyn Mclntosh, Esquire Deputy Attorney General carolvn.mcintoshC~law.nioag.gov

RATE COUNSEL

Stefanie A. Brand, Esquire Director

Division of Rate Counsel 140 East Front Street, 4~h Floor P.O. Box 003

Trenton, NJ 08625-0003 [email protected].~,ov

AC.___.~.~

Philip J. Passanante, Esquire Assistant General Counsel Atlantic City Electric Company 92DC42 500 N. Wakefield Drive P.O. Box 6066 Newark, DE 19714-6066 philip.passanante’a’pepcoholdinas.com PSE&G Joseph F. Accardo, Jr. Deputy General Counsel Public Service Electric & Gas 80 Park Plaza, T5G

P.O. Box 570

Newark, NJ 07102-4194 ioseph.accardoir@pse~z.com Matthew M. Weissman, Esquire Associate General Counsel matthew.weissman~pseg.com Michele Falcao

Regulatory Case Coordinator michele, falcao@pse,.z,.com Hesser G. McBride, Jr., Esquire Associate General Regulatory Counsel hesser.mcbride(~,’psee, co n Michael McFadden [email protected] co n Kevin Nedza Legislative Liaison [email protected]

Bethany Rocque-Romaine, Esquire Deputy Chief Counsel

bethanv.romaine,@bpu.ni.,2ov Stacy Ho Richardson, Esquire Counsel’s Office

stac,[email protected]

Brian O. Lipman, Esquire Deputy Public Advocate [email protected].~ov Ami Morita, Esquire Deputy Public Advocate [email protected]~ov

Felicia Thomas-Friel, Esquire Deputy Public Advocate

fihomas~rpa.ni.~ov Lisa Gurkas [email protected].~,ov Bernard Smalls bernard.smalls@pse~.com Stephen Swetz [email protected] Caitlyn White [email protected] Martin C. Rothfelder, Esquire Rothfelder Stern, LLC

407 Greenwood Avenue, Suite 301 Trenton, NJ 08609-2158

(6)

ROCKLAND ELECTRIC

Margaret Comes Esquire Rockland Electric Company Law Department, Room 1815-S 4 Irving Place New York, NY 10003 comesm~coned.com William A. Atzl, Jr. [email protected] Cheryl M. Ruggiero rugu, ieroc@coned corn JCP&L.

Mark A. Mader

Jersey Central Power & Light 300 Madison Avenue P.O. Box 1911 Morristown, NJ 07962

mamader@fi rsteneru, vcorp.com Thomas R. Donadio

tdonadioc?~fi rstener~vcorp.com Sally J. Cheong

sc heon u,@ fi rste ner.,.zvcorl~.COm Gregory Eisenstark, Esquire Windels Marx

120 Albany Street Plaza, 6th Floor New Brunswick, NJ 08901

,.zeisenstark~windelsmarx.com

BUTLER POWER & LIGHT

Robert H. Oostdyk, Jr., Esquire Murphy McKeon, PC

51 Route, 23 South P.O. Box 70 Riverdale, NJ 07457

References

Related documents