• No results found

Ground Water Sections Ground Water Sections

N/A
N/A
Protected

Academic year: 2022

Share "Ground Water Sections Ground Water Sections"

Copied!
9
0
0

Loading.... (view fulltext now)

Full text

(1)

B

SNOQUALMIE

5' - 9"

62' - 0"

133' - 0"

3' - 7" 4' - 2"

80' - 0" 76' - 0"

A

MATTRESS FACTORY TIOGA

LIBRARY

PRAIRIE LINE TRAIL

S C STREET

COMMERCE STREET

3' - 6"

80' - 0"

ARCHITECTURE RESEARCH OFFICE

Ground Water Sections

3 Stories - Opt 1 Flat Ground Flo 2012 UW Tacoma Milgard Hall

09/30/2 PR7

1/32" = 1'-0"

1

Ground Water A (3 Stories-Stepped)

1/32" = 1'-0"

2

Ground Water B (3 Stories-Stepped)

Groundwater Line (Lo Groundwater Line (High)

3'-0" Vertical Offset from High

B

SNOQUALMIE

5' - 9"

62' - 0"

133' - 0"

3' - 7" 4' - 2"

80' - 0" 76' - 0"

A

MATTRESS FACTORY TIOGA

LIBRARY

PRAIRIE LINE TRAIL

S C STREET

COMMERCE STREET

3' - 6"

80' - 0"

ARCHITECTURE RESEARCH OFFICE

Ground Water Sections

3 Stories - Opt 1 Flat Ground Floor 2012 UW Tacoma Milgard Hall

09/30/20 PR7.1

1/32" = 1'-0"

1

Ground Water A (3 Stories-Stepped)

1/32" = 1'-0"

2

Ground Water B (3 Stories-Stepped)

Groundwater Line (Low) Groundwater Line (High)

3'-0" Vertical Offset from High

B

SNOQUALMIE

5' - 9"

62' - 0"

133' - 0"

3' - 7" 4' - 2"

80' - 0" 76' - 0"

A

MATTRESS FACTORY TIOGA

LIBRARY

PRAIRIE LINE TRAIL

S C STREET

COMMERCE STREET

3' - 6"

80' - 0"

ARCHITECTURE RESEARCH OFFICE

Ground Water Sections

3 Stories - Opt 1 Flat Ground Floor 2012 UW Tacoma Milgard Hall

09/30/20 PR7.1

1/32" = 1'-0"

1

Ground Water A (3 Stories-Stepped)

1/32" = 1'-0"

2

Ground Water B (3 Stories-Stepped)

Groundwater Line (Low Groundwater Line (High)

3'-0" Vertical Offset from High

A B

Site sections show the maximum and minimum

groundwater levels in relation to the potential position

of a 3-story building. The

groundwater generally follows the slope of the land with the site’s high point to the southwest. The building’s ground fl oor will maintain a 3’-0” vertical offset between the slab and the maximum groundwater line. Maintaining this offset avoids groundwater infi ltration and mitigates the need to add a vapor mitigation system or below slab drainage system. Refer to Appendix A.6 Geotechnical Supplement for groundwater intrusion mitigation alternatives.

A - North-South Section: Stepped Foundation

B - East-West Section: Stepped Foundation

N.T.S.

Groundwater Section

A N D E R S E N C O N S T R U C T I O N A R C H I T E C T U R E R E S E A R C H O F F I C E

UW Tacoma Milgard Hall 4 December 2020

3.0 Site Analysis pg. 20

(2)

1/32” = 1’-0”

PRAIRIE LINE TRAIL

S C STREET

MATTRESS FACTORY

SNOQUALMIE

S 21S T STREET

PRAIRIE LINE TRAIL

S C STREET

MATTRESS FACTORY

SNOQUALMIE TIOGA LIBRARY

S 21S T STREET

E TRAILT PRAIRIE LINE T PRA

PRA

PRA E T

PRA

TREET S C STR EC TRS R

MATTRESS FACTORY

SNOQUALMIEM TIOGA LIBRARY

S 21S T STREET

98 SPACES

44 SPACES

Connection to Prairie Line Trail Reconfi gured

parking lot

New sidewalk and planters in front of

building New Science Court:

paving and planting

Work area approximately

14,000 SF Primary Building Entrance

Science Court Connection The existing conditions

include parking on the site and adjacent parking along S C Street.

N.T.S.

Several improvements to the site will enhance the approach and landscaping around the new Milgard Hall.

A new science court and the connection between the Prairie Line Trail and South C Street will activate and extend the academic core of campus.

3.4 Site Improvements

A N D E R S E N C O N S T R U C T I O N A R C H I T E C T U R E R E S E A R C H O F F I C E

UW Tacoma Milgard Hall 4 December 2020

3.0 Site Analysis pg. 21

(3)

PRAIRIE LINE TRAIL

S C STREET

MATTRESS FACTORY

SNOQUALMIE TIOGA LIBRARY

S 21S T STREET

PRAIRIE LINE TRAIL

S C STREET

MATTRESS FACTORY

SNOQUALMIE TIOGA LIBRARY

S 21S T STREET

PRAIRIE LINE TRAIL

S C STREET

MATTRESS FACTORY

SNOQUALMIE TIOGA LIBRARY

S 21S T STREET

Potential approaches for situating the new Milgard Hall include planned outdoor spaces, maximizing parking, and allowing for adjacent future development.

1. Create a Science Court

3. Allow for Future Development

2. Maximize Parking

N.T.S.

Site Strategies

A N D E R S E N C O N S T R U C T I O N A R C H I T E C T U R E R E S E A R C H O F F I C E

UW Tacoma Milgard Hall 4 December 2020

3.0 Site Analysis pg. 22

(4)

S 21st ST

JEFFERSON A VE

S C ST PRAIRIE LINE

TRAIL Site Approach

Campus Circulation

Potential approaches for situating the new Milgard Hall include planned outdoor spaces, maximizing parking, both exterior and interior circulation through the building, and allowing for adjacent future development.

N.T.S.

Keeping in mind the urban campus context, the new building will need to respond to the major thoroughfares to the east and west of the site.

TIOGA LIBRAR

Y

SNOQU

ALMIE

MCDONALD SMITH HARMON THE

BUILDING MATTRESS

FACTORY

CHERRY

PARKES PHILIP

HALL WG

Site Strategies - Circulation

A N D E R S E N C O N S T R U C T I O N A R C H I T E C T U R E R E S E A R C H O F F I C E

UW Tacoma Milgard Hall 4 December 2020

3.0 Site Analysis pg. 23

(5)

1

3 1

3

2

4 2

4

The new building will be visible from prominent campus

locations including the Prairie Line Trail, Tioga Library, and Snoqualmie.

N.T.S.

Site Views

A N D E R S E N C O N S T R U C T I O N A R C H I T E C T U R E R E S E A R C H O F F I C E

UW Tacoma Milgard Hall 4 December 2020

3.0 Site Analysis pg. 24

(6)

2

4 3

1

1

3

2

4

The building site is currently the Cragle Lot and contains the remnants of an old coal bunker foundation on the west edge.

N.T.S.

Site Views

A N D E R S E N C O N S T R U C T I O N A R C H I T E C T U R E R E S E A R C H O F F I C E

UW Tacoma Milgard Hall 4 December 2020

3.0 Site Analysis pg. 25

(7)

1

2

3

This plan shows the existing trees on the site. While

protection of existing trees will be a priority, some tree removal is anticipated given the site constraints and proposed building footprint.

1

2 3

Trees to be removed

Tree Preservation/Existing Site Conditions

A N D E R S E N C O N S T R U C T I O N A R C H I T E C T U R E R E S E A R C H O F F I C E

UW Tacoma Milgard Hall 4 December 2020

3.0 Site Analysis pg. 26

(8)

Approximate extent of petroleum contaminated soil (up to 9 feet deep)

Approximate extent of petroleum contaminated soil (up to 20 feet deep)

This plan shows locations of the existing water lines, connections to sewers, and relocated storm drains and detention system.

Utility Exhibit

A N D E R S E N C O N S T R U C T I O N A R C H I T E C T U R E R E S E A R C H O F F I C E

UW Tacoma Milgard Hall 4 December 2020

3.0 Site Analysis pg. 27

(9)

LAYDOWN AREA

SOUTH C STREET TRADE

PARKING BUILDING

SITE

CONSTRUCTION FIELD OFFICE Truck Route

Pedestrian / Student Pathways

• The construction fi eld offi ce will be located in the Tioga Building.

• Onboarding will be required for all trade partners and employees.

• Dust and water control measures will be in place prior to site activities.

• During mobile crane

activities, no parking will be permitted on the west side of South C Street.

• A holding tank will be used for all water settlement prior to discharge; tank indicated in blue.

N.T.S.

3.6 Constructability Logistics Plan

A N D E R S E N C O N S T R U C T I O N A R C H I T E C T U R E R E S E A R C H O F F I C E

UW Tacoma Milgard Hall 4 December 2020

3.0 Site Analysis pg. 28

References

Related documents

As the voltage of TE units and the voltages of all fans are adjusted to their optimal values, both the total power supplies and the heat transfer through the inner pane of the

This opens the possibility of improving considerably the statistics and reliability of the lo- cal age–metallicity relation, simply by acquiring spectroscopic data for a larger

Ahmed Al Amiri, Ramla Karama, "The Effectiveness of Professional Development Programs Offered to Heads of Faculty in Kindergartens and Primary Schools in Al Ain by Abu

Tier 1 Attributes – “Mission Critical” Tier 2 Attributes – “Strong Priority ” Tier 3 Attributes – “Product Differentiators” Reward Channels Customer Channels

In this study, the engine performance and exhaust emission of direct injection diesel engine fuelled with methyl esters of beef tallow as neat biodiesel and its blend with diesel

That the existence of interior matching equilibria so strongly depends on income distribution as shown in this section moreover suggests that the range of income redistribution

coaches as well as the way these relationships impact overall staff professional development. The findings of this study suggest that the coach and coachee are deeply embedded in the

Best Practices for Managing the Fuzzy Front-End of Software Development (SD): Insights From a Systematic Review of New Product Development..