Where do we maintain "Item Category Usage" at the master level?

SPRO --> Sales and Distribution --> Sales --> Sales Documents --> Sales Document Item --> Define Item Category Usage

Item Category Usage: item category usages which control the usage of an item. Item category usage controls, for example, the system response if during document processing an item does not refer to a material but to a text item. Item category usage can also be maintained via the item categories

In contracts we are creating quantity contract and value contracts in that we only put the validity period after validity period that contract will close, but customer want before one month closing the period system should alert with popup box like this contract is going to close, for this sales manager can follow up the customer for renual the contract.

Getting a pop-up when the Contract is going to expire is not a Standard SAP thing. For this you need to do some programming. Instead of this the Std system has a reminder system where in the open Contracts and Quotations are popped up when you about to create a sales order.

This setting is in the Sales order header,

Go to -- VOV8 --- Quotation and Outline agreement messages

If you want to have different number range for different sales area where the settings to be done.

Number Ranges are use to define what number to be assign to sales document type. Number range can be assign Internal or external.

In internal number range system automatically assigns a number to sales document according to number range define in system.

In External number range user manually assigns number to sales document. For Assigning Number Range use T-Code VN01

Choose Intervals ---- Define your number range

(2)

How to configure tax? Use the following Tcodes:

OBQ1 --- CONDITION TABLE OBQ2 --- ACCESS

OBQ3 --- TAX PROCEDURE CAL

OBBG --- ASSIGN COUNTRY TO TAX PROC OVK3 --- CUSTOMER TAX CATEGORY OVK4 --- MATERIAL TAX CATEGORY OVK1 --- TAX DETERMINATION RULES OVK6 --- ASSIGN DELIVERY PLANTS

and thenVK11 to maintain the condition record for the tax rate.

I raise a sales order and is getting a error stating that "sales area is not defined". 1) At SPRO-->SD-->Sales header-->Assign Sales area to Sales document - Combine your Sales Organisations, Distribution Channels & Divisons

2) At VOPA-->Assign Partner Determination procedure to your Account Group of Customer Master you are using.

3) At VOPA--> Assign Partner Functions to your Account Group & Partner Determination procedure

Steps to create a Vendor Master Data at the client level and how do we extend it to different company codes?

Follow the following steps:

1. Create a vendor account group OBD3

2. Define no. range for vendor account group XKN1 3. Assign number range to Vendor account group OBAS 4. Define tolerance Group for vendor OBA3

5. Create 2 GL accounts FS00 a) Purchases A/c

b) S. creditors A/c

6. Create Vendor master data XK01

7. change/block vendor master data XK02/XK05 8. Define document type and no. range OBA7 a) KA

b) KG c) KR

d) KZ *-- Vandna

How to find the strategy group in sap sd? Menu path for Strategy Group is:

(3)

Spro --> Production --> Production Planning --> Demand Management --> Planned Independent Requirements --> Planning Strategy --> Define Strategy Group. OPPT -- Maintain Starategy Group

We can see Strategy Group in Material Master Record - MRP 3 - Planning -- Strategy Group. 10 - For Make to Order

20 - For Make to Stock

SAP Sales and Distribution Frequently Asked Question

Master Data

Q: Some materials have been blocked for procurement and production. Even though deletion flag is set for a material/plant level, the order can be still entered ( with a warning message). Is there a way to block such transactions for a material flagged for deletion?

A: Sales Status field in the sales organization view of the material master may be used to block any transaction for the material.

Q: We can define our own exchange rate types and use them instead of the defaulted types, 'M', 'B' and 'G'. How can we overwrite default types in SD?

A: Exchange rate gets copied from the customer master record. Exchange rate types are to be maintained for the customer in the sales screen of the customer master record.

Shipping

Q: The PL00 condition is fine in delivery. But when we try to print to the screen or printer, an error V1032 occurs. Why?

A: In order to use the Packing list PL00 (packing slip in delivery) you must do 'Packing' in the delivery note (edit->packing)

Q: we have to enter a shipping point while creating a delivery. Is it possible to create delivery without shipping points?

A: When you are releasing a sales order, choose Sales document -> Subsequent functions-> Create delivery, then the shipping point will be brought in from the sales order. In all other scenarios you have to key in the shipping point. The above described scenario will only work if all items on the sales order are to be shipped from the same shipping point.

(4)

Q: SAP allows a non-inventory item and an inventory item to be in the same document till delivery but splits at the time of creation of billing document. Can we combine a

non-inventory item with an non-inventory item in one invoice? Can we treat it as a value item in sales order so that it is priced and then make it as a text item in delivery documents so that it appears in the same invoice and does not split?

A1: Make the non-stock material deliverable, but not pickable. Both items will carry into the delivery, and therefore appear on the same invoice.

A2: Change the copy rule for orders->invoices and deliveries->invoices to specify that invoice combination is permitted. However note that for system to create combined invoices, PO number, payment terms, sales organization, and distribution channel must be identical. Else undesirable combinations may be created by the system.

Pricing Conditions

Q:

It is impossible to price at the material level (matnr) , when a material has a pricing reference (mvke-pmatn) set up against it in the master data. Pricing always look for the pref, even if a price is set up against the material and not the pref. How can we price by material and pref?

A: The field used to look up at the price is defined in Access sequence. You may find a step with PMATN as material number. If you insert a step with MATNR then the system will first look for the material, if not found (use the exclusion tick box) it will look for the pref.

Customizing

Q: We generated a new condition table. Assigned the condition to access sequence. Created a condition record. Access sequence is assigned to the output type. But when we create a billing document, output screen comes up blank for the output type. When we look up Determination Analysis, we get an error "Note 524 Access not made (Initialized Field)". What else is required to be done?

A: Assign output determination procedure to the header of the document and the output type. Q: How can we set up to have the VAT# be accepted in the Ship-To Master File Data

Control screen?

A: IMG->Fin. Acct.->AR and AP ->Customer acct->Master Record -> Prepare to Create Customer-> Define Acct. Group.

Q: We want to explode Bill of Material automatically at time of Order entry and explode an Equipment BOM in the sales order. What are the setting required?

A: Use an item category that is configured for bills of material for having a sales BOM to explode automatically.

Standard SAP item categories are :

(5)

TAP - Pricing and inventory control take place at the BOM item level

These can be automatically derived using the item category groups ERLA and LUMF, respectively.

Q: How can we make the Customer Group 1 (or 2, 3, 4, 5) a mandatory field?

A: Logistic General-> Logistics Basic Data: Business Partners -> Customers -> Control -> Define account groups and field selection for customer

Choose Customer Acct. GR. (double-click). -> Field Status: Sales data (double click) -> sales (double click) .Check the radio button against Customer Gr as REQ. ENTRY. Save the settings to make customer GR entry mandatory .

Q: Is there an user exit to copy the data into planning table? A: Use user exit MCP20001 and include ZXSOPU01.

Others

Q:

We get a report screen: "Goods issue: Problem Log" during the delivery process when activating Post Goods Issue button. We want to include our own error message to this list if the selected batch is not on a customer defined table. What is the best way?

A: Try User exit - USEREXIT_SAVE_DOCUMENT_PREPARE

Link between SAP SD, MM & FI

1. In SAP you will always get integration with other modules. SD will interact with FI, MM will interact with SD :-

1a. Looking at MM and SD interaction first, take the scenario of a third party order process. This process uses a purchase order (which is sent to your vendor). Also invoice verification is used further along the process to check that the invoice you send to your customer is the same material and quantity as that which the vendor sends to you (but obviously shipped

directly to your customer).

1b. Billing is an SD function. But SAP needs to know, when processing a customer's payment, to which GL account the payment has to be processed. For instance payment of a UK based material would be placed in a different GL account to that of a non-UK based material. Furthermore, a UK based customer may have a different GL account to that of an Export customer. This is configured in Account Determination.

2. ABAPers are there to essential do some bespoke development. Your integration, or interaction, with them would be when specifying the tables, fields, input fields, a simple process explanation, data mapping (if doing an interface from one system to another) etc. *-- Shahee

(6)

1. When you create sales order in SD, all the details of the items are copied from Material master of MM.

2. MRP and availibility check related data is also taken from MM although you control this data in SD also.

3. While you create inbound/outbound delivery with reference to a sales order,the shipping point determination takes place with the help of the loading group, plant data, shipping conditions etc. This also refers to Material Master.

4. The material which you are entering in a sales order must be extended to the sales area of your sales order/customer otherwise you cannot transact with this material.

There are many such links between SD and MM. Now the link between SD and FI :-

1. Whenever you create a delivery with reference to a sales order, goods movement takes place in the bacgground. eg. In case of standard sales order, you create an outbound goods delivery to the customer.

Here movement 601 takes place. This movement is configured in MM. Also, this movement hits some G/L account in FI. Every such movement of good s hits some G/L account. 2. The accounts posting in FI is done with reference to the billing documents (invoice, debit note, credit note etc) created in SD. Thus this is a link between SD and FI

3. Tax determination: In case of a tax determination also, there is a direct link between SD and MM

SD Integration points with other modules

SD module is highly integrated with the other modules in SAP.

Sales Order –

Integration Points Module •Availability Check - MM •Credit Check - FI •Costing - CO/ MM •Tax Determination - FI •Transfer of Requirements - PP/ MM Delivery & Goods Issue –

Integration Points Module •Availability Check - MM •Credit Check - FI •Reduces stock - MM •Reduces Inventory $ - FI/ CO •Requirement Eliminated - PP/ MM Billing -

Integration Points Module •Debit A/R - FI/ CO •Credit Revenue - FI/ CO •Updates G/ L - FI/ CO

(7)

(Tax, discounts, surcharges, etc.)

•Milestone Billing - PS Return Delivery & Credit Memo -

Integration Points Module •Increases Inventory - MM •Updates G/ L - FI •Credit Memo - FI •Adjustment to A/R - FI •Reduces Revenue - FI

Tips by: Subha

SD Transaction Code Flow:

Inquiry / Document type IN

Tcode for creation VA11,VA12,VA13. tables VBAK,VBAP Quotation / QT

Tcode for creation VA21,VA22,VA23. tables VBAK,VBAP Purchase Order PO

Tcode for creation ME21,ME22,ME23. tables EKKO,EKPO. Sales Order OR

Tcode for creation VA01,VA02,VA03. tables VBAK,VBAP Delivery LF

Tcode for creation VL01,VL02,VL03. tables LIKP,LIPS Billing MN

Tcode for creation VF01,VF02,VF03. tables VBRK,VBRP

To create a sales order we need purchase order number and custmer number. Before that, to create a purchase order we need to have material no, vendor no.

To create vendor tcode is

xk01(create), xk02(change) , xk03(display) Tables are lfa1.

To create custmer tcode is xd01, xd02, xd03. Table is kna1.

After creating sales order using this no we can create delivery note tcode is vl01.

Why Do We Assign Division to Sales Organisation

In SAP, why do we assign division to Sales organisation not to distribution channel? In SAP Business Process

(8)

Sales Area= Sales Org.+Dist.Channel+Division.

Its Triangular intraction Sales organization / \ / \ Dist.Channel<--->Division

Sales Org controls Distribution Channel and Division

Distribution Channel: The channel that is chosen the organization to make their product reach the end customer.(Network)

Division: Ex: HLL---> Detergents, Out of Home,Food Products,Health Care Sectors/Departments

TATA Motars: Trucks/Bus,Cars,Heavy Vechiles Etc...

Please note it is not: Sales organization | | Dist.Channel | | Division

Division is an Oragaizational Unit.

The Division in the Material Master is not an Organizational Unit that can be used to

maintain related fields. It is a field which is used to uniquely assign a material to a Division.

How To Do Master Record Mass Maintenance

Which master records mass maintenance can be done?

What do you mean by mass maintenance? Mass maintainance in MM-

1. Mass Maintainance means to change a master data or transactional data in mass 2. SAP has provided Mass Maintainance for many objects

Examples:Material masters, BOMs, Routings, Workcenters in PP In MM --> Inforecords, PO,s Preqs etc

(9)

You can use tcode MASS and then select your Object type or there is few specific mass maint. Tcode is available like for PO = MEMASSPO etc. but you can use MASS also for that you need to select the object type for PO

Tips for mass modification:

Use object type BUS1001 and generate. Then you have to know the tables where the field you want to modify is. Pick the fields in their folder and generate again. Then in selection pick the materials or use other selection criteria. Generate again.

In the upper side of the screen insert the data and click the button 'carry out a mass change'. Save and leave.

Master records mass maintenance can be done: Material master, info record, vendor, PO, PR, etc. What do you mean by mass maintenance?

MASS maintenance means - suppose you want to change prticaulr field of material for all the mateirl of certian plant or all the plant you can do using mass like wise for certian PO value if you want to cahnge you can use mass.

There a lot of transactions for specific mass changes. MASS is also one of the transactions among them.

- Mass Change in material master. MM17 - Mass change in BOM. CS20

- Mass change in work center. CA85 - Mass change in Reference opn set. CA95 - Mass change in PRT. CA75

- SU10 Mass changes to User Master.

- SU12 Mass Changes to User Master Records. - CO44 Mass processing of orders.

- F.80 Mass reversal of documents. - FOFO Mass release.

- FOVX Mass processing of offers.

- IMAM Mass maintenance of approp.requests. - KE55 Mass Maintenance PrCtr Master Data. - XD99 Customer master mass maintenance. - XK99 Mass maintenance, vendor master.

(10)

By: Rob

I am following the below step: 1. Serial number profile is created.

2. Assigned sales order procedure (SDAU) and delivery proceedure to serial number (SDLS).

3. Profile is assigned in material master record

4. Assume there is a stock of 10 quantity without serial number (you can do 561 for initial stock posting )

5. IQ01 created serial number for all the 10 stock. 6. VA01 created sales order for one quantiy 7. Assigned one serial number for this material

8. Sales order is saved and delivery and PGI is done for the same serial number and material

9. MMBE stock is reduced with one quantity

10. MB51 if check the material document in serial number TAB i can see a message that "The material is managed in serial numbers"

So now my question is why I can't see serial number in material document? How can able to see that? what is the configuration required?

Whatever settings you have maintained is correct. I shall share as to what happens in our business process.

VA01- Sales order Vl03 - Delivery LT03- Transfer Order

After transfer order there is a transaction used ZL02 where in the delivery number is entered and on executing, a screen pops up asking for the serial number. Here we enter the serial number maintained for the material and is got from MMBE. And the serial number is captured for the material.

Pls check for the serial numbers in MMBE and I suppose a program needs to be created by an ABAPer for the serial number to be fetched and a transaction to be

created and associated with the program.

I need Serial Number Profile tables as soon as possible. T377P - Serial Number Management Profiles

T377P_T Texts for Serial Number Management Profiles T377X Documents Allowed for Serial Number Management T377X_T Texts for Serial Number Management Documents T5KSN ROE Serial Number

SERI Serial Numbers

EQBS Serial Number Stock Segment EQSE Serial Number Records IQ09 - Check Material Serial No

(11)

In outbound delivery, post goods issue failed because of serial number, but this serial number was not assigned to any other material.

Check the serial number and material with IQ03. Serial number is material specific.

When I looked at the IQ03, for the serial no "#162559019S.", I realized that the status is still remain as EDEL and ESTO.

Supposingly, the status should only has ESTO. Is there a way to remove the status "EDEL"?

Go to IQ02, do the following steps:

1. Go to edit -> Special serial number function -> manual transaction 2. Choose "to stock"

The status should be ESTO now. Try it.

EDEL status shows that it is assigned to a delivery. Change it by going into IQ02 --> Edit --> Sp.Serial number Functions --> Manual Transaction and make it 'to stock'

If the serial number has status EDEL ESTO that means the serial number is assigned to the Delivery, reversal PGI has not been completely performed.

Once you do that then only this will come as ESTO.

Please check your SD document flow if all the documents have been reversed. Click the Status of Serial Number Master record.

- ESTO status In the warehouse. means .. open..

- EDEL (Assigned in delivery note). According to this status, transaction 'Goods issues' is not allowed.

- ECUS At customer site

Sales Office Address, Change and Assignment

SAP Functional ==> SD In SAP

Where to change the ADRNR field for a particular sales office?

SPRO --> Enterprise Structure --> Definition --> Sales & Distribution --> Sales Office --> Define Sales Office. Here go to the address & change the address & the new address will reflect in the output.

(12)

In which table name address of the sales office (SD ) is stored. Also tell in which table, description of the sales office is stored.

table TVBUR-vkbur is the sales office

table tvbur it contains a field called address number. ADRNR take that field(ADRNR) and compare with table ADRC-ADRNR.

in table ADRC you will find name, description, address and all other data. table TVKBT -- description of sales office.

Assignment of Single sales office to multiple sales organizations.

We have a scenario where we need to Assign single sales office to multiple sales organizations in CRM. When I am trying to assign sales office to more than one sales organization 1st assignment between Sales office and Sales Org is getting deleted, and only the 2nd assignment is available.

At sales office level in Function tab, it is showing only the assigned sales Organization (only one sales org), how to assign one more sales org to this sales office here.

The assignments are on the lower node. Which means you will go to Sales office, go to function TAB and assign multiple sales organizations there.

In the change form click New entry and assign the new sales organization and distribution channela and division combination.

You can assign as many combinations as needed here. 1. There are 2 version in CRM Org Model.

a) SBIV (Standard Backend Integration Version) b) EBIV (Enhanced Backend Integration Version)

2. EBIV is used to handle multiple assignments in CRM system.

3. As you know we have 3 Org Units as far as Sales is concerned i.e. Sales Org, Sales Office, Sales Group.

4. In R/3 there is a standard way to maintain multiple assignments among these org units. Ex: Sales Group 'X' works (assigned) for 2 Sales Offices 'North' and 'South' simultaneously. 5. But in CRM this assignment is not as common as in R/3 and is not supported thru SBIV. 6. If you would like to have these multiple assignments made in R/3 available in CRM as well you may want to go thru EBIV.

(13)

8. In EBIV divisions and distribution channels can only be assigned to sales units (sales organizations, sales offices, and sales groups). If they are assigned to any other neutral Org Units (Org Units without any Org Attributes), those assignments would be deleted once you shift from SBIV to EBIV.

What are the steps to create a sales order?

To create a standard sales order, proceed as follows:

In the initial screen, choose Logistics - Sales and distribution - Sales. Choose Order - Create (VA01).

Enter the order type and, if necessary, the organizational data.

The values for sales organization, for distribution channel and the division are usually proposed from user-defined parameters. Entries for the sales office and the sales group are optional.

The sales areas (sales organization, distribution channel, division) are derived from the sold-to or ship-sold-to parties. This means that you do not have sold-to enter the sales area when you create a sales document.

If you do not specify a sales area in the initial screen, the system uses the sold-to or ship-to parties, which you entered in the overview screen, to derive the sales area.

If there are several sales areas for that particular sold-to or ship-to party, you can choose the right sales area in the following dialog box.

The system then copies the selected sales area into the entry screen. Choose Enter. Enter the following data:

- Sold-to party or ship-to party

If you only enter a ship-to party, the system uses this to determine the sold-to party and if necessary, the sales area. If there are several sold-to parties or sales areas for one ship-to party, a dialog box appears where you can choose the one you require.

An error message appears in the status bar to inform you if the system is not able to

determine a sold-to party. If you enter a sold-to party that is also a unique ship-to party, the system automatically copies it as such and informs you in the status bar.

- Customer purchase order number - Material numbers

- Order quantities for the materials - Choose Enter.

(14)

If, for example, you defined several unloading points or several ship-to parties in the customer master record of the sold-to party, the system displays the alternatives in a dialog box. The system can display alternatives for any or all of the following data: –

- Unloading point - Ship-to party - Payer

- Bill-to party

Select the valid data from these proposals by positioning the cursor on the line and choosing Choose.

As soon as you have selected this data, the material data that you have entered is displayed. If the system carries out an availability check and finds that there is insufficient stock for an order item to be delivered on the requested date, it displays a screen on which you can choose between several delivery proposals. You can find more information about this in Reactions to the Availability Check in Sales Documents. If you want to enter further data for the header or items, choose the corresponding menu entry. If you want to change data for the items, select the items before you choose a menu entry. Enter all necessary data.

Save your document.

Duplicate customer purchase order

If you are facing a problem with duplicate customer purchase order as your company does not allowed a same customer purchase order with the same sales order type.

You can activated the check for duplicate purchase order with "VOV8".

In the General Control Section, look for the field Check Purchase Order No and put

Default First Date is not Today

When end user created a new sales order with VA01, default First Date wasn't today, why?

Note:

1. Before today, default First Date was always today. 2. Nobody change system configuration.

Although you mention that nobody change the system configuration, it is very unlikely that the system will mis-behaved after one day.

(15)

Usually, after checking, you will find that someone have actually change the configuration as it could not be a software bug since you have been using it for quite sometime without any problems.

The date is control by each Sales Order Type for each Sales Document type whether is it a - OR - Standard Order,

- RE - Returns etc.

Verify the Sales order type configuration with the following path:

IMG: Sales and Distribution --> Sales --> Sales Docs --> Sales Doc Hdr --> Define Sales Doc Types (transaction vov8) will let you control this by sales document type.

There is one field (Lead time in days) which "specify the number of days after the current date that the proposal for the requested delivery date in the sales document should be". This should be blank if you want the system to propose current day for delivery date. SAP SD User Ticket:

Confirm quantity date is next day. I have created a sales order for 6 Tons. I have a stock of 10 Tons which is not reserved for any Sales order. I mean it is unrestricted stock. After creating sales order system should show as Doc date for confirming quantity for dispatch but it is showing the next day in the schedule line. What could be the reason?

The reason could be there should be processing times configured in the system

like..pick/pack times, transit time. Please check the shipping point and also the route for different lead times.

The other possibility could be holidays.

First check what the requested delivery date you have put in the order. Next check the lead times, for that you can go to the schedule line of the item and click on the Procurement tab. Check in OVLZ ---> In Pick/pack time workdays, any value is maintained there. For

example, if 5 is given in this field, even if stock is available on the same day of order creation, system will allow to do PGI only after 5 days from the date of order created. Also go to VOV8, select your sale order type and check the Field "Lead Time in Days".

I'm using service material in my sales order and I need the schedule line to confirm the quantity always in the actual day (not depending on the delivery date).

T. Code: VOV8

Select your Sales Doc. type and Double-Click. In Tab: Shipping,

(16)

Check Box: Immediate Delivery (press F1 to read more about this functionality). Note: There are few more settings that you may check:

1. T. Code: OVLZ

Field: Pick/pack time wrkdys whether you have maintained any value. It should have been blank

2. T. Code: VOV8

Check how many days mentioned in Lead time in Days. If it is mentioned any days, remove it.

3. T. Code: OVZ9

Checked the Box: Check without RLT .

4. Check in material master MRP2 view how many days are maintained for the fields In-House production and GR Processing Time.

Auto proposed all the dates when creating Sales Order

How can I make the system auto create all the Sales Order date during creation? Each Sales Order can have different date proposal settings.

Follows this step to set the default Sales Order Type proposal date: - Goto VOV8, double click on sales order type.

- Look and tick the fields Propose delivery date and Propose PO date.

After making the necessary IMG changes, you need to input the Delivery Plant field for each Materials that you want the system to propose the default date.

To change the Materials field Delivery Plant:

Goto MM02, Select the View Sales: Sales Org. Data 1 and fill in the Delivery Plant. Testing:

Now, try creating a new sales order for the material and SAP will auto proposed all the dates in the sales order.

(17)

Define whether the Material can be used at which Sales and Distribution

process

Here you define how the system responds when entering a sales and distribution document with this material in the differenet Sales and Distribution Process Flow..

You can use the material status, for example, to prevent orders from being entered for parts to be discontinued.

OR

To temporary block the creation of Sales Order for a certain materials.

Set the material status parameters in transaction SM30, Table Views V_TVMS. Click Maintain and double click into the Materials Status code.

You can set three types of reponse for each Sales and Distribution process :- 1. no dialog

2. warning when entering the document

3. error message (that is, the sales and distribution document cannot be entered on the basis of the material status)

Assign a Cost Center manually in a Sales Order

(VBAK-KOSTL)

The Cost Center Determination settings is in OVF3 - but there are some cases where the Cost Center must be exceptionally changed.

If the document category for order type in IMG VOV8 is defined to be "I" which belong to order type FD - Deliv.Free of Charge, then the field cost center is active for input during transaction VA01.

Alternatively, you can specify an order reason and assign a cost center to an order reason. However the standard SAP works only at the header level though, so it would not work if cost center is needed on the line item.

(18)

- Free deliveries - Returns

- Deliveries of advertising materials

You can also make cost center allocation dependent on the order reason, for example: Order reason: Damage in transit

Order reason: Free sample

Both the IMG settings are done in transaction OVF3, either with/without the order reason.

Sales and Distribution - Transfer of

Requirements

The MRP department is informed about the quantities and deadlines by which incoming orders

should be delivered. The system checks the availability of the goods based on the requested

delivery date of the customer and creates MRP records which contain all necessary information

for passing on to planning. It ensures that the goods are available in time for the delivery.

Materials planning transfers the reported requirements and creates orders or purchase

requisitions from them etc.

For controlling transfer of requirements, you have to carry out the following steps:

1. Each requirement type has to be allocated to one requirement class only. 2. The transfer of requirements must be switched on at requirements class level, the sales

documents at schedule line level.

3. You must define a check group. It is possible to have this check group proposed for the

initial creation of a material master record.

4. Note that a plant must exist for transfer of requirements to be carried out at document

item level.

OVZG - Requirement class It specifies the following points:

- whether an availability check and a transfer of requirements is carried out for a

transaction (for sales documents, fine tuning using the schedule line category is possible),

- whether the requirements are relevant for MRP,

- the allocation indicator from the sales view which controls the settlement of customer

requirements with requirements

- whether an item is to be settled to an auxiliary account assignment, - the settlement profile,

(19)

- the results analysis key.

(Use transaction SM30 for V_* configuration)

OVZH - Requirements type

V_TVEPZ_V - Assignment of requirement type to Transaction

V_TVEP_V - Schedule line category

OVZ2 - Define Checking Group

V_TMVFU - Define the checking group that the system proposes when you create a new material

master record. You can overwrite the default value for the checking group in the

material master record.

Explain transfer of requirement? How it works and how to configure? It specifies the following points:

1. Whether an availability check and a transfer of requirements is carried out for a transaction (for sales documents, fine tuning using the schedule line category is possible),

2. Whether the requirements are relevant for MRP,

3. The allocation indicator from the sales view which controls the settlement of customer requirements with requirements,

4. Whether an item is to be settled to an auxiliary account assignment, 5. The settlement profile,

6. The results analysis key.

When a sales order is raised, then the system check for availability of goods. If the

availability of goods is not there, then the system creates a TOR for the supply of goods to PP. Then PP can do procure or produce the goods. This can be configured by creating requirement class and requirement type and in the corresponding schedule line category requirement had to be checked.

The MRP department is informed about the quantities and deadlines by which incoming orders should be delivered. The system checks the availability of the goods based on the requested delivery date of the customer and creates MRP records which contain all necessary information for passing on to planning. It ensures that the goods are available in time for the delivery.

Materials planning transfers the reported requirements and creates orders or purchase requisitions from them etc.

(20)

The following sections on the transfer of requirements describe how to control the transfer of requirements.

The transfer of requirements is basically dependent upon the following factors: - requirements type

- requirement class - check group

- schedule line category

The transfer of requirements is controlled globally using the requirements class which is derived from the requirements type for all sales document types.

For the sales document types, fine tuning is also possible at schedule line level. This fine tuning is described in the section "Defining the procedure for each schedule line category". Note that the requirements classes are also used in production so you should coordinate any changes to the requirements classes with production. The requirements type and, eventually, requirements class are determined in the strategy group so all changes made there should also be coordinated with production.

For performing transfer of requirements, you have to carry out the following steps: 1. Each requirement type has to be allocated to one requirement class only.

2. The transfer of requirements must be switched on at requirements class level, the sales documents at schedule line level.

3. You must define a check group. It is possible to have this check group proposed for the initial creation of a material master record.

4. Note that a plant must exist for transfer of requirements to be carried out at document item level.

Requirements transferred to planning are further processed in the module MM. You must, therefore, coordinate the transfer of requirements with the module MM.

Define Tax Determination Rules

You specify the valid tax types in transaction OVK1. More than one tax type can be defined for a country by defining the sequence.

(21)

In the standard SAP R/3 System, the elements of tax calculation are predefined (for example, tax condition type "MWST" for taxes on sales and purchases).

Assign the plant for Tax Determination in OX10, using the country key, the SAP System recognizes which tax type is valid for a plant and thus which taxes are relevant when creating an SD document.

Define the Customer Taxes in OVK3, you will maintain the tax code in Customer Master. Define the Material Taxes in OVK4, which will then be maintain in Material Master. For example :-

MWST GST 0 Tax Exempt MWST GST 1 Liable for Taxes Now, you define the Tax Determination in VK12.

VK12 - Domestic Taxes/Export Taxes Condition Type MWST

Customer Taxes Material Taxes Rate Taxes

0 0 0 %

0 1 0 %

1 0 0 %

1 1 9 %

In this example, if both the Customer Master and Material Master Tax code is 1, Tax will be included when you create the Sales Order.

Tax Code in Customer Master / Sales Order

How can we maintain the Tax Code (Tax code - which we maintain in MWST Condtion Records) in Customer Master or in Sales Order?

There are few points which I would like to remind you:

1) MWST is a tax condition which is applied to customer to whom we are selling. The rate of tax is depend on various parameteres, whether is fully liable for tax or expemted (in case of Defence Customer)

2) There are few parameteres which we apply tax condition. Whether customer is tax liable? Whether material is tax exempted?

For example, if you are selling a goods which are free for tax to any customer, put the Tax Indicator (at MMR as '0'). If your

material is tax liable pur the Tax Indicator (at MMR as 1). If your customer is not liable for tax at all (like the case of Indian

(22)

3) Now, at VK11 you need to mainatain your pricning conditions with all the combinations like: 1 0 1 1 0 1 0 0

4) While maintaining your Material Master Records or Cusotmer Master Records, you must identify, which are tax liable and which are tax exempeted.

5) In anycase, as a SAP standard Best Practises, while processing a sales order, you must retrieve a Tax condition record from SAP database only and not entered Manually. Accordingly, at V/06, the MWST condition Defintions, the field for 'Manual Entries', it would be marked as - D (Not possible to process Manually).

Due to this setting, normally, you cannot maintain Condition tax code during sales order processing. And in Cusotmer Master, you can only maintain Tax Indicator and not Tax Code. 6) In case your client insists for Manual entry of Tax code during Sales Order processing, you can change the field at point 5) above to C-Manual entry is priority instead of D.

Taxation Explain with an example

I'm assuming that, the country is India and based on its requirement:

Sales tax is a state government revenue. There are two types of sales taxes, Local sales tax & central sales tax. Local sales tax is intra state whereas CST is inter state.

Example of LST : Point of sale i.e. delivering plant & ship to party are within the same state. The rates are defined by the respective state governments.

Example of CST : The Delivering plant & Ship to party geographic locations are 2 different states. At the point of sales from one state, the ST goes to that state govt. & consignment is despatched to the Ship to party. Once that consignment is received at the ship to party state, sales tax will be levied once the sales is registered there. For this case, the LST that is applicable by the Ship to party further will not be applicable in all probability to be captured in SAP.

Stock transfer : This does not attract any sales tax. The consignment is transferred from one D plant to another D plant irrespective of inter/intra state sales. The invoice that is

accompanied with the consignment thus shall not have any final value. It's a zero value invoice, but the basic prices needed to be mentioned.

The selling organisations normally needs to register with the sales tax authority of the respective state to have a warehouse or D plant to avoid the double taxation for their dealers/distributors.

(23)

Now, the pricing procedure that is there in 4.7 is Factory sale with formula-JFACT, in which the CST condition type is JIN1 & the LST is probably JIN2. There may be surcharge cond types as well which will calculate the amount on either JIN1 or JIN2.

For config :

1.SPRO > S&D > Basic fn. > Pricing > Pricing control > Define & assign Pric. procedure > Maintain Pric proc.

2. The tax rates are normally driven from the Tax classification of Customer & Material access. To do this config, S&D >Basic fn. > Taxes. You need to include the condition type for country IN in 'Define tax determin rule'.

3. Same path : But go to Tax relevancy of master records where you configure the condition type & options of rates that will flow to these masters. One needs to understand here properly as u need to have unique combinations for picking the sales tax rates. I will try to demonstrate the smallest example. Let's say, the LST rates are 2%,4% & 0%. I will have two options for material master here. 1 for taxable & 2 for not taxable.

For customer master, I will have 1-LST 2%, 2-LST4% & 3-LST0%. When I create master records for LST thru VK11 for JIN2, I will chose the access where the combinations of customer & material tax classifications are available. If this access does not exist create it under an access sequence. But normally this is standard. The condition records will look like, Cust-Tax classi. Material tax claasi. Rate Tax code

1 1 2% A1 2 1 4% A1 3 1 0% A1

Remember, rates are flown from the tax codes. Tax codes can be created thru T code FTXP. This is normally a FI job

SAP SD: Scheduling Agreement Vs Contract

A schedule agreement contains details of a delivery schedule but a contract just contains quantity and price information and no details of specific delivery dates

What's the difference between schedulling agreement with normal order? What's the condition for us to choose schedule line or order?

Both of them contains schedule line, price, quantity. There are a couple major differences:

(1) - Schedule agreements allow you to have 2 different sets of schedule lines (VBEP-ABART). Standard SAP you should have two sets of tabs - of schedule lines. One Forecast & the other JIT. Forecast forwards the schedule lines to planning (seen in MD04) and JIT passes them to shipping (VL10). They can be identical or different. Typically these are used

(24)

for component supplier customers (namely Automotive). The customer will provide you 4-10 weekly buckets (usually a

Monday date) of future forecast qtys. Also send you 1-2 weeks of individual FIRM ship dates - which are entered on the JIT. It comes down to the customer not knowing exactly what they need next week, but they don't want to suprise you with a large order qty, where your lead times are 5+ days. The forecasted qtys they sent last week should account for this. (2) Cumulative Quantities are tracked and influence how the schedule agreement passes requirements to both forecasting and shipping. These qtys are sometimes requested by the customer on ASNs. Cumulative qtys reset at year end unless you've got a customer calendar or you've modified standard SAP userexits to not reset.

Schedule agreements are very nice when the customer sends EDI data (830s = forecast or 862s = JITs). Outside of that they can really cause trouble regarding daily maintenance, missing requirements, cum qty corrections, year end processing, etc.

One alternative would be to use customer independent requirements - entering the weekly, monthly forecasting qtys and entering standard sales orders (with or without multiple schedule lines) to represent the true firm qtys.

Sales Order Mass Change

I am a SAP SD consultant and recently faced with two new terms, mass order change and ALV , I also need to know about the transaction code.

There is transaction MASS which can be used to carry out mass changes in the sales order and other objects.

Mass Maintenance: (Use to change multiple fields in multiple documents at the same time). I have done mass change for customers; and orders should work the same way too.

1) Try t-code [MASS] and select sales orders & execute

2) Choose the table or tables for your selection criteria and also for fields you want to change. Then execute. (suppose your selection criteria fields are from "sales order header data" table and the field you want to change, is in "item data" table)

3) Put in the sales documents(21000000, 21000001) you want to change and also the items(10) you want to change.

- click on " choose selection fields" button

- From the Pool, move the fields you want to the "select fields" using arrows. 4)From mass maintenace menu, click on "Enter new field values"

-click on "sales order item data" tab and choose the field you want to change. (for example. I want to change plant for item 10)

-enter the new value (of the plant to be) -click on "Adopt" and execute

5)In "sales order item data" tab, you see the new value of the plant you entered at the top and the old values of item 10 are below.

(25)

-click on "change field values" button. you see all the old values are changed to new values. -save

Note: it will take some time depending on how many records you have.

Check: Go to [SM37] and see the status of the job you are running and once finished, export the spool file to a spreadsheet.

Before you do mass maintenance, go to the particular table in [se16] and get the results. Then do the mass maintenance and compare the results with this one. If they match, then you are good to go.

Note: If you have any user exits that affect the results, ask them to deactivate the MODCHECKS still you are done with mass maintenance & activate them again.

Is there a way to change the billing date on a ton of sales orders with same old billing date to a same new billing date?

This can be done using the mass transaction: Transaction: MASS

Object Type: BUS2032

Tables: SD Document: Business item data

Sel Field: Billing Date (MASSSDHE and MASSSDPO)

- Or you can just select by document numbers (May be more efficient) Execute - List will be provide for changes

Sel Chg Fld: Billing Date

Set new billing date value in the New Values field Click on lower billing date column

Click on Carry out a Mass Change button Click on Save button

Suggestion is to test this on a few orders in your development system to get a feel on how this works before applying this to any production data. MASS is a very powerful tool.

I have 100000 sales orders whith an incorrect price and I would like to do a massive condition update with pricing type "B" (Carry out new pricing). Is there a transaction or program for this?

Go to VA05 execute the report. Select all sales orders you want to update the price, Go to the Menu EDIT --> MASS Change ---> New Pricing. System will display all the re-pricing options. Select B. It will re-price all the sales orders.

You can try for one or two order initially check the results and if it is OK, then you can do for others

Release strategy for Sales order

Is it possible to have release strategy for sales order? Satish C Jha

(26)

As such SAP standard does not provide release strategy for sales orders similar to purchase orders. However this requirement of your can be satisfied through authorisation profiles; what I mean to say is that the sale order to be kept incomplete by the person who does not have the required authorisation & the person with proper authorisation will complete it for further processing. This is only one way of meeting your requirement.

Balraj G Saigal

In order to emulate a release strategy similar to purchase orders you can use the status profile in sales documents (BS02). IMG-Sales and distribution-Sales-Sales documents-Define and assign status profile.

How to do rebate processing

Rebates Processs in SAP is divided into three components 1) Configuring Rebates

2) Setting Up Rebates

3) Managing rebate agreeeements and payments Pre-requsiistes- Check the following:

1.The payer partner needs toi have the rebate field checked in the customer master on the sales area-billing doc tab.

2.The Billing type must be marked as relevant for rebates. 3.The Sales Organisation must be marked as relevant for rebates. Condition Technique :

Rebates, use the condition technique, but distinguish themselves from pricing in applying to transactions over time, versus on a transaction basis. Rebates have their wn field catalog and their own condition table naming convention.So you could have two condition table "001" one for pricing and one for rebates, which could have different key fields. You need to use the technical names A001 For pricing and KOTe001 for rebates when you use the query type using transaction SE 16..

Use create access sequence (AS). Enter 1 in field category for rebate specific. AS after going thru the right path of maintaining access sequence for rebates.

The big difference between the rebate and the pricing access sequence is that there is no exclsuion flag available for rebate related AS. This means multiple tables for an access sequence can be aplied at the same time.

Rebate related condition types are identified by codnition class -C.

After defining and creating condition types for rebated include them in the pricing

proceedure. The requirement should be 24 here which implies that the accruals are calculated on the basis of invoice/bill.

The other fields- alctyp and altcbv does not allow you to manipulate how a rebate is calculated. Also, remove the requiremnt 24, if u want to see reabtes at order time.

(27)

Now payment of rebates:

Payments can be maunal or in full settlement. When you do manual payments, it defines how much can be paid out during a partial settlemetn. You use partial settlement only when rebate agreement is defined for a full year but the paoyouts are supposed to happen on a monthly, quarterly or anyother specified period.

These accurals are based on sales volume and when they are posted billing is created int eh follwoing manner. Provision for accruals is debited and Sales revenue is credited. When rebate credit memo is created

Customer account/ is debited and Accrual provision account is credited.

Also, please note that when rebates are created without dependent ona material but on customer/material you need to refer to a material for settlement.

With Compliment: Srini

I have this same problem found in:

http://www.sap-img.com/sap-sd/rebate-process-with-ref-to-so.htm

However, can somebody explain it as I have problem in understanding the link. What exactly do you wish to know in Rebates? The total outline of the Rebate process or each and every step in the SAP system?

First of all rebates are more or less discounts which are offered to customers. The rebates are based on the volume of the business the customer does with you within a specified time. for eg if the customer agrees for Rs.1 Crore worth of business with u in 1 year, then you activate your rebate porocess. if at the end of the year the customer DOES achieve the target u offer him say 2/3/4 % whatever is decided. The rebates are passed on to the customer in the form of Credit notes.

The rebate can be given to the customer at one time or in installments also. This is broadly the outline of the rebate process.

R.Sreeram

Note : I recomend you to study the theory part of why rebate and why not a discount. This will help you understand better.

May be I can help you with rebate process.(IN -IMG) 1. define a rebate agreement type

2. define a condition type group

3. define a condition type and place this condition Type in the pricing procedure.(REQUIREMENT=24) ALSO IN THE PROCEDURE- ACCRUAL KEY = ERU

YOU ALSO HAVE TO DO THE ACCOUNT DETERMINATION FOR REBATES. Once you have defined all the 3 and assignment starts.

(28)

Assign the agreement type to the condition type group Assign the cond type group to the condition type. Condition technique is also used in rebates.

REBATE ACTIVATION- IN CUSTOMER MASTER, SALES ORGANISATION AND FOR THE BILLING DOCUMENT.

After having done this please proceed to maintain the condition record for the rebates (transaction code-vbo1)

Note: if you maintain the requirement coloumn with the requirement as 24 - the rebate will be affected in the billing document and if you dont give the requirement as 24 your rebate will be affected in the sales order.

The rebate process is completed when you have created a credit memo to the customer. The document type for the partial settlement is R3.

Please make sure you open two screens SO THAT YOU CAN COMPARE THE NEW ENTRIES WHAT EVER YOU'RE DEFINING WITH THAT OF THE STANDARDS or first you try with the standard condition type boo1, boo2

boo3 boo4.

AFTER YOU HAVE FINISHED A COMPLETE SALES CYCLE OF CREATION ORDER , DELIVERY AND BILLING.

GO TO THE CONDITION RECORD IN CHANGE MODE (VB02) AND SETTLE THE ACCOUNT PARTIALLY.

I hope this will be of any help to you. Praveen

In a simple way,

1. First you need to create a Rebate agreement.

2. Create condition record for rebate giving the rebate rate and accrual rate.

3. when the rebate relevent billing doc is generated, the rebate and accruals are determined and posted in a seperate GL account as a noted item - amount to be settled. Also it gets copied in the rebate agreement.

4. create settlement run using credit memo request and then credit memo to settle this amount with the customer.

This is what the link says.

(29)

If I need to make a rebate for a customer what is the process involved. I am providing some info on rebates which I know.

Rebate agreemnts is based on agreement types.Conditon records which are created like B001 and B002 are linked to the rebate agreeements specifying the rebate rate + the accrual

rates.condition records specify the rebate rate and the accrual rates. Consider an example..

You decided to give a rebate of 3% to a customer whose sales vol is $1000 for a particular SO

Then the rebate value is $30..

Now when you make the rebate settlement by doiing the Credit memo and you decide to pay $27, then the accounting will be generated saying 27$ paid towards rebate and 3$ is the accrual which you owe to the customer

Procedure:

Rebate agreement: Transaction code: VB01

When you go to VB01, choose agreement type 0002 and then in conditions give Material rebate

1 20 20 30

Now create a sales order with a material say M-11 for SOrg 1000 12 00 with QTY 6 Now check VB03 and see rebate agreemtent it will say Accruals 120 and payments 0 since your rebate is not settled still.

Rebate setllement

Go to VB02 enter ur sales deal no, and change the agreemetn status to B then enter Shift+F12 and enter the amount to be paid for example u say $80

Then check in rebate payments rebate doc and partial setllemetn since you have not paid in full.

View the credit memo request

Remove the Billing bloock Go to VA01 and put order type G2 ,,,go to create with ref and enter ur Sales order no,,,save the doc now...

Then go to VF01 and enter the credit memo reqst no generated...save the doc no and go to VF02 and say release to accounting

Now the final settlement will be this way Accruals:120

Accrual reversed:80 Rebate pay:80 Amount payable:40

(30)

So the balance 40 is still the accrual

This is an example how a rebate will be processed with ref to a SO with an example. SAP SD Tips by: Priyam

How to do a rebate agreement for a specific customers

with settings details?

1. Create a condition by copying a a standard condition like BO03 in V/06

2. Assign this condition in the std pricing procedure with acct key as ERB and accural key as ERU - V/08

3.Create a Rebate Agreement in VBO1 (It is O = Owl and not zero). No will be generated choose 003 - Customer rebates, enter the customer code, the validity and check for the status shld be in Open, click on the conditions enter the percentage and accrual amount. You also can have scales in this. Also you need to maintain the material for the settlement

4. Create a sales order for that customer and check the rebate agreement. 5. You can see the rebate condition in the invoice only.

6. Once you have posted the invoices, then go to rebate agrrement no. clicl on verficayion and it will show the order details.

7. For settlement change the status of the rebate to B - release for the settlement.

8. Credit memo request will b generated copy the no. and go to VA02, remove the blocks if any and create an invoice (credit memo).this will show u the accrual amount.

9. In both the invoice and the credit memo check the posting - accounting document it will show u the accrual as negative.

10. Again go to rebate aggreement and check the status it will show you D - Final settlement of agreement already carried out

Consignment Sales Process in SAP

The consignment process in SAP standard consist of four small processes: Consignment fillup (send materials to customer consignment).

Here you have a consignment fillup order and a consignment fillup delivery. Consignment issue (issue materials from customer consignment to the customer). Here you have a consignment issue order, consignment issue delivery and a consignment issue invoice. (the flow is very similar to a normal OR flow, but the materials are issued from the consignment stock instead of plant stock unrestricted).

Consignment return (return materials from customer ownership to customer consignment). Here you have a consignment return order, consignment return delivery and a consignment return invoice. (the flow is very similar to a normal RE flow, but the materials are returned to the consignment stock instead of plant stock returns).

Consignment pickup (pickup consignment stock and move it to plant stock). Here you have a consignment pickup order and a consignment pickup delivery.

(31)

Note that in consignment fillup and consignment pickup there are no invoices since there is no change of ownership for the materials.

How to perform a consignment order?

In consignment orders you are allowing the stock to sit in your customer location. Once he informs that he used the stock you will invoice him. If he returns the stock you will accept the stock to take it back.

It is defined in 4 steps. 1. Consignment fill up: Sales document type is KB Item category KBN

shedule line category E1

In this step, you are not invoicing the customer. document flow is sales order ---- delivery item category. It will not be relevent for billing and pricing because you are not charging money for these goods in this step.

In schedule line category, you will set movement type 631 & set for availability check and TOR.

2. Consignment Issue.

Once the customer informed you that he used all the goods or partial goods then you will create consignment issue for used goods.

Sales document: KE Item category: KEN

shedule line category: C0 or C1

Here you are invoicing the customer(because he used the goods). you are assigning the delivery documnt and billing document to the sales document.

In item category, you are setting relevent for billing, pricing, special stock.

In schedule line category, your setting is 633 movement type, relevent for availability check & TOR.

3. Consignment Return:

Customer found that some goods are damaged or he not able to sold the goods he want to send it back. that you are creating this document.

Sales document type: KR Item category: KRN Shedule line category: D0

You will assign delivery document and billing to sales document. you will create return order, return delivery, return billing.

(32)

Your setting item category relevent for billing, returns, pricing, special stock.

Your setting schedule line item category: 634 movement type, NO availability NO TOR. 4. Consignment Pick up:

Even if you create the consignment return the goods are not come to direct to your plant. For that you need to create consignment pick up. here the owner ship is not changing so you do not need to create billing.

Assign retrun delivery to sales document type. Sales document: KA

Item category: KAN

schedule line category: F0 & F1

Your setting item category relevent for returns. any shedule line category relevent for 632 movement type, MRP, availability check, delivery.

Now you check your plant stock. Stock will increase.

Issue free goods to selected Customers

Client wants to issue free goods to selected customers after the said customer buys a specified quantity of a good during the festive season starting 02 December to mid January. for example customer A buys 34 cartons of Corn Ice-cream, we offer him 12 free corns. this should then reflect as cost in our accounts. the rest of the system is already up and running and should not be inconvinienced. How do I set it up?

1.Run trans. VBN2 to first create master record for free goods as follows: Enter following information in selection screen:

- Free goods type: NA00

- Sales org, distribution channel, customer # and execute. Now in next screen create the record as follows:

- First select the exclusive button and verify that you are in exclusive view. (that is if you want exclusive)

- Material#, Min qty - Say 34 cartons. (check in what units you want to manage) From: 34 cartons

unit of measure: Free goods: 12 Pcs Unit of measure: Pcs

Calcualtion type: 1 or try the other options

Deliver control: Blank or any of the other options suitable to you. Now save and exit.

Now run VA01 for 34 cartons and press enter. The system will automatically propose the free goods

(33)

item at no additional charge. Try higher order qtys and see if the free goods qty are scaling up.

If not adjust the calculation parameters in the master record screen It should be transaction VBN1. Sorry for the error.

VBN2 is to change the record. VBN1 creates it. Kris J

If you want to give free goods to some of the customers than 1. create a customer group say 99 for FREE GOODS

In Free Goods Menu:

2. add a feild catalog for CUSTOMER GROUP

3. create a condition table (free goods) say 555 only for customer group 4. create a sequence say FREE with condition table 555

5. create a condition type say FREE with

6. maintain pricing procedure say ZFREE with condition type FREE Now assign:

7. Active Free goods Determination or Assign with your sales organisation this procedure ZFREE

8. Create free goods determination with transaction code /nvbn1 for FREE with Key Csuomer Group

99 for exclusive

Give customer Group say 99 and from 34 to 34 free 12

Supressing Fields in Sale Order

To make optional / mandatory you can use in IMG - S&D-> Basic > Functions-> Log of incomplete Procedures => select the fields > from the tables and the system will check for them (OVA2/VUA2)

To make a filed entry enabled or grey (non-entry allowed):

User exits in the program MV45AFZZ-USEREXIT_FIELD_MODIFICATION This user exit can be used to modify the attributes of the screen fields.

To do this, the screen fields are allocated to so-called modification groups 1 - 4 and can be edited together during a modification in ABAP.

(34)

If a field has no field name, it cannot be allocated to a group. The usage of the field groups (modification group 1-4) is as follows:

Modification group 1: Automatic modification with transaction MFAW Modification group 2: It contains 'LOO' for step loop fields

Modification group 3: For modifications which depend on check tables or on other fixed information

Modification group 4: is not used

The FORM routine is called up for every field of a screen. If you require changes to be made, you must make them in this user exit. This FORM routine is called up by the module

FELDAUSWAHL.

With Compliments by: Taner Yuksel

Actually suppressing fielding sales orders userwise is quite easy. We are doing it in our company. For this we use userexit FORM USEREXIT_FIELD_MODIFICATION in MV45AFZZ.

Below is the sample code

IF SCREEN-NAME = 'VBKD-ABSSC'.

AUTHORITY-CHECK OBJECT 'ZMV45AFZZ' ID 'SCRFNAME' FIELD SCREEN-NAME. IF sy-subrc = 0. SCREEN-INPUT = 1. else. SCREEN-INPUT = 0. ENDIF. endif.

You place the authority check object in authorization profile in the role of the users, who should have access to the field (in this case it is VBKD-ABSSC), and there assign the corresponding fields that are to be accessed via this userexit.

Some Light on Batch Determination

On batch determination, the whole process, how it is determined automatically in the order.

(35)

A1) Normaly we use batch determination at delivery level, because at the time of order material may or may not be created.for this material should be configured with batch and batch determination should be checked in sales views of material.

A2) Batch Determination during order Creation.

For this you need to maintain a Classes d for you Material. Depending on the Manufacturing process you can define the characteristics for your material.

Ex: Purity for Medicines, Resistance for Electric Items.

You need to create a class (You might have to create a new class type) which incorporates the characteristic.

First Create the Characteristic Using Ct04 and then using Cl02 create the Class including this characteristic.

Then in your material master Classification View Enter this class.

Then Create a Batch for the particular plant and Stor Loc using MSC1N.Give the value of the characteristics in this batch.

Then go to SPRO ->Logistics General ->Batch Management and maintain the Condition Technique (Procedure, Strategy Types and assignment to sales docs etc).

Then Create the Batch Determination Record using VCH1.

Difference between Item Proposal and Material

Determination

What is the difference between the item proposal and material determination product proposal?

Item proposal and product proposal are the same.

Item proposal is the list of materials and order quantities that can be copied into the sales order from the customer master data.

We use VA51 to create the item proposal. Here we get a number.This number is then linked to the customer master data in the sales view. This is very commonly used.

Material determination is very closely related to item proposal /product proposal and is used to swap one material for another in the sales order using the condition technique. I have not seen Material determination procedures used in the projects I have worked.

SAP Tips by: Prashanth Harish Item Proposal or Product proposal:

References

Related documents

Transport-level security is normally used in conjunction with X.509 credentials for authentication, but can also be used without such credentials to provide message protection

And through our Privileged Care® Coordination Benefit, you will receive information and services from a licensed health care professional familiar with home care services

considered to people are you assigned social security number might ask for free, based on caller id for your information about an identity theft resource center.. Learn more so how

Best to st malo ferry tickets to break from weymouth at this in brittany ferries weymouth, shop and guernsey or perhaps browse the city a week.. Suggests spare capacity but the st

Should your daughter wish to have her baby covered from the date of birth, she will need to take out a family or single parent cover in her own name at least two months prior to

Essentially, SaaS backup solutions deliver the comparable benefits of using a virtual tape library (namely, a solution that uses more reliable disk-based storage), but

[r]

Try it online at ( http://gabrielecirulli.github.io/2048/ ) if you haven't played it to help you understand how to play it. The diagram below shows two examples where the center