Randolph Heights Elementary
3150
Project Summary:
Our neighborhood school has strong ties to the community, made even stronger by our dedicated parents and families. As an accredited Core
Knowledge school, our students develop impressive skills in social studies, science, literature, mathematics and the arts. They also have regular classes in visual arts, technology, music and physical education. We are especially proud of our library, which annually circulates more than 40,000 books from an updated collection.
It was originally constructed in 1915 at 26,983 square feet. Later additions were completed in 1920, 1923, and 2013. It is now 50,912 square feet.
Issues Identified By School Community In 2015
1. Instructional Spaces and gathering spaces outfitted for technology 2. Kitchen with dishwasher
3. More storage - books/supplies/materials 4. Parent/community room for gatherings, etc.
5. Evolve library to include media center and technology
6. Improved and additional restrooms - more sinks and toilets - better supervision 7. More space - Instructional Spaces, offices, flexible spaces, staff work areas 8. Larger, safer gym and other areas for physical activity and movement 9. Cafeteria with kitchen adjacent to playground - better acoustics 10. Visible, accessible welcoming front office and entry
Grade Levels: PreK-5 SY 2014/15 Enrollment: 475 Design Enrollment: 480
1
348 Hamline Avenue South
General Notes:
Existing utilization shown is for School Year 2014-2015
The Conceptual Utilization Plans are exploratory rather than actual construction plans and represent the design at one moment in time, which will change as the design and funding process progress.
The Conceptual Plans are included as a way to organize scopes of work into logical, efficient and meaningful projects. There is no prioritization implied in a work scope title (e.g. “Work Scope A” is not necessarily the most critical work to be done).
The plans in this document are not comprehensive of the entire building’s needs as maintenance and replacement of existing building systems such as roofs and mechanical systems are omitted to maintain graphic clarity of the overall vision generated during the Facilities Master Plan Process.
Formal zoning reviews have not been undertaken for the proposed work shown in these plans. A review with zoning and building code authorities will occur once the funding is secured.
Randolph Heights Elementary
3150
Site Concept
Alterations
New Landscape Construction New Building Construction Service Entry
Property Line Secondary EntryMain Entry
2
Legend:
S1. Multilevel Instructional Space expansion (7,422 SF)
Randolph Heights Elementary
3150
Existing Utilization
3.1
General Learning Science
Performing Arts
Career & Tech Education Media Center
Dining Athletics Circulation Administration Art
Facilities Support
BASEMENT
Randolph Heights Elementary
3150
Existing Utilization
3.2
General Learning Science
Performing Arts
Career & Tech Education Media Center
Dining Athletics Circulation Administration Art
Facilities Support
FIRST FLOOR
Randolph Heights Elementary
3150
Existing Utilization
3.3
General Learning Science
Performing Arts
Career & Tech Education Media Center
Dining Athletics Circulation Administration Art
Facilities Support
SECOND FLOOR
Randolph Heights Elementary
3150
Conceptual Utilization Plan
Legend:
C1. Reconfigure Mechanical level to Ground Floor (178 SF) C2. Reconfigure OT/PT as Storage level to Ground
Floor (310 SF)
C3. Create new Corridor level to Ground Floor (472 SF) C4. Create new Storage with access to new Gym (130 SF) C5. Create new Stairs with access to new Gym (112 SF) C6. Create new Ramp with access to new Gym (372 SF)
C7. Create new Gym (3,590 SF)
C8. Create new Restrooms (672 SF) C9. Create new handwash stations adjacent to
Corridor (170 SF)
C10. Reconfigure Storage as Corridor with access to
expansion (204 SF)
C11. Create Corridor with access to new
Instructional Spaces (390 SF)
C12. Create new Custodial space (235 SF) C13. Create new Kitchen (752 SF) C14. Create new Cafeteria (3,495 SF)
4.1
Service Entry Property Line Secondary Entry Main Entry
Demolition / Removal New / Existing
General Learning Science
Performing Arts
Career & Tech Education Media Center
Dining Athletics Circulation
Administration Art
Facilities Support ADDITION
EXISTING
Randolph Heights Elementary
3150
Legend:
C8. Create new Restrooms (510 SF)
C10. Reconfigure Storage as Corridor with access to expansion (212 SF) C11. Create Corridor with access to new Instructional Spaces (895 SF) C16. Reconfigure Offices and Library for Office expansion (714 SF) C17. Create Welcome/Check-In adjacent to Main Entry and Offices (102 SF) C18. Create clear, identifiable Main Entry and 2-story Lobby (258 SF) C19. Reconfigure Library for Pre-K Instructional Space (838 SF) C20. Reconfigure Instructional Space and Corridor for
Pre-K Instructional Space (1,560 SF)
C21. Reconfigure Cafeteria and Stage for Library/Media
Center with open access to Corridor on all sides (3,964 SF) C22. Create new Restroom for toddlers (195 SF) C23. Reconfigure Instructional Space and Corridor for
Special Ed/ELL Instructional Space (727 SF) C24. Reconfigure Storage for gender neutral Restroom (146 SF) C25. Reconfigure SEM and Kitchen for Instructional Space (1,220 SF) C26. Reconfigure Special Ed for Workroom (590 SF) C27. Upgrade finishes for reconfigured Music Room (1,046 SF) C28. Upgrade finishes for reconfigured Instructional Space (1,036 SF) C29. Upgrade existing Restrooms (784 SF) C30. Create new Instructional Space (5,662 SF)
Conceptual Utilization Plan
4.2
PK PK
K PK
K K
Service Entry Property Line Secondary EntryMain Entry Demolition / Removal New / Existing
General Learning Science
Performing Arts
Career & Tech Education Media Center
Dining Athletics Circulation
Administration Art
Facilities Support ADDITION
EXISTING
Randolph Heights Elementary
3150
Conceptual Construction Plan
5.1
New Construction Heavy Remodel
Light Remodel Finishes Only Medium Remodel
No Work Scope
Package New Con-
struction Heavy Re-
model Medium Re-
model Light Remodel Finishes Only
A 6,790 SF 3,684 SF 874 SF 304 SF
B C D
TOTAL 6,790 SF 3,684 SF 874 SF 304 SF
Line Items Unit Lump Sum
Technology Upgrades
New / Existing
Demolition / Removal ADDITION
EXISTING
Randolph Heights Elementary
3150
Conceptual Construction Plan
5.2
New Construction Heavy Remodel
Light Remodel Finishes Only Medium Remodel
No Work Scope
Package New Con-
struction Heavy Re-
model Medium Re-
model Light Remodel Finishes Only
A 7,281 SF 212 SF
B 11,245 SF
C 278 SF 6,753 SF
D 65 SF 5,698 SF
TOTAL 7,281 SF 343 SF 9,964 SF 212 SF 5,698 SF
Line Items Unit Lump Sum
Technology Upgrades
New / Existing
Demolition / Removal Open existing skylights
ADDITION EXISTING