Independent Test and Evaluation
ProPath
Table of Contents
Independent Test and Evaluation Process Maps ... 1
Process: Independent Test and Evaluation ... 3
Independent Test and Evaluation Description and Goals ... 4
Description... 4
Goals... 4
Independent Test and Evaluation RACI Information ... 5
Independent Test and Evaluation Process ... 8
Process Activity Name: ITE-1 Review Testing Intake Assessment Results ... 8
Process Activity Name: ITE-1-DEC01 Independent Testing Required? ... 9
Process Activity Name: ITE-2 Conduct Enterprise Systems Engineering Testing Meeting ... 9
Process Activity Name: ITE-3 Perform Enterprise Systems Engineering Testing ... 10
Process Activity Name: ITE-4 Perform SQAS Systems Integration Testing .. 11
Process Activity Name: ITE-5 Perform Operational Readiness Review ... 13
Process Activity Name: ITE-5.1 Review ESE ERF Results ... 14
Process Activity Name: ITE-5.1-DEC01 ORR Required? ... 15
Process Activity Name: ITE-5.2 Create ESE Testing Checklist ... 15
Process Activity Name: ITE-5.3 Submit/Resubmit ORR ... 16
Process Activity Name: ITE-5.4 Execute ORR Acceptance Review ... 17
Process Activity Name: ITE-5.4-DEC01 Execute ORR? ... 18
Process Activity Name: ITE-5.5 Address ORR Acceptance Issues/Questions ... 19
Process Activity Name: ITE-5.6 Execute ORR ... 20
Process Activity Name: ITE-5.6-DEC01 Open Source Related? ... 21
Independent Test and Evaluation Process Maps
Pr oj ec t M an ag er En ter pr is e S ys tem s Eng ine er ing C ap ac ity P lan ni ng and E ng ine er ing O pe rat io nal Rea di nes s R ev iew A na lys t En ter pr is e S ys tem s Eng ine er ing Te st A na ly st Sy st em s Q ua lit y A ss ura nc e S erv ic e Ind ep end ent V er ific at io n a nd V al id at io n M an ag erIndependent Test and Evaluation
ITE-3 Perform Enterprise Systems Engineering Testing ITE-4 Perform SQAS Systems Integration Testing ITE-2 Conduct Enterprise Systems Engineering Testing Meeting Independent Testing Required? No ITE-6 Provide to Open Source ITE-1 Review Testing Intake Assessment Results Yes
home overview raci help
ITE-5 Perform Operational Readiness Review Open Source Related? No Yes
Pr oj ec t M an ag er Ent er pr is e S ys te m s E ng ine er ing C ap ac ity P la nni ng a nd E ng ine er ing O pe ra tio na l R ea din es s R ev ie w A na ly st
Independent Test and Evaluation: ITE-5 Perform Operational Readiness Review
ORR Required?
ITE-5.1 Review ESE ERF Results
home overview raci help
ITE-5.2 Create ESE Testing Checklist ITE-5.3 Submit/Resubmit for ORR No Yes ITE-5.4 Execute ORR Acceptance Review ITE-5.5 Address ORR Acceptance Issues/Questions ITE-5.6 Execute ORR Execute ORR? Rejected Accepted Issues/Questions process
Process: Independent Test and Evaluation
Overview: The process map for Independent Test and Evaluation cycles through the following process and review activities:
ITE-1 Review Testing Intake Assessment Results ITE-1-DEC01 Independent Testing Required?
ITE-2 Conduct Enterprise Systems Engineering Testing Meeting ITE-3 Perform Enterprise Systems Engineering Testing
ITE-4 Perform SQAS Systems Integration Testing ITE-5 Perform Operational Readiness Review ITE-5.1 Review ESE ERF Results
ITE-5.1-DEC01 ORR Required? ITE-5.2 Create ESE Testing Checklist ITE-5.3 Submit/Resubmit ORR
ITE-5.4 Execute ORR Acceptance Review ITE-5.4-DEC01 Execute ORR?
ITE-5.5 Address ORR Acceptance Issues/Questions ITE-5.6 Execute ORR
ITE-5.6-DEC01 Open Source Related? ITE-6 Provide to Open Source
Independent Test and Evaluation Description and Goals
Description
Enterprise Testing Service (ETS), an organization within Enterprise Systems Engineering (ESE), works hand-in-hand with Product Development (PD) to provide an independent evaluation of development artifacts and product software. Both Systems Quality Assurance Service (SQAS) and ETS are two forms of evaluations that are not mutually exclusive. The type of evaluation required is dependent upon the results of risk-based analysis. The evaluations help the Office of Information and Technology (OI&T) management minimize risk of schedule delays, cost overrun, poor quality, and software failure.
ETS provides:
- Test environments on which software products can be tested - Independent evaluations of project artifacts and project software Services falling under the category of Test Environments include: - New test database in the ETS Test Center (ETSTC)
- Miscellaneous issue for help with an ETSTC testing environment problem - Database refresh
- Database backup/restore
- User access request to add/reset/modify/deactivate user access to an existing ETSTC environment
Test environment services are requested with an ETSTC Service Request. Services falling under the category of Independent Evaluations include: - Work product reviews of project artifacts
- Test observation and validation of the operation and use of the software product - Various types of testing including legacy Patient Safety Issue (PSI) testing, risk-based independent testing, performance testing, and system integration testing
Goals
- Mitigate risk and provide feedback throughout the lifecycle
- Ensure that products meet acceptable quality levels before promotion - Provide feedback for continuous improvement for process improvement
- Continuously improve the likelihood that a quality product which meets user requirements is deployed on time and on budget
- Ensure consistency in the testing methodologies and practices during Agile development - Validate that products are technically ready for incorporation into the VA infrastructure
Independent Test and Evaluation RACI Information
The following describes the RACI information for this process:
ITE-1 Review Testing Intake Assessment Results
Responsible Role: Project Manager
Accountable Role: Director, Project Management Division
ITE-1-DEC01 Independent Testing Required?
Responsible Role: Project Manager
Accountable Role: Director, Project Management Division
ITE-2 Conduct Enterprise Systems Engineering Testing Meeting
Responsible Role: Project Manager
Accountable Role: Director, Project Management Division
ITE-3 Perform Enterprise Systems Engineering Testing
Responsible Role: Enterprise Systems Engineering Test Analyst Accountable Role: Director, Project Management Division
ITE-4 Perform SQAS Systems Integration Testing
Responsible Role: Systems Quality Assurance Service Independent Verification and Validation Manager
Accountable Role: Associate Director, Software Quality Assurance Service
ITE-5.1 Review ESE ERF Results
Responsible Role: Enterprise Systems Engineering Capacity Planning and Engineering Operational Readiness Review Analyst
Accountable Role: Director, Enterprise Systems Engineering Capacity Planning and Engineering Informed Role: Project Manager
ITE-5.1-DEC01 ORR Required?
Responsible Role: Enterprise Systems Engineering Capacity Planning and Engineering Operational Readiness Review Analyst
Accountable Role: Director, Enterprise Systems Engineering Capacity Planning and Engineering
ITE-5.2 Create ESE Testing Checklist
Responsible Role: Enterprise Systems Engineering Capacity Planning and Engineering Operational Readiness Review Analyst
Accountable Role: Director, Enterprise Systems Engineering Capacity Planning and Engineering Informed Role: Integrated Project Team, Project Manager
ITE-5.3 Submit/Resubmit ORR
Responsible Role: Project Manager
Accountable Role: Director, Project Management Division
ITE-5.4 Execute ORR Acceptance Review
Responsible Role: Enterprise Systems Engineering Capacity Planning and Engineering Operational Readiness Review Analyst
Accountable Role: Director, Enterprise Systems Engineering Capacity Planning and Engineering
ITE-5.4-DEC01 Execute ORR?
Responsible Role: Enterprise Systems Engineering Capacity Planning and Engineering Operational Readiness Review Analyst
Accountable Role: Director, Enterprise Systems Engineering Capacity Planning and Engineering
ITE-5.5 Address ORR Acceptance Issues/Questions
Responsible Role: Project Manager
Informed Role: Enterprise Systems Engineering Capacity Planning and Engineering Operational Readiness Review Analyst
ITE-5.6 Execute ORR
Responsible Role: Enterprise Systems Engineering Capacity Planning and Engineering Operational Readiness Review Analyst
Accountable Role: Director, Enterprise Systems Engineering Capacity Planning and Engineering Informed Role: Project Manager
ITE-5.6-DEC01 Open Source Related?
Responsible Role: Project Manager
Accountable Role: Director, Project Management Division
ITE-6 Provide to Open Source
Responsible Role: Project Manager
Independent Test and Evaluation Process
Process Activity Name: ITE-1 Review Testing Intake Assessment
Results
Previous Process Activity
None
Next Process Activity
ITE-1-DEC01 Independent Testing Required?
Description
The Project Manager reviews all testing intake assessment results, including Risk Analysis and Testing Scope Report (RATSR) or Testing Intake Analysis (TIA) closure email. The Project Manager then incorporates ESE Enterprise Testing Service (ETS) Independent Testing and/or Systems Quality Assurance Service (SQAS) independent testing services into project plans and schedules.
Artifacts Used
ESE Risk Analysis and Testing Scope Report (RATSR) Initial ESE Test Plan
Requirements Specification Document (RSD) System Design Document (SDD)
Artifacts Created
Independent Testing Requirements (None, SQAS Testing, ESE Testing, Both)
Responsible Role
Project Manager
Tools and Websites
Capacity and Performance Engineering SharePoint site Enterprise Testing Service Portal
Standards
None Listed
More Info
ESE ETS and SQAS evaluations are not mutually exclusive and either one or both types of testing may be needed.
Process Activity Name: ITE-1-DEC01 Independent Testing Required?
Previous Process ActivityITE-1 Review Testing Intake Assessment Results
Next Process Activity
If Yes, the following activities are accomplished concurrently: ITE-2 Conduct Enterprise Systems Engineering Testing Meeting ITE-3 Perform Enterprise Systems Engineering Testing
ITE-4 Perform SQAS Systems Integration Testing
If No, the next activity is ITE-4-DEC01 ORR Review Required?
Description
Note: There is a decision dependency that determines the next activity to be performed. If the Project Manager determines independent testing is required, the following activities are accomplished concurrently:
ITE-2 Conduct Enterprise Systems Engineering Testing Meeting ITE-3 Perform Enterprise Systems Engineering Testing
ITE-4 Perform SQAS Systems Integration Testing
If the Project Manager determines no independent testing is required, the next activity is ITE-4-DEC01 ORR Review Required?
Responsible Role
Project Manager
Process Activity Name: ITE-2 Conduct Enterprise Systems
Engineering Testing Meeting
Note: This activity is performed concurrently with: ITE-3 Perform Enterprise Systems Engineering Testing ITE-4 Perform SQAS Integration Testing
Previous Process Activity
ITE-1-DEC01 Independent Test Required
Next Process Activity
Description
The Project Manager conducts a kick off meeting with Enterprise Systems Engineering (ESE) Enterprise Testing Service (ETS) in order to plan and coordinate the delivery of testing services identified for the product in the ESE Risk Analysis and Testing Scope Report (RATSR)
(completed in Project Planning Process). The ESE Testing Checklist for the project is completed prior to the meeting.
Artifacts Used
ESE Risk Analysis and Testing Scope Report (RATSR) Initial ESE Test Plan
Artifacts Created
Artifact Review Agenda and Minutes
Responsible Role
Project Manager
Tools and Websites
Enterprise Testing Service Portal
Standards
Enterprise Testing Service Testing Guide
More Info
None Listed
Process Activity Name: ITE-3 Perform Enterprise Systems
Engineering Testing
Note: This activity is performed concurrently with:
ITE-2 Conduct Enterprise Systems Engineering Testing Meeting ITE-4 Perform SQAS Systems Integration Testing
Previous Process Activity
ITE-1-DEC01 Independent Testing Required?
Next Process Activity
Description
The Enterprise Systems Engineering (ESE) Test Analysts execute Independent Testing. The scope and type of Independent Testing is defined in the Project Risk Assessment and Testing Scope Report (RATSR) completed in the Project Planning Process.
Services include but are not limited to:
- Interoperability/Integration Testing
- Patch Release Testing for Patient Safety Issues - Requirements Validation
- Test Observation and Validation - Performance Testing
Artifacts Used
ESE Risk Analysis and Testing Scope Report (RATSR) ESE Testing Checklist
Project Documents Determined by Type of Test
Artifacts Created
Enterprise Testing Service Analysis Report
Enterprise Testing Service Performance Testing Information Request Final ESE Testing Test Plan
Responsible Role
Enterprise Systems Engineering Test Analyst
Tools and Websites
Enterprise Testing Service Portal
Standards
Enterprise Testing Service Testing Guide
More Info
The Service Delivery and Engineering (SDE) Program Administration Office (PAO) Process Site provides additional information on the SDE PAO including organization charts, Governance Board Charter, and an overview presentation on PAO Services.
Process Activity Name: ITE-4 Perform SQAS Systems Integration
Testing
Note: This activity is performed concurrently with:
ITE-3 Perform Enterprise Systems Engineering Testing
Previous Process Activity
ITE-1-DEC01 Independent Test Required
Next Process Activity
ITE-5.1 Review ESE ERF Results
Description
In accordance with VA Directive 4900, the Systems Quality Assurance Service (SQAS) Independent Verification and Validation (IV&V) Manager ensures the required Systems Integration Testing (SIT) and Quality Assurance Activities are performed on software if it impacts VA financial systems of record or software that interfaces with such a financial system. SIT verifies the accuracy of the delivered software product and determines whether the product built satisfies the customers’ requirements based on functional, system and design specifications. SQAS develops the IV&V Software Quality Assurance Plan (SQAP) and IV&V SIT Plan, requirements-based test plans, test cases and test scripts with a focus on internal controls including general and application controls. Internal controls form the core of the Federal Government’s financial management standards. Test scripts are executed against project software deliverables to verify functionality, including interfaces, and to perform regression testing, or verify correction of defects (“bug fixes”). SQAS issues certification for production implementation and verifies the installation of software configurable items. The delivered software module or release is verified using configurable item attributes.
Artifacts Used
Business Requirements Document Defect Report
Interface Control Document Master Test Plan
Product Build
Product Documentation
Requirements Specification Document Requirements Traceability Matrix Software Design Document Software Quality Assurance Plan System Build
System Design Document System Integration Plan Test Cases/Test Scripts
Test Readiness Review Report Test Summary Report
Artifacts Created
IV&V SIT Defect Report IV&V SQAS Test Report
IV&V Test Scripts SQAS Certification
Software Quality Assurance Plan Updated System Integration Plan Updated
Responsible Role
Systems Quality Assurance Service Independent Verification and Validation Manager
Tools and Websites
IBM Rational Quality Manager IBM Rational RequisitePro IBM Rational ClearCase
Standards
Federal Manager's Financial Integrity Act of 1982
IEEE Standard 829 for Software and System Test Documentation
IEEE Standard 1012 for System and Software Verification and Validation OMB Circular A-123, Management’s Responsibility for Internal Control OMB Circular A-127, Financial Management Systems (revised)
Software Configuration Management Plan Standard
VA Directive 4900, Internal Controls for Financial and Financial Interfacing Automated Information Systems
More Info
The Federal Managers Financial Integrity Act of 1982 requires that VA systems and their
interfaces comply with quality assurance processes that support functional, technical and internal control requirements.
Process Activity Name: ITE-5 Perform Operational Readiness Review
Previous Process ActivityITE
Next Process Activity
None Listed
Description
The process map for ITE-5 Perform Operational Readiness Review cycles through the following dependent activities:
- ITE-5.1 Review ESE ERF Results - ITE-5.1 ORR Required?
- ITE-5.2 Create ORR Checklist - ITE-5.3 Submit/Resubmit for ORR
- ITE-5.4 Execute ORR Acceptance Review - ITE-5.4-DEC01 ORR Rejected?
- ITE-5.4-DEC02 ORR Accepted?
- ITE-5.5 Address ORR Acceptance Issues/Questions - ITE-5.6 Execute ORR
Process Activity Name: ITE-5.1 Review ESE ERF Results
Previous Process ActivityNote: The following activities are performed concurrently: ITE-2 Conduct Enterprise Systems Engineering Testing Meeting ITE-3 Perform Enterprise Systems Engineering Testing
ITE-4 Perform SQAS Systems Integration Testing
Next Process Activity
ITE-5.1-DEC01 ORR Required?
Description
The Enterprise System Engineering Capacity and Performance Engineering (ESE CPE)
Operational Readiness Review (ORR) Analyst analyzes the disposition of the Enterprise Systems Engineering Registration Form – System Characteristics - Project Attributes Form (ERF – SC – PA) to determine if ESE CPE Operational Readiness Review (ORR) is required.
Artifacts Used
ESE Registration Form
Artifacts Created
ESE Capacity Planning and Engineering (CPE) Services ORR Analysis Report
Responsible Role
Enterprise Systems Engineering Capacity Planning and Engineering Operational Readiness Review Analyst
Tools and Websites
Capacity and Performance Engineering Project Reviews Portal Capacity and Performance Engineering SharePoint site
ESE Registration Form Portal
Standards
Enterprise Systems Engineering (ESE) Operational Readiness Review Reference
More Info
Files used for ORR are uploaded as zip files to the ESE ORR Checklist.
Process Activity Name: ITE-5.1-DEC01 ORR Required?
Previous Process ActivityITE-5.1 Review ESE ERF Results
Next Process Activity
If YES, ITE-5.2 Create ESE Testing Checklist OR
If NO, process ends.
Description
The Enterprise Systems Engineering Capacity Planning and
Engineering Operational Readiness Review Analyst determines if ESE CPE Operational Readiness Review (ORR) is required.
Responsible Role
Enterprise Systems Engineering Capacity Planning and Engineering Operational Readiness Review Analyst
Process Activity Name: ITE-5.2 Create ESE Testing Checklist
Previous Process ActivityITE-5.1-DEC01 ORR Required?
Next Process Activity
ITE-5.3 Submit/Resubmit for ORR
Description
The Enterprise Systems Engineering (ESE) Capacity Planning and Engineering (CPE)
Operational Readiness Review (ORR) Analyst creates the ESE Testing Checklist as a template for the project team to complete if ESE CPE ORR is required for the project release.
Artifacts Used
Artifacts Created
ESE Testing Checklist
Responsible Role
Enterprise Systems Engineering Capacity Planning and Engineering Operational Readiness Review Analyst
Tools and Websites
Capacity and Performance Engineering Project Reviews Portal Capacity and Performance Engineering SharePoint site
Enterprise Systems Engineering (ESE) Testing Checklist Repository ESE Registration Form Portal
Standards
Enterprise Systems Engineering (ESE) Operational Readiness Review Reference Enterprise Systems Engineering Testing Intake Assessment Form User Guide
More Info
None Listed
Process Activity Name: ITE-5.3 Submit/Resubmit ORR
Previous Process ActivityITE-5.2 Create ESE Testing Checklist
Next Process Activity
ITE-5.4 Execute ORR Acceptance Review
Description
The Project Manager completes the ESE Testing Checklist and submits for ESE CPE ORR if required for the project release. Once all non-production testing is completed on the build that deploying to Initial Operating Capability (IOC) production or Release (if IOC is not applicable).
If the project team previously submitted for ESE CPE ORR and the ESE CPE ORR was rejected, the project team resubmits for ESE CPE ORR.
Artifacts Used
Artifacts Created
Updated ESE Testing Checklist
Responsible Role
Project Manager
Tools and Websites
Capacity and Performance Engineering Project Reviews Portal Capacity and Performance Engineering SharePoint site
Enterprise Systems Engineering (ESE) ORR Checklist Repository ESE Registration Form Portal
Standards
Enterprise Systems Engineering (ESE) Operational Readiness Review Reference Enterprise Systems Engineering (ESE) Operational Readiness Review Guide
More Info
None Listed
Process Activity Name: ITE-5.4 Execute ORR Acceptance Review
Previous Process ActivityITE-5.3 Submit/Resubmit for ORR
Next Process Activity
ITE-5.4-DEC01 Execute ORR?
Description
The assigned ESE CPE ORR Analyst for the project releases executes an ESE CPE ORR
Acceptance Review. The ESE CPE ORR Analyst analyzes the submitted project release artifacts against the published ESE CPE ORR Acceptance Criteria in order to determine the ESE CPE ORR disposition:
- Rejected: The submitted ESE CPE ORR is grossly deficient (requirements, requirement
traceability, testing results, required items are not provided, etc.). The ESE CPE ORR is rejected and the project team is notified.
- Acceptance Issues: The submitted ESE CPE ORR is not meeting some of the published ESE CPE ORR Acceptance Criteria, but does not qualify as a candidate for rejection. The ESE CPE ORR analyst notifies the project team of the issues and/or questions and the ESE CPE ORR is moved to an acceptance issues status.
- Accepted: The ESE CPE ORR meets all the published ESE CPE ORR Acceptance Criteria. The project team is notified and the ESE CPE ORR is moved to the accepted status.
Artifacts Used
ESE Testing Checklist
Artifacts Created
ESE CPE ORR Acceptance Issues/Questions email ESE CPE ORR Accepted Email
ESE CPE ORR Rejection email, or Updated ESE Testing Checklist
Responsible Role
Enterprise Systems Engineering Capacity Planning and Engineering Operational Readiness Review Analyst
Tools and Websites
Capacity and Performance Engineering Project Reviews Portal Capacity and Performance Engineering SharePoint site
Enterprise Systems Engineering (ESE) ORR Checklist Repository ESE Registration Form Portal
Standards
Enterprise Systems Engineering (ESE) Operational Readiness Review Reference Enterprise Systems Engineering (ESE) Operational Readiness Review Guide
More Info
None Listed
Process Activity Name: ITE-5.4-DEC01 Execute ORR?
Previous Process ActivityITE-5.4 Execute ORR Acceptance Review
Next Process Activity
If Accepted, ITE-5.6 Execute ORR Or
If Rejected, ITE-5.3 Submit/Resubmit for ORR Or
If Issues/Questions, ITE-5.5 Address ORR Acceptance Issues/Questions
Description
The Enterprise Systems Engineering Capacity Planning and Project Manager Engineering Operational Readiness Review Analyst determines if the project is ready for Operational Readiness Review (ORR). There are 3 decisions that can occur:
1. If accepted, the ESE CPE ORR meets all the published ESE CPE ORR Acceptance Criteria. The project team is notified and the ESE CPE ORR is moved to accepted status and the next activity is ITE-5.6 Execute ORR.
2. If rejected, the submitted ESE CPE ORR is grossly deficient in that requirements, requirement traceability, testing results, required items, etc. are not provided. The ESE CPE ORR is rejected and the project team is notified and the next activity is ITE-5.3 Submit/Resubmit for ORR
3. If acceptance issues are found, the submitted ESE CPE ORR is not meeting some of the published ESE CPE ORR Acceptance Criteria, but does not qualify as a candidate for rejection. The ESE CPE ORR analyst notifies the project team of the issues and/or questions, the ESE CPE ORR is moved to an acceptance issues status and the next activity is ITE-5.5 Address ORR Acceptance Issues/Questions.
Responsible Role
Enterprise Systems Engineering Capacity Planning and Engineering Operational Readiness Review Analyst
Process Activity Name: ITE-5.5 Address ORR Acceptance
Issues/Questions
Previous Process Activity
ITE-5.4-DEC01 ORR Decision?
Next Process Activity
ITE-5.4 Execute ORR Acceptance Review
Description
The Project Manager addresses the Enterprise Systems Engineering (ESE) Capacity and Performance Engineering (CPE) Operational Readiness Review (ORR) Acceptance Issues/Questions and responds to the assigned ESE CPE ORR Analyst.
Artifacts Used
Artifacts Created
ESE CPE ORR Acceptance Issues/Questions email response
Responsible Role
Project Manager
Tools and Websites
Capacity and Performance Engineering Project Reviews Portal Capacity and Performance Engineering SharePoint site
Enterprise Systems Engineering (ESE) ORR Checklist Repository ESE Registration Form Portal
Standards
Enterprise Systems Engineering (ESE) Operational Readiness Review Reference Enterprise Systems Engineering (ESE) Operational Readiness Review Guide
More Info
None Listed
Process Activity Name: ITE-5.6 Execute ORR
Previous Process ActivityITE-5.4-DEC01 Execute ORR?
Next Process Activity
Process Ends
Description
The Enterprise System Engineering Capacity and Performance Engineering (ESE CPE) Operational Readiness Review (ORR) Analyst executes the ORR for the accepted project release.
The ORR analyzes and evaluates key technical areas pertinent to ESE, within the context of the service delivery of a high-quality product, especially: requirements definition, design,
traceability, sufficiency of testing, operability (installation and back out), capacity, system resource consumption (including bandwidth), and performance.
Artifacts Used
Artifacts Created
ESE Capacity Planning and Engineering (CPE) Services ORR Analysis Report Updated ESE Testing Checklist
Responsible Role
Enterprise Systems Engineering Capacity Planning and Engineering Operational Readiness Review Analyst
Tools and Websites
Capacity and Performance Engineering Project Reviews Portal Capacity and Performance Engineering SharePoint site
Enterprise Systems Engineering (ESE) ORR Checklist Repository
Standards
Enterprise Systems Engineering (ESE) Operational Readiness Review Reference
More Info
None Listed
Process Activity Name: ITE-5.6-DEC01 Open Source Related?
Previous Process ActivityITE-5.6 Execute ORR
Next Process Activity
If Yes, ITE-6 Provide to Open Source If No, None
Description
Note: There is a decision dependency that determines the next activity to be performed. If open source related, the next activity is ITE-6 Provide to Open Source.
If not open source related, the process ends.
Responsible Role
Project Manager
Process Activity Name: ITE-6 Provide to Open Source
Previous Process ActivityNext Process Activity
None
Description
The Project Manager submits a list of required software code, system builds, and artifacts as described in the Open Source Submission Checklist to OI&T PD Open Source, Configuration & Tools Management Division via the mail group OIT Open Source Software Delivery or
Artifacts Used
Open Source Submission Checklist Product and Project Artifacts Software Code
System Build
Artifacts Created
Updates to Open Source Community
Responsible Role
Project Manager
Tools and Websites
IBM Rational ClearCase
Standards
Open Source Code in Flight Communications Strategy Guide
More Info
The Open Source Submission Checklist lists different artifacts and/or system builds/codes that are to be submitted at certain intervals or milestones to OI&T PD Open Source, Configuration& Tools Management Division, as a product is being built. As project managers are developing their project plans, providing code and artifacts to OI&T PD Open Source, Configuration& Tools Management Division should be considered and incorporated into the plan both based on specific milestones and time intervals basis, as specified in the Open Source Submission
Checklist.