Deming’s 14 Points for TQM

1. Constancy of purpose

Create constancy of purpose for continual improvement of products and service to society, allocating resources to provide for long range needs rather than only short term profitability, with a plan to become

competitive, to stay in business, and to provide jobs.

(2)

2

Deming’s 14 Points for TQM

2. The new philosophy

Adopt the new philosophy. We are in a new economic age, created in Japan. We can no longer live with commonly accepted levels of delays, mistakes, defective materials, and defective workmanship. Transformation of Western management style is necessary to halt the continued decline of business and industry.

(3)

3

Deming’s 14 Points for TQM

3. Cease dependence on mass inspection

Eliminate the need for mass inspection as the way of life to achieve quality by building quality into the product in the first place. Require statistical evidence of built in quality in both manufacturing and

purchasing functions.

(4)

4

Deming’s 14 Points for TQM

4. End lowest tender contracts

End the practice of awarding business solely on the basis of price tag.

Instead require meaningful measures of quality along with price. Reduce the number of suppliers for the same item by eliminating those that do not qualify with statistical and other evidence of quality. The aim is to minimize total cost, not merely initial cost, by minimizing variation. This may be achieved by moving toward a single supplier for any one item, on a long term relationship of loyalty and trust. Purchasing managers have a new job, and must learn it

(5)

5

Deming’s 14 Points for TQM

5. Improve every process

Improve constantly and forever every process for planning, production, and service. Search continually for problems in order to improve every activity in the company, to improve quality and productivity, and thus to constantly

decrease costs. Institute innovation and constant improvement of product, service, and process. It is management's job to work continually on the system (design, incoming materials, maintenance, improvement of

machines, supervision, training, retraining).

(6)

6

Deming’s 14 Points for TQM

6. Institute training on the job

Institute modern methods of training on the job for all, including management, to make better use of every

employee. New skills are required to keep up with changes in materials, methods, product and service design,

machinery, techniques, and service.

(7)

7

Deming’s 14 Points for TQM

7. Institute leadership

Adopt and institute leadership aimed at helping people do a better job. The responsibility of managers and supervisors must be changed from sheer numbers to quality. Improvement of quality will automatically improve productivity. Management must ensure that immediate action is taken on reports of inherited defects, maintenance requirements, poor tools, fuzzy operational definitions, and all conditions detrimental to quality.

(8)

8

Deming’s 14 Points for TQM

8. Drive out fear

Encourage effective two way communication and other means to drive out fear throughout the organization so that everybody may work effectively and more productively for the company.

(9)

9

Deming’s 14 Points for TQM

9. Break down barriers

Break down barriers between departments and staff areas. People in

different areas, such as Leasing, Maintenance, Administration, must work in teams to tackle problems that may be encountered with products or service.

(10)

10

Deming’s 14 Points for TQM

10. Eliminate exhortations

Eliminate the use of slogans, posters and exhortations for the work force, demanding Zero Defects and new levels of productivity, without providing methods. Such exhortations only create adversarial relationships; the bulk of the

causes of low quality and low productivity belong to the system, and thus lie beyond the power of the work force.

(11)

11

Deming’s 14 Points for TQM

11. Eliminate arbitrary numerical targets

Eliminate work standards that prescribe quotas for the work force and numerical goals for people in management. Substitute aids and helpful leadership in order to achieve continual improvement of quality and productivity.

(12)

12

Deming’s 14 Points for TQM

12. Permit pride of workmanship

Remove the barriers that rob hourly workers, and people in management, of their right to pride of workmanship. This implies, among other things, abolition of the annual merit rating (appraisal of performance) and of Management by Objective. Again, the responsibility of managers,

supervisors, foremen must be changed from sheer numbers to quality.

(13)

13

Deming’s 14 Points for TQM

13. Encourage education

Institute a vigorous program of education, and encourage self improvement for everyone. What an organization needs is not just good people; it needs people that are improving with education. Advances in competitive position will have their roots in knowledge.

(14)

14

Deming’s 14 Points for TQM

14. Top management commitment and action

Clearly define top management's permanent commitment to ever improving quality and productivity, and their obligation to implement all of these

principles. Indeed, it is not enough that top management commit

themselves for life to quality and productivity. They must know what it is that they are committed to—that is, what they must do. Create a structure in top management that will push every day on the preceding 13 Points, and take action in order to accomplish the transformation. Support is not enough:

action is required!

(15)

15

Chapter 10

Project Management

(16)

16

Definition of Project Management

Work Breakdown Structure

Project Control Charts

Structuring Projects

Critical Path Scheduling

OBJECTIVES

(17)

17

Project is a series of related jobs usually directed toward some major output and requiring a significant period of time to perform

Project Management are the management activities of planning, directing, and controlling resources (people, equipment, material) to meet the technical, cost, and time constraints of a project

Project Management

(18)

18

Structuring Projects: Pure Project Advantages

Pure Project

A pure project is where a self-contained team works full-time on the project

The project manager has full authority over the project

Team members report to one boss

Shortened communication lines

Team pride, motivation, and commitment are high

(19)

19

Structuring Projects: Pure Project Disadvantages

Duplication of resources

Organizational goals and policies are ignored

Lack of technology transfer

Team members have no functional area "home"

(20)

20

Functional Project

President Research and

Development Engineering Manufacturing

Project A

Project B

Project C

Project D

Project E

Project F

Project G

Project H

Project I

A functional project is housed within a functional division

Example, Project “B” is in the functional area of Research and Development.

(21)

21

Structuring Projects

Functional Project: Advantages

A team member can work on several projects

Technical expertise is maintained within the functional area

The functional area is a “home” after the project is completed

Critical mass of specialized knowledge

(22)

Structuring Projects 22

Functional Project: Disadvantages

Aspects of the project that are not directly related to the functional area get short-changed

Motivation of team members is often weak

Needs of the client are secondary and are responded to slowly

(23)

23

Matrix Project Organization Structure President

Research and

Development Engineering Manufacturing Marketing Manager

Project A Manager Project B Manager Project C

(24)

24

Structuring Projects Matrix: Advantages

Enhanced communications between functional areas

Pinpointed responsibility

Duplication of resources is minimized

Functional “home” for team members

Policies of the parent organization are followed

(25)

25

Structuring Projects Matrix: Disadvantages

Too many bosses

Depends on project manager’s negotiating skills

Potential for sub-optimization

(26)

26

Work Breakdown Structure

Program

Project 1 Project 2 Task 1.1

Subtask 1.1.1 Work Package 1.1.1.1

Level

1 2 3 4

Task 1.2

Subtask 1.1.2

Work Package 1.1.1.2

A work breakdown structure defines the hierarchy of project tasks,

subtasks, and work packages

(27)

27

Gantt Chart

Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 Activity 6

Time Vertical Axis: Always

Activities or Jobs

Horizontal Axis: Always Time Horizontal bars used to denote length of time for each activity or job.

(28)

28

Microsoft Project Example

Detailed Gantt Chart

(29)

29

Network-Planning Models

A project is made up of a sequence of activities that form a network representing a project

The path taking longest time through this network of activities is called the “critical path”

The critical path provides a wide range of scheduling information useful in managing a project

Critical Path Method (CPM) helps to identify the critical path(s) in the project networks

(30)

30

Prerequisites for Critical Path Methodology

A project must have:

well-defined jobs or tasks whose completion marks the end of the project;

independent jobs or tasks;

and tasks that follow a given sequence.

(31)

31

Types of Critical Path Methods

CPM with a Single Time Estimate

Used when activity times are known with certainty

Used to determine timing estimates for the project, each activity in the project, and slack time for activities

CPM with Three Activity Time Estimates (P.E.R.T.)

Used when activity times are uncertain

Used to obtain the same information as the Single Time Estimate model and probability information

Time-Cost Models

Used when cost trade-off information is a major consideration in planning

Used to determine the least cost in reducing total project time

(32)

32

Steps in the CPM with Single Time Estimate

1. Activity Identification

2. Activity Sequencing and Network Construction

3. Determine the critical path

From the critical path all of the project and activity timing information can be obtained

(33)

CPM with Single Time Estimate

33

Example #2

Consider the following consulting project:

Activity Designation Immed. Pred. Time (Weeks)

Assess customer's needs A None 2

Write and submit proposal B A 3

Obtain approval C A 4

Develop service vision and goals D B,C 4

Train employees E C 2

Quality improvement pilot groups F D, E 5

(34)

34

First draw the network

A B None A 2 3

C A 4

D B,C 4

E C 2

F D,E 5

Act. Imed. Pred. Time

A 2

B 3

C 4

E 2 D 4

F 5

Activity Description

Earliest Start

Earliest Finish Activity Time Latest

Start

Latest Finish

(35)

35

Determine slack times and Critical Path

A 0 2 2 0 2

B 2 5 3 3 6

C 2 6 4 2 6

E 6 8 2 8 10 D 6 10 4 6 10

F 10 15 5 10 15

S=

S=

S= S=

S=

0 S=

0

1 0

2

0

(36)

36

P.E.R.T. Program Evaluation and Review Technique:

CPM with Three Activity Time Estimates

Task Immediate Predecessors

Optimistic Most Likely Pessimistic

A None 3 6 15

B None 2 4 14

C A 6 12 30

D A 2 5 8

E C 5 11 17

F D 3 6 15

G B 3 9 27

H E,F 1 4 7

I G,H 4 19 28

(37)

37

Ex 2. Expected Time Calculations

Task

Immediate Predecesors

Expected Time

A None 7

B None 5.333

C A 14

D A 5

E C 11

F D 7

G B 11

H E,F 4

I G,H 18

Task

Immediate

Predecesors Optimistic Most Likely Pessimistic

A None 3 6 15

B None 2 4 14

C A 6 12 30

D A 2 5 8

E C 5 11 17

F D 3 6 15

G B 3 9 27

H E,F 1 4 7

I G,H 4 19 28

6

Time Pess.

+ Time) Likely

4(Most +

Time

= Opt.

Time Expected

6

15 4(6)

= 3 Time

Expected

(38)

38

Ex 2. Expected Time Calculations

Task

Immediate Predecesors

Expected Time

A None 7

B None 5.333

C A 14

D A 5

E C 11

F D 7

G B 11

H E,F 4

I G,H 18

Task

Immediate

Predecesors Optimistic Most Likely Pessimistic

A None 3 6 15

B None 2 4 14

C A 6 12 30

D A 2 5 8

E C 5 11 17

F D 3 6 15

G B 3 9 27

H E,F 1 4 7

I G,H 4 19 28

6

Time Pess.

+ Time) Likely

4(Most +

Time

= Opt.

Time Expected

6

14 4(4)

= 2 Time

Expected

(39)

39

Ex 2. Expected Time Calculations

Task

Immediate Predecesors

Expected Time

A None 7

B None 5.333

C A 14

D A 5

E C 11

F D 7

G B 11

H E,F 4

I G,H 18

Task

Immediate

Predecesors Optimistic Most Likely Pessimistic

A None 3 6 15

B None 2 4 14

C A 6 12 30

D A 2 5 8

E C 5 11 17

F D 3 6 15

G B 3 9 27

H E,F 1 4 7

I G,H 4 19 28

6

Time Pess.

+ Time) Likely

4(Most +

Time

= Opt.

Time Expected

6

30 4(12)

= 6 Time

Expected

(40)

40

B 5.33

A 7

C 14

D 5

E 11

F 7

G 11

H 4

I 18 Start

0

Finish 0

Example 2. Network

Duration = 54 Days

(41)

41

Example 2. Probability Exercise

What is the probability of finishing this project in less than 53 days?

p(t < D)

T

E

= 54 t

D=53

cp2

TE

-

= D

Z 

(42)

42

Task Optimistic Most Likely Pessimistic Variance

A 3 6 15 4

B 2 4 14

C 6 12 30 16

D 2 5 8

E 5 11 17 4

F 3 6 15

G 3 9 27

H 1 4 7 1

I 4 19 28 16

(Sum the variance along the critical path.)

2 2

6

Optim.

- Pessim.

=

Activity Variance

41

2 =

(43)

43

There is a 43.8% probability that this project will be completed in less than 53 weeks.

p(Z < -.156) = .438, or 43.8 %

T

E

= 54 D=53

See Excel function NORMDIST

p(t < D)

t

.156 -

41 = 54 -

= 53 T

-

= D

Z 2

cp E

(44)

44

There is a 43.8% probability that this project will be completed in less than 53 weeks.

T

E

= 54 D=53

Using Excel function NORMDIST

(45)

45

Ex 2. Additional Probability Exercise

What is the probability that the project duration will exceed 56 weeks?

(46)

46

Example 2. Additional Exercise Solution

T

E

= 54 t p(t < D)

D=56

p(Z > .312) = .378, or 37.8 %

In Excel use =1-NORMDIST(56,54,sqrt(41),true)

.312 41 =

54 -

= 56 T

-

= D

Z 2

cp E

(47)

47

In Class Example

Activity

Immediate

Predecessors Optimistic

Most

Likely Pessimistic

A - 1 3 5

B - 1 2 3

C A 1 2 3

D A 2 3 4

E B 3 4 11

F C,D 3 4 5

G D,E 1 4 6

H F,G 2 4 5

1. Draw the Network.

2. What is the critical path?

3. What is the expected project completion time 4. What is the variance of the project

5. What is the probability of completing the project within 16 days?

(48)

48

In class – Expected Times and Variance

Activity

Immediate

Predecessors Optimistic

Most

Likely Pessimistic

Expected

Times Variance

A - 1 3 5 3 0.4444

B - 1 2 3 2 0.1111

C A 1 2 3 2 0.1111

D A 2 3 4 3 0.1111

E B 3 4 11 5 1.7778

F C,D 3 4 5 4 0.1111

G D,E 1 4 6 3 5/6 0.6944

H F,G 2 4 5 3 5/6 0.2500

(49)

49

A 3

C 2

F 4

H 3 5/6 Start

0

B 2

E 5

G 3 5/6 D

3

Determine slack times and Critical Path

Activity

Immediate Predecessors

Expected Times

A - 3

B - 2

C A 2

D A 3

E B 5

F C,D 4

G D,E 3 5/6

H F,G 3 5/6

(50)

50

A 0 3

3 5/6 3 5/6

C 3 5 2 4 5/6 6 5/6

F 6 10

4 6 5/6 10 5/6

H 10 5/6 14 2/3

3 5/6 10 5/6 14 2/3

Start 0

B 0 2 2 0 2

E 2 7

5 2 7

G 7 10 5/6

3 5/6 7 10 5/6

D 3 6 3 3 5/6 6 5/6

Determine slack times and Critical Path

Activity

Expected

Times Variance

A 3 0.4444

B 2 0.1111

C 2 0.1111

D 3 0.1111

E 5 1.7778

F 4 0.1111

G 3 5/6 0.6944 H 3 5/6 0.2500

6832 .

1

cp

666 .

14 TE

83333 .

2 2

cp

(51)

51

(52)

52

Time-Cost Models

Basic Assumption: Relationship between activity completion time and project cost

Time Cost Models: Determine the optimum point in time-cost tradeoffs

Activity direct costs

Project indirect costs

Activity completion times

(53)

53

CPM Assumptions/Limitations

Project activities can be identified as entities (There is a clear beginning and ending point for each activity.)

Project activity sequence relationships can be specified and networked

Project control should focus on the critical path

The activity times follow the beta distribution, with the variance of the project assumed to equal the sum of the variances along the critical path

Project control should focus on the critical path

References

Related documents

With regard to the establishment of temporary storage sites and management of disaster-related wastes, the prefectural government should conduct overall coordination with

(2016), Phytochemicals determination and classification in purple and red fleshed potato tubers by analytical methods and near infrared spectroscopy.. This article may be used

In the event that you’re involved in a non-fault accident within the UK where there is an identifiable at-fault third party that renders your vehicle unsafe and/or unlawful to drive,

Brocade delivers a resilient integrated replication solution for mainframe data center connectivity to provide organizations with the best reliability, availability, scalability,

Making sacramental wine requires special attention and care, starting with qvevri washing and marani hygiene and ending with fermentation, aging and storage. During

The result of the study is a conceptual model of knowledge for managerial decision making in the higher education institution network environment that provides strategic,