Decomposition of integrated hybrid life cycle inventories by origin and final-stage inputs
Full text
Figure
Related documents
Alternatively, R 2 = .4447 implies that about 44% of the variation in the performance of MSMEs (measure by level of productivity) could be accounted for by owner’s level
For those who have ruled out DV, these same obstacles loom even larger: 77 percent cite hardware, software or infrastructure refresh; 54 percent CapEx; 46 percent incompatibility
In recent years, a new generation of vertical-looking entomological radars (VLR) have made it possible to identify and record large insects flying at altitudes , 150–1200 m
Abstract —We propose to view architecting as a risk- and cost management discipline. This point of view helps architects identify the key concerns to address in their decision
Statement on the Timetable for 2015 General Elections by the Chairman, Independent National Electoral Commission (INEC) at a Press Conference on February 7 th.
engineering, chemical & process engineering, and electrical engineering. With the arrival of a new Professor with an international reputation in energy storage, the University
In examining the cost performance of public infrastructure projects an illustrative case study was
In order to identify key nodes in social networks, various centrality measures have been used: Degree, Betweenness, Closeness, PageRank and HITS. These measures compute rankings