• No results found

Waste and labor productivity in production planning case Finnish construction industry

N/A
N/A
Protected

Academic year: 2020

Share "Waste and labor productivity in production planning case Finnish construction industry"

Copied!
11
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1.  The development of labor productivity of twelve construction tasks between the years 1975-2008 in Finland
Figure 2.  The development of the volume of house building projects (million m3)  in Finland (Ahti, 2009) compared with the average development of labor productivity (work hours) studied in TuoVa-project
Figure 3. The terminology of work time used in presenting production data according to the Finnish Ratu-database
Figure 4. Planned and actual work flow on case construction sites (12/2009…4/2010)

References

Related documents

Coverys, the leading medical liability insurer in Rhode Island, has joined forces with RIMS to target new levels of patient safety and physician security while

Any acute complication or sequela (including death) of an illness, dis- ability, injury, or condition referred to above which illness, disability, injury, or condition arose within

As previously indicated, mandatory referendums are instruments that allow citizens to de- cide on particular policies adopted by the political au- thorities; meanwhile,

The Squeezebox Duet package includes Squeezebox Controller, a multi-room wireless controller that lets you browse, select and play your personal music collection, tune to thousands

The Center for Transcultural Learning (CTL) in partnership with Nebraska’s Office of Minority Health (OMH) would like your help. We want to better understand what is working well

The control panel shall be specifically designed and manufactured for use with Flygt pumps and shall include the programmable logic controller LOGIMAC 330 of ITT Flygt and

Män 10 km Snabbare än Blixten Snabbare än Blixten Stadsledningens Geparder 322. Män 5 km Snabbare än ljudet Snabbare än