2
Logistics to the construction sites of the
Olympics facilities
Transportation services during
Olympics-2014
Transportation services for
“Olympic Family”:
•
up to 700 buses
•
up to 2900 cars
Transportation services for Olympic Games
Visitors:
•
up to 900 special route buses
•
up to 400 public buses
•
up to 1800 route minibuses
Transportation services for
“Olympic Family”:
•
up to 700 buses
•
up to 2900 cars
Transportation services for Olympic Games
Visitors:
•
up to 900 special route buses
•
up to 400 public buses
4
Sochi-2014 Olympics fleet management and
information service
Sportsmen and guests transportation
>3000 cars
Olympic Games Fleet Dispatching and
Management Center
Personal navigation, Olympic POI
GPRS‐internet with Olympic content
Ticketing, broadcasts, timetables
Multimedia
Traffic
Telematic information
Personal safety
Two‐way communication with
emergency services
Logistics challenges faced during the
construction of the Olympics facilities
Limited road network capacity and deficiency of
cargo processing infrastructure
Extremely short construction period
A large number of facilities under
6
Olympics Fleet Management Centre:
Strategic Targets
Uninterrupted delivery of materials to the
construction sites; traffic regulation through
coordination of cargo and transportation
activities
Reliable and safe transportation services for
Olympic Games participants meeting high
quality standards and requirements of the
International Olympic Committee
The Olympic Games Transport Directorate
The Olympic Games Fleet Management Centre
Olympics Fleet Management Center:
Functions
Transportation planning
Fleet monitoring
▫
Long‐distance cargo fleet
▫
Passenger fleet
▫
Special‐purpose vehicles
Cargo monitoring, including hazardous cargo
Vehicle load and usage monitoring
Control of cargo delivery
8
Olympics Fleet Management Center:
Structure
The Olympic Games Fleet Management Center
•Monitoring and dispatching of public transport
•Transportation services for Olympic Games
participants
•Road safety
•Cargo and construction materials
delivery planning
•Cargo transport monitoring and
dispatching
• Cargo transportation security
Monitoring of delivery
by railway
Monitoring of
delivery by air
Monitoring of
delivery by sea
Trucks and Construction
Equipment
Management System
Passenger Fleet
Management System
Emergency Situation
Center
Analytic
Applications
Logistic
planning
System
Warehouses and
Cargo Yards
Management
System
Transport
Modeling
System
Integration platform
Status of the Project
Public transport
250 buses
Municipal Central
Fleet Management
Service
Special transport
140 vehicles
MUNICIPAL TRANSPORT
Private
companies
TonnelDorStroy
14 vehicles
SochiStroyTrans
89 vehicles
The Olympic Games Fleet
Management Center
More than 540
vehicles in total
Black Sea Construction
Company
7 vehicles
Fox‐Trans
21 vehicles
Chosseiny Transport
23 vehicles
10
Olympics Fleet Management Centre:
Main benefits
Increase of efficiency due to:
Real time information on cargo delivery
Better planning of transportation and cargo yards utilization
Improvement of cargo flow management and transportation network
load optimization
Lower risk of emergency situations
Social benefits:
Real time alerting in case of any criminal or emergency situation
involving vehicle under control, including vehicles with dangerous
cargo
Coordination of emergency response services, including police,
ambulance and emercom
Faster and higher quality decision making in case of criminal or
emergency situations involving vehicles
Decrease of Sochi transport network load
Olympics Fleet Management Center:
Economic benefits
Reduction of construction costs by 10 – 15%,
Construction time optimization and quality improvement
Ecological risks reduction
12
Project roadmap
Technical expertise of the existing Olympic Games Transport Directorate
decisions
Design and approval of technical specifications for the Olympic Games Fleet
Management Center
Funds allocation
Contractor selection
Fleet Management Center project design
Equipment installation, personnel training
Fleet Management Center pilot operation
Start of full‐scale operation
February 2010
July –
November 2010
November 2010
December 2010
March 2010
April 2010
May 2010
June 2010
The Olympic Games Fleet
14
Fare collect
service payment/
pass to “Krasnaya
Polyana” resort
Service payment /
pass to beaches
Electronic tickets/
pass to
stadium
Fare collect
Traffic control system
Payment/ pass to
parking
Payment / pass to
museum, arboretum
Complex transport
automation
Fare collect systems and passenger logistics
ERA GLONASS:
Emergency Response System
GSM, GPRS, USW
Satellite connection
16