Project Cost Overrun Management in Universities Using Partial Least Squares-Structural Equation Modelling
Full text
Figure
Related documents
The following research attempts to shed light on the question posed by Abril, Levin, and Del Riego in the journal through survey analysis of a sample group on their opinions
Third, the final bill should include the cost of thermal power or storage equipment used as a back-up, because electricity consumption is determined not by wholesale prices but
Certain types of impacts have been investigated more thoroughly than others, with the most commonly examined impact areas being: government revenue (27% of studies),
Two most significant observations of this study are that information gain based feature selection gives better and consistent accuracies than other feature selection algorithms
Therapeutic Modalities for Advanced Melanoma (G.. Harth) Surgery
In this paper we briefly discuss the evidence for a variety of ablative energy modalities available for use in focal therapy of localized prostate cancer including cryotherapy,
Abstract : Although the executive branch appoints Japanese Supreme Court justices as it does in the United States, a personnel office under the control of the Supreme Court
• McGann also argues that Death is in fact not a gentleman caller as typically shown, but rather is an undertaker.. • He views the “He” in the poem not as a personification