• No results found

GA27 2749 10 3270 Information Display System Component Description Feb80 pdf

N/A
N/A
Protected

Academic year: 2020

Share "GA27 2749 10 3270 Information Display System Component Description Feb80 pdf"

Copied!
454
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1-1. Host Control Unit and Device Combinations
Figure 2-1. Data Flow between Data Processing System and 3270 Display System
Figure 2-2. United States EBCDIC I/O Interface Code for 3271, 3272, and 3274 Control Units with 3277,3284,3286,3287 (with 3271/3272 Attachment Feature), and 3288 Terminals
Figure 2-3. United States EBCDIC I/O Interface Code for 3274 and 3276 Units and Attached 3278, 3279, 3287 (with 3274/3276 Attachment Feature), and 3289 Terminals
+7

References

Related documents

This survey covers the following pension system activities: revenues by state (earnings on investments, employee contributions, government contributions); expenditures by

In order to ensure a sustainable exploitation of fisheries resources, and help scientists to detect the poor of certain demersal stocks in their countries, we present in this paper

The electrolysis is considered as well as an electrical load connected to the photovoltaic system via a DC/DC buck converter, having a system

Furthermore, levels of Salm protein, the expression of which in tracheal cells depends on Wg signaling (Llimargas, 2000), were increased by 20% in the DT of aop mutants (Fig. 4E,F)

This credit value is increases by the protocol when it receives a route request packet (RREQ) and decreases when it receives the route reply (RREP) packet. When a

The data that has been processed is then used as a basis in the search for the relationship between hotel ranking (high or low) on the Tripadvisor site

In this study, kuguaglycoside C induced signifi- cant cell death at 30 l M, in the absence of activation of caspases or cell cycle arrest in the IMR-32 cells, indicating that

on-line application and budget forms, and it must also be submitted electronically in annex to the on-line application form. The work plan of the project must provide a