Randolph Heights Elementary

3150

Project Summary:

Our neighborhood school has strong ties to the community, made even stronger by our dedicated parents and families. As an accredited Core

Knowledge school, our students develop impressive skills in social studies, science, literature, mathematics and the arts. They also have regular classes in visual arts, technology, music and physical education. We are especially proud of our library, which annually circulates more than 40,000 books from an updated collection.

It was originally constructed in 1915 at 26,983 square feet. Later additions were completed in 1920, 1923, and 2013. It is now 50,912 square feet.

Issues Identified By School Community In 2015

1. Instructional Spaces and gathering spaces outfitted for technology 2. Kitchen with dishwasher

3. More storage - books/supplies/materials 4. Parent/community room for gatherings, etc.

5. Evolve library to include media center and technology

6. Improved and additional restrooms - more sinks and toilets - better supervision 7. More space - Instructional Spaces, offices, flexible spaces, staff work areas 8. Larger, safer gym and other areas for physical activity and movement 9. Cafeteria with kitchen adjacent to playground - better acoustics 10. Visible, accessible welcoming front office and entry

Grade Levels: PreK-5 SY 2014/15 Enrollment: 475 Design Enrollment: 480

1

348 Hamline Avenue South

General Notes:

Existing utilization shown is for School Year 2014-2015

The Conceptual Utilization Plans are exploratory rather than actual construction plans and represent the design at one moment in time, which will change as the design and funding process progress.

The Conceptual Plans are included as a way to organize scopes of work into logical, efficient and meaningful projects. There is no prioritization implied in a work scope title (e.g. “Work Scope A” is not necessarily the most critical work to be done).

The plans in this document are not comprehensive of the entire building’s needs as maintenance and replacement of existing building systems such as roofs and mechanical systems are omitted to maintain graphic clarity of the overall vision generated during the Facilities Master Plan Process.

Formal zoning reviews have not been undertaken for the proposed work shown in these plans. A review with zoning and building code authorities will occur once the funding is secured.

(2)

Randolph Heights Elementary

3150

Site Concept

Alterations

New Landscape Construction New Building Construction Service Entry

Property Line Secondary EntryMain Entry

2

Legend:

S1. Multilevel Instructional Space expansion (7,422 SF)

(3)

Randolph Heights Elementary

3150

Existing Utilization

3.1

General Learning Science

Performing Arts

Career & Tech Education Media Center

Dining Athletics Circulation Administration Art

Facilities Support

BASEMENT

(4)

Randolph Heights Elementary

3150

Existing Utilization

3.2

General Learning Science

Performing Arts

Career & Tech Education Media Center

Dining Athletics Circulation Administration Art

Facilities Support

FIRST FLOOR

(5)

Randolph Heights Elementary

3150

Existing Utilization

3.3

General Learning Science

Performing Arts

Career & Tech Education Media Center

Dining Athletics Circulation Administration Art

Facilities Support

SECOND FLOOR

(6)

Randolph Heights Elementary

3150

Conceptual Utilization Plan

Legend:

C1. Reconfigure Mechanical level to Ground Floor (178 SF) C2. Reconfigure OT/PT as Storage level to Ground

Floor (310 SF)

C3. Create new Corridor level to Ground Floor (472 SF) C4. Create new Storage with access to new Gym (130 SF) C5. Create new Stairs with access to new Gym (112 SF) C6. Create new Ramp with access to new Gym (372 SF)

C7. Create new Gym (3,590 SF)

C8. Create new Restrooms (672 SF) C9. Create new handwash stations adjacent to

Corridor (170 SF)

C10. Reconfigure Storage as Corridor with access to

expansion (204 SF)

C11. Create Corridor with access to new

Instructional Spaces (390 SF)

C12. Create new Custodial space (235 SF) C13. Create new Kitchen (752 SF) C14. Create new Cafeteria (3,495 SF)

4.1

Service Entry Property Line Secondary Entry Main Entry

Demolition / Removal New / Existing

General Learning Science

Performing Arts

Career & Tech Education Media Center

Dining Athletics Circulation

Administration Art

Facilities Support ADDITION

EXISTING

(7)

Randolph Heights Elementary

3150

Legend:

C8. Create new Restrooms (510 SF)

C10. Reconfigure Storage as Corridor with access to expansion (212 SF) C11. Create Corridor with access to new Instructional Spaces (895 SF) C16. Reconfigure Offices and Library for Office expansion (714 SF) C17. Create Welcome/Check-In adjacent to Main Entry and Offices (102 SF) C18. Create clear, identifiable Main Entry and 2-story Lobby (258 SF) C19. Reconfigure Library for Pre-K Instructional Space (838 SF) C20. Reconfigure Instructional Space and Corridor for

Pre-K Instructional Space (1,560 SF)

C21. Reconfigure Cafeteria and Stage for Library/Media

Center with open access to Corridor on all sides (3,964 SF) C22. Create new Restroom for toddlers (195 SF) C23. Reconfigure Instructional Space and Corridor for

Special Ed/ELL Instructional Space (727 SF) C24. Reconfigure Storage for gender neutral Restroom (146 SF) C25. Reconfigure SEM and Kitchen for Instructional Space (1,220 SF) C26. Reconfigure Special Ed for Workroom (590 SF) C27. Upgrade finishes for reconfigured Music Room (1,046 SF) C28. Upgrade finishes for reconfigured Instructional Space (1,036 SF) C29. Upgrade existing Restrooms (784 SF) C30. Create new Instructional Space (5,662 SF)

Conceptual Utilization Plan

4.2

PK PK

K PK

K K

Service Entry Property Line Secondary EntryMain Entry Demolition / Removal New / Existing

General Learning Science

Performing Arts

Career & Tech Education Media Center

Dining Athletics Circulation

Administration Art

Facilities Support ADDITION

EXISTING

(8)

Randolph Heights Elementary

3150

Conceptual Construction Plan

5.1

New Construction Heavy Remodel

Light Remodel Finishes Only Medium Remodel

No Work Scope

Package New Con-

struction Heavy Re-

model Medium Re-

model Light Remodel Finishes Only

A 6,790 SF 3,684 SF 874 SF 304 SF

B C D

TOTAL 6,790 SF 3,684 SF 874 SF 304 SF

Line Items Unit Lump Sum

Technology Upgrades

New / Existing

Demolition / Removal ADDITION

EXISTING

(9)

Randolph Heights Elementary

3150

Conceptual Construction Plan

5.2

New Construction Heavy Remodel

Light Remodel Finishes Only Medium Remodel

No Work Scope

Package New Con-

struction Heavy Re-

model Medium Re-

model Light Remodel Finishes Only

A 7,281 SF 212 SF

B 11,245 SF

C 278 SF 6,753 SF

D 65 SF 5,698 SF

TOTAL 7,281 SF 343 SF 9,964 SF 212 SF 5,698 SF

Line Items Unit Lump Sum

Technology Upgrades

New / Existing

Demolition / Removal Open existing skylights

ADDITION EXISTING

References

Related documents

The CICID’s Secretariat consists of members of the Ministry of Foreign and European Affairs (MAEE); the Ministry of Economy, Finance and Industry (Ministère de l’Économie, des

The land development plans have been approved as part of the land development process, but plans for building construction and design need to be addressed if there is actual

NASDAQ OMX - Helsinki 26.12.2016 Christmas Holiday (obs) No Settlement No Trading NASDAQ OMX - Copenhagen 26.12.2016 Christmas Holiday (obs) No Settlement No Trading Hong Kong -

• The assessment of the current operating model identified a typical directorate based model, with some corporate and support service shared across the Council but with a number of

Information from our consultation projects can form a key part of the evidence used in an equality analysis; this is particularly important where our services are

Like all public services, Bedford Borough Council faces signifcant economic challenges in uncertain times, so it is imperative that we ensure our land and property assets are used

Our Goal: A Borough where all the Borough’s children and young people are able to lead safe, healthy and happy lives, and are provided with opportunities to develop their

(a) To ensure that the property interest transferred is retained by the community for the purpose for which it is transferred and, in the case of the transfer of open