WORKSHOP SCADA NASIONAL
WORKSHOP SCADA NASIONAL
REVIEW SPLN 109: POLA SCADA
REVIEW SPLN 109: POLA SCADA
DAN
DAN
OVERVIEW IEC 870 : TELECONTROL
OVERVIEW IEC 870 : TELECONTROL
Djoko Prasetyo
Djoko Prasetyo
PT PLN (Persero) Penelitian dan Pengembangan
PT PLN (Persero) Penelitian dan Pengembangan
Ketenagalistrikan
SPLN YANG TELAH ADA MENGENAI POLA SCADA
SPLN YANG TELAH ADA MENGENAI POLA SCADA
S SPPLLN N 11009 9 –– 1 1 : : 11999966 BBaaggiiaan n 1 1 : : PPeeddoommaan n DDaassaarr S SPPLLN N 11009 9 -- 2 2 : : 11999966 BBaaggiiaan n 22: : PPeennggaattuur r AAnnttaar r RReeggiioonnaall S SPPLLN N 11009 9 -- 3 3 : : 11999966 BBaaggiiaan n 33: : PPeennggaattuur r WWiillaayyaahh S SPPLLN N 11009 9 -- 4 4 : : 11999966 BBaaggiiaan n 44: : PPeennggaattuur r RReeggiioonnaall S SPPLLN N 11009 9 -- 5 5 : : 11999966 BBaaggiiaan n 55: : PPeennggaattuur r DDiissttrriibbuussii S SPPLLN N 11009 9 -- 6 6 : : 11999966 BBaaggiiaan n 66: : PPeennggaattuur r SSuubb--RReeggiioonnaall
SPLN 109 - 1 : 1996 POLA SCADA - PEDOMAN DASAR
KONVENSI• Definisi: SCADA, Pengatur: Antar-Regional, Wilayah, Regional, Sub-Regional, Distribusi, dsb • Ketentuan Umum: Keharusan mengikuti Standar,
Unsur2 Nama
• Wewenang & Tanggung-jawab Pengatur: Satu2nya organisasi melaksanakan pengaturan, dst
• Syarat Pembentukan Pengatur Antar Regional, Wilayah, Regional, Distribusi, Sub-Regional: dst • Pemberian Nama
• Pemanfaatan & Pengembangan Pengatur • Simbol Warna
PRINSIP OPERASI SISTEM
• Dasar Operasi: Setiap PMT dalam kondisi normal harus posisi ‘remote’, Switching utk manuver
jaringan hanya dilakukan atas perintah dispatcher, dsb
• Tugas2 Pengatur: Antar-Regional, Wilayah, Regional, Sub-Regional, Distribusi
• Hirarki: Antar-Regional Regional Sub-Regional
• Hubungan Kerja: Antar-Regional, Regional, Distribusi
TEKNOLOGI SCADA DAN TELEKOMUNIKASI
• Teleinformasi: telesinyal, telemeter, telekontrol, response time
• Pertukaran data: antar Pengatur
• Komunikasi data dan non-data: antar Pengatur-RTU, voice, telex, dsb
• Struktur Message: event dari peralatan yang muncul di VDU
• Logger
• Dokumentasi • Pengujian
• Sarana & Ketahanan Peralatan: Gedung, Ruang RTU, AC, dsb
• Kompatibilitas: Komputer Pengatur dgn hirarki lebih rendah harus kompatibel dgn komputer Pengatur dg hirarki lebih tinggi, dst
• Protokol komunikasi akan diatur dgn SPLN tersendiri
• Meneliti Kapasitas Peralatan CT, PT dsb yg akan dibebani dgn sirkit SCADA
• Melengkapi Peralatan CT, PT dsb agar dapat digunakan SCADA
SPLN 109 - 2 : 1996 POLA SCADA - PENGATUR ANTAR REGIONAL
KONVENSI• Kode identifikasi • Simbol & Warna
PRINSIP OPERASI SISTEM
• Batas Operasional:
Pengatur Antar Regional berwenang mengatur pembangkit keluar/masuk jaringan dan tingkat
pembebanan, dst
TEKNOLOGI SCADA & TELEKOMUNIKASI • Konfigurasi Peralatan:
− Spek Umum Peralatan EMS
− Ruang Dispatcher: 6 VDU, Mimic Board, etc − Ruang Komputer: 2 Master Computer, etc − Ruang Telkom
• RTU: semua Pusat Kit & GI dipasang RTU • Komunikasi Data:
− Keandalan, cara pengiriman data (hanya jika ada deviasi),
pertukaran data dari/ke Pengatur Regional, dst • Perangkat Lunak SCADA:
− Time, acquisition, database, computer mngment, MMI,
Reporting, Storage, dsb
• Perangkat Lunak Aplikasi Real-time:
− Network topology, State estimation, Contingency Analysis,
Loadflow
• Perangkat Lunak Aplikasi Non-Real-time: Utk Perencanaan dan Analisa Operasi yg dapat mengakses data real-time
• Pengaturan Frekuensi: sinyal dikirim langsung dari pembangkit ke Pengatur Antar Regional
• Pemantauan Frekuensi sewaktu islanding • VDU, Mimic Board
• Teleinformasi: Daftar Informasi Tipikal dari Pembangkit & GI • (>85% SPLN ini berisi daftar teleinformasi dan kode identifikasi
SPLN 109 - 3 : 1996 POLA SCADA - PENGATUR WILAYAH
KONVENSI• Definisi Spesifik:
Jaringan Dis, Gardu Dis • Kode identifikasi
• Simbol & Warna
PRINSIP OPERASI SISTEM
• Pada kondisi normal, PMT TT/TM dalam posisi ‘remote’, dst • Semua manuver jaringan dilaksanakan atas perintah dispatcher, dst • Batas Operasional: Pengatur Wilayah berwenang mengatur pembangkit keluar/masuk jaringan dan tingkat pembebanan, dst
TEKNOLOGI SCADA & TELEKOMUNIKASI • Konfigurasi Peralatan:
− Spek Umum Peralatan EMS
− Ruang Dispatcher Sistem TT: 4 VDU, Mimic Board, etc − Ruang Dispatcher Sistem Dis: 4 VDU, Mimic Board, etc − Ruang Komputer: 2 Master Computer, etc
− Ruang Telkom
• RTU mampu: telesignalling, telemeter, telecontrol, telecounting, load shedding, time tagging, data logging
• RTU: semua Pusat Kit di JTT, GI TT dan GH/Gdis yang diperlukan dipasang RTU
• Komunikasi Data:
− Keandalan, cara pengiriman data (report by exception),
pertukaran data dari/ke Pengatur Regional, dst • Perangkat Lunak SCADA:
− Time, acquisition, database, computer mngment, MMI,
Reporting, Storage, dsb
• Perangkat Lunak Aplikasi Real-time:
− Network topology, State estimation, Contingency Analysis,
Loadflow
• Perangkat Lunak Aplikasi Non-Real-time: Utk Perencanaan dan Analisa Operasi yg dapat mengakses data real-time: Short cct,
hydro-thermal scheduling, forecasting, production cost • Pengaturan Frekuensi: digunakan LFC
• Pemantauan Frekuensi sewaktu islanding • VDU, Mimic Board
SPLN 109 - 4 : 1996 POLA SCADA - PENGATUR REGIONAL
KONVENSI• Kode identifikasi • Simbol & Warna
PRINSIP OPERASI SISTEM
• Batas Operasional:
Pengatur Regional diberi wewenang oleh Pengatur Antar Regional mengatur
pembangkit keluar/masuk jaringan dan tingkat
pembebanan, dst
TEKNOLOGI SCADA & TELEKOMUNIKASI • Konfigurasi Peralatan:
− Spek Umum Peralatan EMS
− Ruang Dispatcher: 6 VDU, Mimic Board, etc − Ruang Komputer: 2 Master Computer, etc − Ruang Telkom
• RTU: prioritas peasangan di semua Pusat Kit di TT, GI yang membentuk looping, GI terhubung radial yg dianggap penting • Komunikasi Data:
− Keandalan, cara pengiriman data (hanya jika ada deviasi),
pertukaran data dari/ke Pengatur Regional, dst • Perangkat Lunak SCADA:
− Time, acquisition, database, computer mngment, MMI,
Reporting, Storage, dsb
• Perangkat Lunak Aplikasi Real-time:
− Network topology, State estimation, Contingency Analysis,
Loadflow
• Perangkat Lunak Aplikasi Non-Real-time: Utk Perencanaan dan Analisa Operasi yg dapat mengakses data real-time
• Pengaturan Frekuensi: sinyal dikirim langsung dari pembangkit ke Pengatur Antar Regional
• Pemantauan Frekuensi sewaktu islanding • VDU, Mimic Board
• Teleinformasi: Daftar Informasi Tipikal dari Pembangkit & GI • (>85% SPLN ini berisi daftar teleinformasi dan kode identifikasi
SPLN 109 - 5 : 1996 POLA SCADA - PENGATUR DISTRIBUSI
TEKNOLOGI SCADA & TELEKOMUNIKASI • Sarana: Ruang kerja, ruang kontrol, dst• Konfigurasi Peralatan:
− Ruang Dispatcher Sistem TT: 2 VDU, Mimic Board, etc − Ruang Komputer: Master Computer, etc
− Ruang Telkom
• RTU mampu: telesignalling, telemeter, telecontrol, telecounting, load shedding, time tagging, data logging
• RTU dipasang di gardu hubung, gardu tengah dis, gardu dis, Keypoint
• Komunikasi Data:
− Secara report by exception
• Perangkat Lunak SCADA:
− Time, acquisition, database, computer mngment, MMI,
Reporting, Storage, dsb
• Pemantauan Frekuensi pada GI-GI yang diperlukan • VDU, Mimic Board
• (>85% SPLN ini berisi daftar teleinformasi dan kode identifikasi KONVENSI
• Definisi Spesifik: Jaringan Dis, Gardu Dis, dst
• Kode identifikasi • Simbol & Warna PRINSIP OPERASI
SISTEM DIS
• Pada kondisi normal, semua feeder
beroperasi radial dan dalam posisi ‘remote’, dst • Semua manuver jaringan dilaksanakan atas perintah dispatcher, dst • Pengaturan tegangan
SPLN 109 - 6 : 1996 POLA SCADA - PENGATUR SUB REGION
TEKNOLOGI SCADA & TELEKOMUNIKASI • Konfigurasi Peralatan:− Spek Umum Peralatan EMS
− Ruang Dispatcher: 6 VDU, Mimic Board, etc − Ruang Komputer: 2 Master Computer, etc − Ruang Telkom
• RTU: prioritas peasangan di semua Pusat Kit di TT, GI yang membentuk looping, GI terhubung radial yg dianggap penting • Komunikasi Data:
− Keandalan, cara pengiriman data (hanya jika ada deviasi),
pertukaran data dari/ke Pengatur Regional, dst • Perangkat Lunak SCADA:
− Time, acquisition, database, computer mngment, MMI,
Reporting, Storage, dsb
• Perangkat Lunak Aplikasi Real-time:
− Network topology, State estimation, Contingency Analysis,
Loadflow
• Perangkat Lunak Aplikasi Non-Real-time: Utk Perencanaan dan Analisa Operasi yg dapat mengakses data real-time
• Pengaturan Frekuensi: sinyal dikirim langsung dari pembangkit ke Pengatur Antar Regional
• Pemantauan Frekuensi sewaktu islanding • VDU, Mimic Board
• Teleinformasi: Daftar Informasi Tipikal dari Pembangkit & GI • (>85% SPLN ini berisi daftar teleinformasi dan kode identifikasi KONVENSI
• Kode identifikasi • Simbol & Warna
PRINSIP OPERASI SISTEM
• Batas Operasional: Pengatur Sub Regional diberi wewenang oleh Pengatur Regional mengatur pembangkit keluar/masuk jaringan dan tingkat
SUBSTANSI SPLN 109:1996
• SPLN 109 pada dasarnya berbicara mengenai tiga hal :1. Kesepakatan/Konvensi : Definisi, Kode Identifikasi, Teleinformasi 2. Operasi Sistem : batas wewenang operasional, dasar SOP, hierarki 3. Teknologi SCADA & Tel : dasar konfigurasi hardware, software sistem
SCADA, dasar teknologi telekomunikasi
• Dari ketiga hal diatas, kesepakatan/konvensi mengenai kode identifikasi dan telesignal/telemeter/telekontrol merupakan porsi terbesar dari content SPLN • Pedoman mengenai teknologi SCADA & Tel justru sangat terbatas dan
dangkal.
• Aplikasi SCADA pada sistem tenaga listrik yang sebetulnya sangat spesifik, yaitu lokasi geografis yang sangat luas, justru tidak di-addressed.
• Terdapat pengulangan/redundansi substansi pada dokumen-dokumen SPLN 109 - 2 s/d 6.
IEC STANDARD MENGENAI SCADA : IEC 60870 (1)
IEC/TR 60870-1-1 (1988-12)
Telecontrol equipment and systems. Part 1: General considerations. Section One: General principles
IEC 60870-1-2 (1989-11)
Part 1: General considerations. Section Two: Guide for specifications
IEC/TR 60870-1-3 (1997-04)
Part 1: General considerations - Section 3: Glossary
IEC/TR 60870-1-4 (1994-07)
Part 1: General considerations - Section 4: Basic aspects of telecontrol data transmission and organization of standards IEC 870-5 and IEC 870-6
IEC/TR 60870-1-5 (2000-09)
Part 1-5: General considerations - Influence of modem transmission procedures with scramblers on the data integrity of transmission systems using the protocol IEC 60870-5
IEC STANDARD MENGENAI SCADA : IEC 60870 (2)
IEC 60870-2-1 (1995-12)
Part 2: Operating conditions - Section 1: Power supply and electromagnetic compatibility
IEC 60870-2-2 (1996-08)
Part 2: Operating conditions - Section 2: Environmental conditions (climatic, mechanical and other non electrical influences)
IEC 60870-3 (1989-05)
Part 3: Interfaces (electrical characteristics) IEC 60870-4 (1990-04)
Part 4: Performance requirements
IEC 60870-5-1 (1990-02)
IEC STANDARD MENGENAI SCADA : IEC 60870 (3)
IEC 60870-5-2 (1992-04)
Part 5: Transmission protocols - Section 2: Link transmission procedures
IEC 60870-5-3 (1992-09)
Part 5: Transmission protocols - Section 3: General structure of application data
Part 5: Transmission protocols - Section 5: Basic application functions IEC 60870-5-5 (1995-06)
Part 5: Transmission protocols - Section 4: Definition and coding of application information elements
IEC STANDARD MENGENAI SCADA : IEC 60870 (4)
IEC 60870-5-101 (2003-02)
Part 5-101: Transmission protocols - Companion standard for basic telecontrol tasks
IEC 60870-5-102 (1996-06)
Part 5: Transmission protocols - Section 102: Companion standard for the transmission of integrated totals in electric power systems
Part 5-103: Transmission protocols - Companion standard for the informative interface of protection equipment
IEC 60870-5-103 (1997-12)
Part 5-103: Transmission protocols - Companion standard for the informative interface of protection equipment
IEC STANDARD MENGENAI SCADA : IEC 60870 (5)
IEC 60870-5-104 (2000-12)Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standard transport profiles
IEC 60870-5-104 (2000-12)
Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standard transport profiles
Part 6: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - Section 2: Use of basic standards (OSI layers 1-4) IEC 60870-6-2 (1995-10)
Part 6: Telecontrol protocols compatible with ISO standards and ITU-T
recommendations - Section 1: Application context and organization of standards IEC/TR 60870-6-1 (1995-05)
IEC STANDARD MENGENAI SCADA : IEC 60870 (6)
IEC 60870-6-501 (1995-12)Part 6: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - Section 501: TASE.1 Service definitions
Part 6-505: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - TASE.2 User guide
IEC/TR 60870-6-505 (2002-08)
Part 6-504: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - TASE.1 User conventions
IEC/TS 60870-6-504 (1998-12)
Part 6-503: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - TASE.2 Services and protocol
IEC 60870-6-503 (2002-04)
Part 6: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - Section 502: TASE.1 Protocol definitions
IEC STANDARD MENGENAI SCADA : IEC 60870 (7)
IEC 60870-6-601 (1994-12)
Part 6: Telecontrol protocol s compatible with ISO standards and ITU-T
recommendations - Sect ion 601: Functional profile for providing the connection-oriented transport service in an end system connected via permanent acc ess to a packet switched data network
IEC/TS 60870-6-602 (2001-04)
Part 6-602: Telecontrol protocols compatible with ISO standards and ITU-T recommendations - TASE transport profiles
IEC 60870-6-701 (1998-08)
Part 6-701: Telecontrol protocols compatible with ISO standards and ITU-T
recommendations - Functional profile for providing the TASE.1 application service in end systems
IEC 60870-6-702 (1998-10)
Part 6-702: Telecontrol protocols compatible with ISO standards and ITU-T
recommendations - Functional profile for providing the TASE.2 application service in end systems
IEC MENGENAI OTOMATISASI DISTRIBUSI : IEC 334 (1)
IEC/TR 61334-1-1 (1995-11)Distribution automation using distribution line carrier systems - Part 1: General considerations - Section 1: Distribution automation system architecture
IEC/TR 61334-1-2 (1997-12)
Part 1-2: General considerations - Guide for specification IEC/TR 61334-1-4 (1995-11)
Part 1: General considerations - Section 4: Identification of data transmission parameters concerning medium and low-voltage distribution mains
IEC 61334-3-1 (1998-11)
Part 3-1: Mains signalling requirements - Frequency bands and output levels
Part 3: Mains signalling requirements - Section 21: MV phase-to-phase isolated capacitive coupling device
IEC MENGENAI OTOMATISASI DISTRIBUSI : IEC 334 (2)
IEC 61334-3-22 (2001-01)Part 3-22: Mains signalling requirements - MV phase-to-earth and screen-to-earth intrusive coupling devices
IEC 61334-4-1 (1996-07)
Part 4: Data communication protocols - Section 1: Reference model of the communication system
IEC 61334-4-32 (1996-09)
Part 4: Data communication protocols - Section 32: Data link layer - Logical link control (LLC)
Part 4: Data communication protocols Section 41: Application protocol -Distribution line message specification
IEC 61334-4-41 (1996-08)
Part 4-33: Data communication protocols - Data link layer - Connection oriented protocol
IEC MENGENAI OTOMATISASI DISTRIBUSI : IEC 334 (3)
IEC 61334-4-42 (1996-10)
Part 4: Data communication protocols Section 42: Application protocols - Application layer
IEC 61334-4-61 (1998-07)
Part 4-61: Data communication protocols - Network layer - Connectionless protocol
Part 4-512: Data communication protocols - System management using profile 61334-5-1 - Management Information Base (MIB)
IEC 61334-4-512 (2001-10)
Part 4-511: Data communication protocols - Systems management - CIASE protocol
IEC MENGENAI OTOMATISASI DISTRIBUSI : IEC 334 (4)
IEC 61334-5-1 (2001-05)Part 5-1: Lower layer profiles - The spread frequency shift keying (S-FSK) profile IEC/TS 61334-5-2 (1998-05)
Part 5-2: Lower layer profiles - Frequency shift keying (FSK) profile
Part 6: A-XDR encoding rule IEC 61334-6 (2000-06)
Part 5-5: Lower layer profiles - Spread spectrum - fast frequency hopping (SS-FFH) profile
IEC/TS 61334-5-5 (2001-09)
Part 5-4: Lower layer profiles - Multi-carrier modulation (MCM) profile IEC/TS 61334-5-4 (2001-06)
Part 5-3: Lower-layer profiles - Spread spectrum adaptive wideband (SS-AW) profile IEC/TS 61334-5-3 (2001-01)
PLUS – MINUS SPLN 109: 1996 POLA SCADA
+ Memberikan pedoman dasar mengenai Prinsip & Batas Kewenangan Operasi Sistem / Sistem Distribusi
+ Memberikan pedoman dasar mengenai Teknologi dan Pola SCADA,
+ Memberikan pedoman dasar mengenai Konvensi dan Definisi dalam Pola SCADA
+ Memberikan rincian informasi tipikal mengenai teleinformasi dari berbagai instalasi (pembangkit, gardu induk, gardu dis, dst)
+ Memberikan detail Kode Identifikasi
− Hanya mencakup bagian yang sangat terbatas dalam dunia SCADA (bandingkan SPLN
ini dengan IEC 870 dan IEC 334)
− Terlalu dangkal dan tidak cukup detail untuk dapat menjadi pedoman implementasi
SCADA yang diinginkan
− Tidak mencakup banyak hal yang sangat crucial, terutama mengenai standardisasi
protokol dan kompatibilitas (IEC mempunyai 27 standard hanya mengenai protokol, SPLN : nil)
ADA PERMASALAHAN DLM IMPLEMENTASI SCADA DI PLN ?
MASTER STATION :• Front end, server dan operator station bersatu pada satu komputer, fungsi telecontrol tidak berjalan dengan baik (Kaltim, Kalsel).
• Front end, server dan operator station sudah lengkap dan terpisah (Palembang, Padang).
• Terpasang tahun 1985, part sulit diperoleh (Medan). • Komponen utama lengkap, juga ada fungsi EMS (Sulsel) • Belum sesuai dengan standar pola SCADA (Manado).
TELEKOMUNIKASI : mengandalkan PLC dan radio, dengan protokol yang tidak standar dan proprietary.
RTU : Tidak lengkap pada semua GI / Pusat Pembangkit, berbagai merk & type PERALATAN GI : masih ada peralatan GI yang belum motorized, dsb
EMS : Tidak berfungsi
REKOMENDASI
• Dengan tidak berfungsinya secara penuh sistem SCADA selama bertahun-tahun di banyak implementasi SCADA di PLN (not to mention EMS), PLN perlu
mendefinisikan visi, kebijakan dan strategi pengembangan/implementasi SCADA untuk pengoperasian sistem tenaga listrik.
• Untuk meningkatkan tingkat sukses PLN dalam implementasi SCADA, diperlukan adanya suatu basic design sistem SCADA sebagai pedoman unit-unit PLN.
• Mengingat sebuah Control Centre berkembang selaras dengan perkembangan power systemnya, dirasa perlu untuk mengidentifikasi standar spesifikasi sistem SCADA untuk setiap tahap perkembangannya.
• Protokol komunikasi : selalu menjadi permasalahan dalam integrasi komponen SCADA. Standardisasi dan sertifikasi kompatibilitas komponen-komponen SCADA menjadi sangat urgen.
• SPLN 109:1996 telah terbukti belum dapat sepenuhnya menawarkan pedoman yang baik untuk pengembangan SCADA di PLN. Revisi atau penulisan-ulang menjadi urgen. PLN Litbang siap mengkoordinasikan hal ini di lingkungan PLN. • Standar yang mengatur protokol komunikasi sangat diperlukan (IEC 870-5 dan
870-6).
• RSNI 57.1, 57.2, 57.3 (dst) yang telah mengadopsi IEC 870 dapat menjadi referensi PLN dalam pengembangan sistem SCADA.