• No results found

OAKLAND UNIFIED SCHOOL DISTRICT (OUSD) Chapter 6. Design-Build Contract for Photovoltaic System Installation

N/A
N/A
Protected

Academic year: 2021

Share "OAKLAND UNIFIED SCHOOL DISTRICT (OUSD) Chapter 6. Design-Build Contract for Photovoltaic System Installation"

Copied!
37
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. A School District’s Ultimate Objective When Procuring a Solar PV System:     Creating the Highest Value Solar System Use a rigorous, tightly integrated competitive procurement and evaluation process

References

Related documents

you know, I think I brought some things I learned from Ohio State to my community work in those early days, because the Board at that time would spend many meetings

the majority of children will respond to the intracutaneous injection of influenzal vaccine by increasing the amount of serum antibodies at least four times over the

They would not only become aware of their own inner strengths and characteristics (Seligman et al., 2009), but they would also feel the use of true partnership of the family

(B) ​ Engaging Your Writing Students in the Virtual Classroom ​ ​– ​ Stephanie Sommers, Minneapolis Adult Education ​ ​ – In this session, geared towards teachers

Overall, CSI GM systems perform better than expected Similar to 2009, Performance Based Incentive (PBI) systems delivered 7.8% more energy than expected and EPBB systems

Luigi también es el creador de Seducción Subliminal, la herramienta más poderosa que existe Luigi también es el creador de Seducción Subliminal, la herramienta más poderosa que

(2017) conducted a study on farmers’ knowledge in the use of pigeon pea diversity in Benin.The present study aimed to quantify the pigeon pea landrace diversity and assess

Compliance Content Install: On BMCdocs YouTube at http://www.youtube.com/watch?v=bXdaogDsCNc Compliance Quick Audit: On BMCdocs YouTube at http://www.youtube.com/watch?v=i8BLi4WAWEY