MINISTRY OF FOREIGN AFFAIRS

AND INTERNATIOANL DEVELOPMENT

FRENCH EMBASSY TO THE UNITED KINGDOM OF GREAT BRITAIN AND NORTHERN IRELAND

Property management Department

CONSULTANT/PROJECT MANAGER

---

PROGRAM

PROJECT : 1 - KNARESBOROUGH PLACE « Facades renovation»

(2)

SOMMAIRE

I – BUILDING PRESENTATION ... 3

II- OPERATION PRESENTATION ... 3

II.1 – Project background ... 3

II.2 – Project objectives ... 3

III – OPERATION CONTENTS ... 4

Administrative procedures ... 4

Documentation... 4

Facades ... 4

Escalier de secours évacuation incendie ... 6

Windows ... 7

Lightwell railings ... 7

Waterproofing ... 8

Internal common parts ... 9

(3)

I – BUILDING PRESENTATION

The project objectives are to renovate the facades, repair the waterproofing and decoration works in the common parts of a dwelling building located at 1 Knaresborough Place. This building is close to Cromwell road and BUPA hospital.

It was built in 1875/1876 but is not listed whereas in a conservation area.

It is a 6 storey building (basement, ground floor and 4 upper floors) with a garden located at the back.

II- OPERATION PRESENTATION

II.1 – Project background

The building consists of 12 flats and some technical premises. It has not beneficiate from heavy renovation for more than 20 years, externally or internally in the common parts.

II.2 – Project objectives

The objective of this project is to restore the shell of the building:

− Control and eventual reparation of the waterproofing on roof, balconies, terraces… ;

− facade renovation, including the fire escape staircase ;

− reparation/replacement of the windows

The common parts decoration may be included in the brief of works. The provisional budget for this project is 300 000 € VAT Included.

(4)

III – OPERATION CONTENTS

This section describes the technical works and services that will be performed in the course of the project.

Administrative procedures

The building being located in a conservatory area, the project manager will be responsible for planning permission procedures. He will prepare the technical documents, plans and notes and make all the necessary arrangements with local authorities with the support of the Embassy of France

Documentation

The contracting company is in charge of preparation the following documents:

• elevation drawings or any floor plans required to fulfil the project;

• any document required by the local authorities in order to obtain all necessary permits;

• all technical specifications required to tender the works. (Specifications, Schedule of works).

Facades

The general condition of the facades is poor. The works will include: cleaning and eventual reparation (by replacement) of the brickworks. Also, some reparations of masonry parts (between floors or around openings) are needed.

Some ornaments

(cornices) under

balconies and roof

edges have some

cracks probably due to some infiltration.

(5)

The consultant will diagnose and list exhaustively all damages on the facade in order to include them in the specifications.

For the masonry parts that will be painted again, the consultant will examined the possibility to apply water repulsive paint.

The brickwork will be protected, once cleaned, by some treatment (silanes siloxanes based for example).

Damaged and cracked cornice Portico entrance

(6)

Facade West Garden side

The garden walls will also be cleaned, repaired and repainted.

Escalier de secours évacuation incendie

A metallic staircase has been installed on the garden side to allow a fire escape for the tenants in case of fire in the internal staircase.

These stairs serve all the floors including the rooftop.

Some corrosion appeared on a lot of places. The consultant shall make an exhaustive list of all the defects and include the eventual reparation.

(7)

Windows

The consultant will check every window and list all reparations to be performed in order to increase soundproofing and diminish heat loss.

A replacement option will be study in order to determine if it is feasible.

Installation of more efficient windows/glass is also a solution to be examined.

This list will be prepared in agreement with the local regulations for windows.

Lightwell railings

The railings protecting the lightwell must be renovated. They will be sand blasted to clear metal, repaired and painted after anti-corrosion treatment.

(8)

Waterproofing

The overhanging parts of the facades, the balconies, terraced roofs and slate covers will be inspected to diagnose any risks of infiltration. Reparations will be included in the brief of works.

(9)

Internal common parts

Some cracks have started to appear on the wall of the common parts. Their reparation will be included in the brief (plaster removal, application of strengthening bands, plaster and painting).

All doors will be stripped of their paint, eventually repaired and repainted. The same treatment will be applied to the stairs handrails.

Some metallic decorative elements of the handrail are to be repaired or replaced.

IV - Schedule.

The operation will be executed in a single tranche. The provisional starting date of works is September 2015.

References

Related documents

The main finding of this paper is that violent economic crime is not influenced by education (even indirectly), while basic education (alphabetization, primary schooling)

Hay que tener en cuenta que la legislación del patrimonio cultural valencia constituida por la Ley 4/1998, del Patrimonio Cultural Valenciano (BOE núm. 71, de 23 de marzo

Complexity Leadership Theory (Uhl-Bien, Marion, and McKelvey, 2007) has made significant strides toward the understanding of leadership as a complex process, but it has failed

This systematic review and meta‑analysis are aimed to estimate the pooled diagnostic accuracy of ultrasound for the diagnosis of pneumonia versus the standard chest

implementation of a TIF program, a jurisdiction risks serious unintended consequences that may make it worse off than it was before the utilization of TIF.. Due to time value of

○ If BP elevated, think primary aldosteronism, Cushing’s, renal artery stenosis, ○ If BP normal, think hypomagnesemia, severe hypoK, Bartter’s, NaHCO3,

Racial and ethnic disparities can be heightened due to lack of access to health care coverage, inadequate cultural competency, lack of appropriate training of health care

I have seen pilots with lower total time receive lower premium quotations than some of their higher-time peers just because their training and experience is specific to the