• No results found

Assessment of Factors Responsible for Delay in Road Construction for Amravati City

N/A
N/A
Protected

Academic year: 2020

Share "Assessment of Factors Responsible for Delay in Road Construction for Amravati City"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 5.1: R.I.I. against Factor Number
Table 5.2: IMPI of Identified Factors of delay for Road Construction.

References

Related documents

Consequently, it will not be permissible for the Bank to execute the Murabahah transaction on the same item with the customer, who was actually agent of bank but due to

The empirical result shows that this corruption news significantly affected the stock market, the t-value for both the 2 days and 5 days event window shows a significant and

In conclusion, this study showed that in a patient group with mainly moderate and severe COPD experience a loss of peripheral muscle strength and endurance, exercise capacity

AHS: anticonvulsant hypersensitivity syndrome; ADR: adverse drug reac- tion; AEDS: antiepileptic drugs; LP: lumber puncture; EBV: Epstein Barr virus; CMV: cytomegalovirus; HSV:

It was decided that with the presence of such significant red flag signs that she should undergo advanced imaging, in this case an MRI, that revealed an underlying malignancy, which

Also, both diabetic groups there were a positive immunoreactivity of the photoreceptor inner segment, and this was also seen among control ani- mals treated with a

For example, under Policy and Legal issues: A= existing National SDI coordinating body, B= good Policy establishing NGDI coordinating Agency, C= available NGDI Champion

In our study, consumption of high zinc biofortified wheat flour for 6 months compared to low zinc bioforti- fied wheat resulted in statistically significant reduction in days